ADDENDUM 4 - JULY 31, 2015
14
ADDENDUM 4 - JULY 31, 2015
19
ADDENDUM 4 - JULY 31, 2015
20
ADDENDUM 4 - JULY 31, 2015
21
ADDENDUM 4 - JULY 31, 2015
22
ADDENDUM 4 - JULY 31, 2015
23
ADDENDUM 4 - JULY 31, 2015
24
ADDENDUM 4 - JULY 31, 2015
25
ADDENDUM 4 - JULY 31, 2015
42
ADDENDUM 4 - JULY 31, 2015
43
ADDENDUM 4 - JULY 31, 2015
51
ADDENDUM 4 - JULY 31, 2015
52
ADDENDUM 4 - JULY 31, 2015
139
ADDENDUM 4 - JULY 31, 2015
140
ADDENDUM 4 - JULY 31, 2015
141
ADDENDUM 4 - JULY 31, 2015
KEYNOTES
8’ 17’
STA. 18+38.58
11
11
6
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
LIMITS OF
GM
4
JBE
JBE
JBE
JBE
TSB
JBE
16’
14
TSB
PAISANO DR
3
PROTECT EXISTING LIGHT POLE
4
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
5
EXISTING RAMP(S) TO REMAIN UNDISTURBED
REMOVE/REPLACE SIDEWALK
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
PROPOSED CONCRETE TRACK SLAB
MILL/OVERLAY PAVEMENT FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION
11 PROTECT/TO REMAIN UNDISTURBED FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION
12 EXISTING UTILITY BOX. SEE NOTE 4
SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS 14 EXISTING POWER POLE TO BE RELOCATED
REMOVE/REPLACE CURB & GUTTER
21+00
20+00
19+00
MATCH LINE STA 21+00
34’
[ DT
5
J TSB BE
7
STA. 20+64.62
SANTA FE ST
12’
56’
STA. 20+33.59
STA. 18+58.72
8’
STA. 19+13.49
STA. 18+82.79
STA. 18+33.28
STA. 18+33.13
PAISANO DR
STA. 17+11.51
26’
51’
18+00
MATCH EXISTING PAVEMENT
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3
10 REMOVE AND SALVAGE EXISTING PARKING METER
JBE
MATCH LINE STA 17+00
gerardo
TSB
CK: URS
CONSTRUCTION
2
TSB TSB
DW: URS
LIMITS OF
TSB
5
2
STREETCAR ALIGNMENT
TSB
5
WV
CK: URS
TSB TSB
WV
TSB
TSB
5
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
CONSTRUCTION LIMITS
TRACK SLAB
17+00
DN: URS
TST BSB
TSB
STA. 17+20.92
1 MATCH EXISTING PAVEMENT
LEGEND
8
8
REFER TO DRIVEWAY 12 LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
CONSTRUCTION
15 EXISTING MAILBOX TO BE RELOCATED
PROPOSED OCS POLE SEE NOTE 8.
16 EXISTING TREE/BUSH TO BE RELOCATED 17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
NOTES: 1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS.
/
/
/
/
/
/
APPROVED
REVISED PAVEMENT LIMITS
MM
MARCOS MEDINA
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
93830
BENCH 8’
43’
2
[ DT
23+00
13’
17 17
24+00
25+00 4’
JBE
4
7 1
MATCH EXISTING PAVEMENT
STA. 24+10.80
12
SEE INTERSECTION SHEETS FOR NEW RAMP CONFIGURATIONS
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION C 2013
FE O L TY I
THE
C
STA. 17+00 - STA. 25+00 T exas T ransportation
SO PA
18
TEXAS
TSB
OVERLAND AVE
WV
STA. 23+27.68
CONSTRUCTION
STA. 23+14.44
LIMITS OF
8
TSB
3
WV
11
STA. 22+99.44
11 JB JBE E
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
JBE
8
MATCH LINE STA 25+00
21’
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
11
8
JBE
MATCH LINE STA 21+00
REVISION
7 /14/15
2
8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
8
4
SCALE IN FEET DATE
7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED.
WV
17
7
40’
6. REFER TO PAVEMENT CROSS SECTIONS.
TSB
WV
JBE
SANTA FE ST
JBE
3:34:23 PM
4
17
2
T
DATE: 7/13/2015
7
20’
17
22+00
21+00
FILE: F:\12111\DGN\RDW_SR_DT_02.dgn
11
3
TSB
JBE
TSB
TSB
TRACK SLAB
5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
11
11
0’
NO
STA. 24+75.10
3
MATCH EXISTING PAVEMENT
TSB
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
11
STA. 23+29.72
LIMITS OF CONSTRUCTION
STA. 23+25.25
18
4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS.
BENCHES
OVERLAND AVE
3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN.
BASE BID SHEET
CONT
SECT
C101 JOB
HIGHWAY
VARIOUS DIST
COUNTY
SHEET NO.
EL PASO
EL PASO
143
MATCH EXISTING PAVEMENT
75'
STA. 27+06.80
SAN ANTONIO AVE
12'
STA. 26+21.15
STA. 25+40.05
STA. 25+55.05
30'
MATCH LINE STA 25+00
33'
4
0 +0 29
STA. 28+79.27
3
STA. 27+61.02
40' 16'
1
SAN ANTONIO AVE
STA. 26+14.16
4
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
5
EXISTING RAMP(S) TO REMAIN UNDISTURBED
REMOVE/REPLACE SIDEWALK
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
PROPOSED CONCRETE TRACK SLAB
MILL/OVERLAY PAVEMENT FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS 14 EXISTING POWER POLE TO BE RELOCATED
REMOVE/REPLACE CURB & GUTTER
15 EXISTING MAILBOX TO BE RELOCATED
PROPOSED OCS POLE SEE NOTE 8.
R=428'
LIMITS OF CONSTRUCTION
MATCH EXISTING PAVEMENT
17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
M ET ER
7
12'
8'
4'
STA. 25+40.05
3
4
GM
7
PROTECT EXISTING LIGHT POLE
12 EXISTING UTILITY BOX. SEE NOTE 4
JBE
J TB SE B TB J SE B
8
3
16 EXISTING TREE/BUSH TO BE RELOCATED
16
5
7
JB T SE B
STA. 25+14.87
R=15' JBE
JBE JB T SE B
TSB
DN: URS
28+00
27+00
5
17
7
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3
11 PROTECT/TO REMAIN UNDISTURBED
0 +0 29
3712.80
6'
R=25'
3712.61
383980.2630, 10655760.7418
12
WV
26+00
2
10 REMOVE AND SALVAGE EXISTING PARKING METER
A ST
$USER$
NE LI
[ DT
17
WV
CK: URS
H TC MA
ST FE TA SAN TRACK SLAB
17
J TB SE B
DW: URS
J J BE B E
NEW RAMP CONFIGURATIONS
R=30'
TSB
CK: URS
SEE INTERSECTION SHEETS FOR
3
25+00
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
STREETCAR ALIGNMENT
JJ BB EE
2
7
LEGEND
CONSTRUCTION LIMITS
JBE
17
5
TB SE J B
TB J SE B
R=15'
1
JBE
17
WV
3
WV WV
TB SE J B TB SE J B
STA. 25+21.14
JBE
7
ADDENDUM 4 - JULY 31, 2015
KEYNOTES
LIMITS OF CONSTRUCTION
MATCH EXISTING PAVEMENT
NOTES:
JBE
1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS. 3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN.
5 LIMITS OF CONSTRUCTION
3
JB E
STA. 31+78.71
STA. 31+52.89
18
4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS. 5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
19'
J TB SE B
ET ER
10'
6'
/
/
/
6'
STA. 31+34.30
STA. 30+79.05
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
7/23/2015
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION
W V V
MATCH EXISTING PAVEMENT
93830
W
STA. 30+61.61
CONSTRUCTION
JB E
STA. 30+37.69
13
LIMITS OF
E T
WW VV
STA. 30+13.91
3
E B
SEE INTERSECTION SHEETS FOR
1 W JB J TB V E EP J S JB B
6
V
STA. 25+00 - STA. 33+00 C
MAIN ST
C 2013
FE O L TY I
T exas T ransportation
SO PA
CT
33+00
W
V
SH EL DO N
V
4
1
5
NEW RAMP CONFIGURATIONS
18
/
THE
4'
32'
32'
W
4:02:53 PM
R=15'
5
JB T
MATCH EXISTING PAVEMENT
MM
W
DATE: 7/23/2015
TRACK SLAB
T JB S E B
JB T SE B
5
JB T ST B
I C V
I C V
I C V
JB E
FILE: F:\12111\DGN\RDW_SR_DT_03.dgn
V
V
W
W
JT B JS B EB E
14
MM
REVISED PAVEMENT LIMITS
MARCOS MEDINA
MATCH LINE STA 33+ 00
MATCH LINE STA 29+00
9'
B TJ JS BBE E
M I ET C W I ER CV V V JBJB EE I C V I C V
JB E
I C V
16
REVISED PAVEMENT LIMITS
7 /24/15
8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
5
32+00
5
APPROVED
7 /14/15
3
7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED.
31+00
12
I C V
I C V
4
6
8
13
REVISION
2
6. REFER TO PAVEMENT CROSS SECTIONS.
R=10'
R=128'
40'
3
JB T SE B
M
JJ BB EE
3
5
30+00
DATE
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
SANTA FE ST
29+00
20'
SCALE IN FEET NO
5
[ DT
17
0'
TEXAS
BASE BID SHEET
CONT
SECT
C102 JOB
HIGHWAY
VARIOUS DIST
COUNTY
SHEET NO.
EL PASO
EL PASO
144
ADDENDUM 4 - JULY 31, 2015
KEYNOTES 1
LEGEND
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
CONSTRUCTION LIMITS
CONSTRUCTION 3
35+00
6'
18' 17
30'
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
MILL/OVERLAY PAVEMENT FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS 14 EXISTING POWER POLE TO BE RELOCATED
REMOVE/REPLACE CURB & GUTTER
15 EXISTING MAILBOX TO BE RELOCATED
PROPOSED OCS POLE SEE NOTE 8.
16 EXISTING TREE/BUSH TO BE RELOCATED
L I N E
V
8'
W
17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
BENCH
M A T C H
JBJB EE TP
1
6 1
JB E
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
3 6 + 0 0
9'
14'
16'
V
STA. 34+26.95
W
V
TS B
JB T SE B
G M
J JB BE T
W
MAIN DR
3
W
R=46.5'
JB E
8
JB T
TB J S E B
MATCH LINE STA 33+00
REMOVE/REPLACE SIDEWALK
11 PROTECT/TO REMAIN UNDISTURBED
3 6 + 0 0
$USER$
EXISTING RAMP(S) TO REMAIN UNDISTURBED
V
G V
[ DT
JB E
JB E
V
CK: URS
5
PROPOSED CONCRETE TRACK SLAB
12 EXISTING UTILITY BOX. SEE NOTE 4
W
DW: URS
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
22'
34+00
J JB BE E
CK: URS
W
V
V
CW O
CW O
I C V
JB E
W
V V
V
DN: URS
T
G V
ET ER
2
8 5
4
JB
JB T M
G V
SANTA FE ST
W
W
33+00
TS B
JB T
TS B
JB E
5
3
PROTECT EXISTING LIGHT POLE
10 REMOVE AND SALVAGE EXISTING PARKING METER
S T A
3
3
5
STA. 35+15.29
5
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3 STREETCAR ALIGNMENT
BALLPARK
LIMITS OF
2
7
SEE INTERSECTION SHEETS FOR NOTES:
NEW RAMP CONFIGURATIONS
W V V
BATAAN MEMORIAL TRAINWAY OVERPASS REHABILITATION. REFER TO PROJECT No. BR 2013-942
1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS.
SANTA FE ST
3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN. 4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS.
LIMITS OF CONSTRUCTION
0'
*ADD ALTERNATIVE REFER TO BID DOCUMENTS
2
DATE
7 /14/15 7 /24/15
3
/
JB TS T E B SB
JB TS T B
E P
10
LIMITS OF CONSTRUCTION
10
8
W V
MATCH EXISTING PAVEMENT ME TE R
MATCH LINE STA 40+00
24'
26'
14'
JBE
STA. 39+47.55
10
3
STA. 38+82.65
4
5
EL PASO ST
*ADD ALTERNATIVE REFER TO BID DOCUMENTS
5
T
3
3 6 + 0 0
TP JB T JBE
JB T
8'
ME TE R
10'
W V
4'
M M E E TE T R ER
STA. 37+62.28
9
JB T
STA. 37+34.61
4:09:03 PM
M E TE R
40+00
39+00
5
METER
93830
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
7/23/2015
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION STA. 33+00 - STA. 40+00 C 2013
FE O L TY I
T exas T ransportation
SO PA
DATE: 7/23/2015
38+00
L I JBJB N EE E S T A
5 11
W V
13 J JB BE T
[ DT
37+ 00
3 6 + 0 0
FILE: F:\12111\DGN\RDW_SR_DT_04.dgn
5
11
R=20'
17
2
FRANKLIN AVE
10 '
10'
W V
W V R=46.5'
M A T C H
MARCOS MEDINA
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
5
3 W V
MM
8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
J BE
JB T
C
1 JB T
7'
TS B
8'
JB E
MM
REVISED PAVEMENT LIMITS
7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED.
3
JB E
W V
MM
ADD ALTERNATIVE
/
THE
NEW RAMP CONFIGURATIONS
7
APPROVED
REVISED PAVEMENT LIMITS
6. REFER TO PAVEMENT CROSS SECTIONS.
SEE INTERSECTION SHEETS FOR
W V
5
REVISION
7 /14/15
2
35'
8
40'
SCALE IN FEET NO
5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
20'
TEXAS
C103
BASE BID SHEET
CONT
SECT
JOB
HIGHWAY
VARIOUS DIST
COUNTY
SHEET NO.
EL PASO
EL PASO
145
ADDENDUM 4 - JULY 31, 2015
KEYNOTES
STA. 20+64.62
17’
STA. 18+38.58
PAISANO DR
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
LIMITS OF
GM
11
6
JBE
4
11
JBE
JBE
JBE
JBE
TSB
JBE
16’
14
TSB
J TSB BE
7
3
PROTECT EXISTING LIGHT POLE
4
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
5
EXISTING RAMP(S) TO REMAIN UNDISTURBED
REMOVE/REPLACE SIDEWALK
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
PROPOSED CONCRETE TRACK SLAB
MILL/OVERLAY PAVEMENT FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION
11 PROTECT/TO REMAIN UNDISTURBED FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION
12 EXISTING UTILITY BOX. SEE NOTE 4
SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS 14 EXISTING POWER POLE TO BE RELOCATED
REMOVE/REPLACE CURB & GUTTER
21+00
20+00
19+00
MATCH LINE STA 21+00
33’ 8’
[ DT
5
MATCH EXISTING PAVEMENT
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3
10 REMOVE AND SALVAGE EXISTING PARKING METER
SANTA FE ST
34’
56’
STA. 20+33.59
STA. 18+58.72
8’
STA. 19+13.49
STA. 18+82.79
STA. 18+33.28
STA. 18+33.13
PAISANO DR 51’
STA. 17+11.51
26’
MATCH LINE STA 17+00
gerardo CK: URS
CONSTRUCTION
TSB
18+00
TSB TSB
DW: URS
LIMITS OF
TSB
5
2
STREETCAR ALIGNMENT
TSB
5
WV
CK: URS
TSB TSB
WV
TSB
TSB
5
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
CONSTRUCTION LIMITS
TRACK SLAB
17+00
DN: URS
TST BSB
TSB
STA. 17+20.92
1 MATCH EXISTING PAVEMENT
LEGEND
8
8
REFER TO DRIVEWAY 12 LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
CONSTRUCTION
15 EXISTING MAILBOX TO BE RELOCATED
PROPOSED OCS POLE SEE NOTE 8.
16 EXISTING TREE/BUSH TO BE RELOCATED 17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
NOTES: 1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS.
11 7
3 4
17
40’
SCALE IN FEET
/
/
/
/
/
/
/
/
REVISION
APPROVED
6. REFER TO PAVEMENT CROSS SECTIONS. 7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED. 8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
TSB
WV
MARCOS MEDINA
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
WV
BENCH JBE
TSB
JBE
TSB
TSB
17
7
20’
DATE
5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
11
11
0’
NO
STA. 24+75.10
3
11
MATCH EXISTING PAVEMENT
TSB
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
STA. 23+29.72
LIMITS OF CONSTRUCTION
STA. 23+25.25
18
4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS.
BENCHES
OVERLAND AVE
3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN.
93830
17
13’
24+00
25+00 4’ 7
1
MATCH EXISTING PAVEMENT
STA. 24+10.80
12
SEE INTERSECTION SHEETS FOR NEW RAMP CONFIGURATIONS
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION C 2013
FE O L TY I
THE
C
STA. 17+00 - STA. 25+00 T exas T ransportation
SO PA
18
TEXAS
TSB
OVERLAND AVE
WV
STA. 23+27.68
CONSTRUCTION
8
STA. 23+14.44
LIMITS OF
STA. 22+99.44
3
TSB
11
WV
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
4
11 JB JBE E
8
JBE
4
MATCH LINE STA 25+00
8’
43’
32’
17 JBE
8:20:09 AM
17
JBE
DATE: 6/19/2015
[ DT
8
T
FILE: F:\12111\DGN\RDW_SR_DT_02.dgn
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
11
8
23+00
22+00
21+00
JBE
MATCH LINE STA 21+00
SANTA FE ST TRACK SLAB
ADD-ALTERNATIVE SHEET
CONT
SECT
C101 JOB
HIGHWAY
VARIOUS DIST
COUNTY
EL PASO
EL PASO
SHEET NO.
143
MATCH EXISTING PAVEMENT
75’
STA. 27+06.80
SAN ANTONIO AVE
12’
STA. 26+21.15
STA. 25+55.05
STA. 25+40.05
42’
46’
MATCH LINE STA 25+00
4
0 +0 29
STA. 28+79.27
3
STA. 27+61.02
40’ 16’
1
SAN ANTONIO AVE
STA. 26+14.16
4
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
5
EXISTING RAMP(S) TO REMAIN UNDISTURBED
REMOVE/REPLACE SIDEWALK
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
PROPOSED CONCRETE TRACK SLAB
MILL/OVERLAY PAVEMENT FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS 14 EXISTING POWER POLE TO BE RELOCATED
REMOVE/REPLACE CURB & GUTTER
15 EXISTING MAILBOX TO BE RELOCATED
PROPOSED OCS POLE SEE NOTE 8.
R=428’
LIMITS OF CONSTRUCTION
MATCH EXISTING PAVEMENT
17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
M ET ER
7
12’
8’
4’
STA. 25+40.05
3
4
GM
7
PROTECT EXISTING LIGHT POLE
12 EXISTING UTILITY BOX. SEE NOTE 4
JBE
J TB SE B TB J SE B
8
3
16 EXISTING TREE/BUSH TO BE RELOCATED
16
5
7
JB T SE B
STA. 25+14.87
R=15’ JBE
JBE JB T SE B
TSB
DN: URS
28+00
27+00
5
17
7
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3
11 PROTECT/TO REMAIN UNDISTURBED
0 +0 29
3712.80
6’
R=25’
3712.61
383980.2630, 10655760.7418
12
WV
26+00
2
10 REMOVE AND SALVAGE EXISTING PARKING METER
A ST
gerardo
NE LI
TRACK SLAB
17
WV
CK: URS
H TC MA
ST FE TA SAN
17
J TB SE B
DW: URS
J J BE B E
NEW RAMP CONFIGURATIONS
R=30’
TSB
CK: URS
SEE INTERSECTION SHEETS FOR
[ DT
25+00
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
STREETCAR ALIGNMENT
JJ BB EE
7
LEGEND
CONSTRUCTION LIMITS
JBE
17
5
TB SE J B
TB J SE B
R=15’
1
JBE
17
WV
3
WV WV
TB SE J B TB SE J B
STA. 25+21.14
JBE
7
ADDENDUM 4 - JULY 31, 2015
KEYNOTES
LIMITS OF CONSTRUCTION
MATCH EXISTING PAVEMENT
NOTES:
JBE
1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS. 3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN.
5 LIMITS OF CONSTRUCTION
3
JB E
STA. 31+78.71
STA. 31+52.89
18
4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS.
NO
J TB SE B
ET ER
B TJ JS BBE E
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION
W W V V
MATCH EXISTING PAVEMENT
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
WW VV
STA. 25+00 - STA. 33+00 C
MAIN ST
T exas T ransportation
SO PA
18
C 2013
FE O L TY I
THE
4’
6’
10’ 6’
STA. 31+34.30
CONSTRUCTION
JB E
STA. 30+79.05
13
LIMITS OF
E T
STA. 30+61.61
3
E B
STA. 30+37.69
1 W JB J TB V E EP J S JB B
STA. 30+13.91
V
CT
W
SEE INTERSECTION SHEETS FOR NEW RAMP CONFIGURATIONS
V
SH EL DO N
V
10:05:21 AM
MATCH LINE STA 33+ 00
51’
41’
MATCH LINE STA 29+00
W
4
6
/
93830
W
DATE: 6/19/2015
R=15’
33+00
JB T
JB T SE B
MATCH EXISTING PAVEMENT
JB T ST B
I C V
I C V
5
1
5
/
/
APPROVED
MARCOS MEDINA
5 T JB S E B
5
JT B JS B EB E
14 I C V
JB E
FILE: F:\12111\DGN\RDW_SR_DT_03.dgn
V
V
W
W
M I ET C W I ER CV V V JBJB EE I C V I C V
JB E
I C V
16
32+00
31+00
12
I C V
I C V
4
6
8
13
/
REVISION
8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
TRACK SLAB
R=128’
/
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
R=10’
30+00
/
/
7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED.
JB T SE B
M
JJ BB EE
29+00
DATE /
3
SANTA FE ST
5
40’
6. REFER TO PAVEMENT CROSS SECTIONS.
[ DT
17
20’
SCALE IN FEET
5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
5 5
0’
TEXAS
ADD-ALTERNATIVE SHEET
CONT
SECT
C102 JOB
HIGHWAY
VARIOUS DIST
COUNTY
EL PASO
EL PASO
SHEET NO.
144
ADDENDUM 4 - JULY 31, 2015
KEYNOTES 1
LEGEND
EXISTING ROW LINE
CONFLICT WITH TRAFFIC SIGNAL. SEE NOTE 2
CONSTRUCTION LIMITS
2
EXISTING SUN METRO SIGN/BENCH. SEE NOTE 3
3
PROTECT EXISTING LIGHT POLE
4
REPLACE/RELOCATE/REMOVE EXISTING SIGN SEE NOTE 2 & 12
5
EXISTING RAMP(S) TO REMAIN UNDISTURBED
REMOVE/REPLACE SIDEWALK
6
ABANDON EXISTING LIGHT/FOUNDATION SEE SHEET N109
REMOVE/REPLACE DRIVEWAY
7
RELOCATE/ADJUST EXISTING TRAFFIC SIGNAL BOX. SEE NOTE 2
DRIVEWAY RIGHT OF ENTRY
8
RELOCATE/ADJUST EXISTING ELECTRICAL BOX
9
RELOCATE/ADJUST EXISTING COMMUNICATION BOX
STREETCAR ALIGNMENT
LIMITS OF CONSTRUCTION 3
STA. 35+15.29
18'
6'
16'
35+00
45'
STA. 34+26.95
V
REMOVE/REPLACE CURB & GUTTER PROPOSED OCS POLE SEE NOTE 8.
16 EXISTING TREE/BUSH TO BE RELOCATED 17 PROPOSED RAMP 18 APPROXIMATE HISTORIC STREETCAR TRACK ALINGMENT
BENCH
M A T C H
JBJB EE TP
1
6 1
JB E
REFER TO DRIVEWAY LAYOUT SHEETS TRANSITIONAL AREA RIGHT OF ENTRY REQUIRED
14 EXISTING POWER POLE TO BE RELOCATED 15 EXISTING MAILBOX TO BE RELOCATED
L I N E
V
8'
W
TS B
JB T SE B
G M
J JB BE T
W
MAIN DR
W
V
17
SEAL COAT EXISTING ASPHALT PAVEMENT (CSS-1H)(0.2GAL/SY)
13 EXISTING FIRE HYDRANT, SEE PROPOSED UTILITY PLANS
W
R=46.5'
JB E
JB T
TB J S E B
MATCH LINE STA 33+00
3
3 6 + 0 0
$USER$
V
G V
JB E
JB E
CK: URS
W
V
V
CW O
CW O
I C V
JB E
V
J JB BE E
8
FULL DEPTH CONCRETE PAVEMENT RECONSTRUCTION
12 EXISTING UTILITY BOX. SEE NOTE 4
34+00
8 5
[ DT
FULL DEPTH ASPHALT PAVEMENT RECONSTRUCTION
11 PROTECT/TO REMAIN UNDISTURBED
22'
W V
V
DW: URS
T
G V
ET ER
W
V W
CK: URS
JB
JB T M
G V
2
W
3
33+00
DN: URS
TS B
JB T
TS B
JB E
5
SANTA FE ST
MILL/OVERLAY PAVEMENT
10 REMOVE AND SALVAGE EXISTING PARKING METER
3 6 + 0 0
3
5
S T A
5
PROPOSED CONCRETE TRACK SLAB
7
SEE INTERSECTION SHEETS FOR NOTES:
NEW RAMP CONFIGURATIONS
W V V
BATAAN MEMORIAL TRAINWAY OVERPASS REHABILITATION. REFER TO PROJECT No. BR 2013-942
1. STATIONS SHOWN ARE APPROXIMATE. CONCRETE SIDEWALKS/CURB & GUTTER SHALL BE REPLACED TO NEAREST JOINT. 2. REFER TO TRAFFIC SHEETS FOR SIGNS AND TRAFFIC SIGNAL IMPROVEMENTS.
SANTA FE ST
3. COORDINATE WITH SUN METRO FOR REMOVAL/REPLACEMENT OF ANY BUS STOP SIGNS/BENCHES SHOWN ON THIS PLAN. 4. ALL MANHOLES, VALVES, BOXES, ETC. TO REMAIN IN PLACE SHALL BE ADJUSTED TO NEW PAVEMENT/SIDEWALK GRADES. REFER TO UTILITY SHEETS FOR ANY UTILITY RELOCATIONS.
LIMITS OF CONSTRUCTION
0'
DATE
7 /14/15 7 /24/15
3
/
NEW RAMP CONFIGURATIONS
7
1 JB T
JB TS T E B SB
JB TS T B
E P
14'
LIMITS OF CONSTRUCTION
10
8
MATCH EXISTING PAVEMENT ME TE R
STA. 39+47.55
10
W V
EL PASO ST
10
3
5
5
7/24/2015
11.REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT SHALL BE TO THE NEAREST JOINT AND SHALL BE SAW-CUT TO NEAT LINE.
M oreno Cardenas Inc. Leaders in Project Delivery & Performance
12.NEW LOCATIONS FOR ITEMS TO BE RELOCATED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE CITY INSPECTOR.
TBPE Firm Registration No. F-000554
2829 Montana Suite 206
12.REFER TO PLAN & PROFILE DRAINAGE SHEETS FOR IMPROVEMENTS
El Paso, Texas 79903 (915) 493-6468
TBPE REGISTRATION NO. F-3162
COEP STREETCAR
DOWNTOWN LOOP STREET RECONSTRUCTION STA. 33+00 - STA. 40+00 C
JBE
METER
10.REFER TO PROPOSED STREETCAR STOP SHEETS FOR ADDITIONAL INFORMATION.
C 2013
FE O L TY I
THE
8'
5
STA. 38+82.65
STA. 37+62.28
4
MATCH LINE STA 40+00
24'
26'
TP JB T JBE
JB T
T
3
3 6 + 0 0
10'
ME TE R
4'
W V
STA. 37+34.61
2:22:31 PM
M M E E TE T R ER
JB T
40+00
39+00
93830
T exas T ransportation
SO PA
DATE: 7/24/2015
M E TE R
9
5 11
W V
13 J JB BE T
[ DT
38+00
3 6 + 0 0
FILE: F:\12111\DGN\RDW_SR_DT_04-old.dgn
5
11
R=20'
17
L I JBJB N EE E S T A
MARCOS MEDINA
37+ 00
W V R=46.5'
M A T C H
FRANKLIN AVE
10 '
10'
W V
MM
/
9. REFER TO ROADWAY TYPICAL SECTIONS FOR ADDITIONAL INFORMATION.
5
3 W V
MM
REVISED PAVEMENT LIMITS
8. REFER TO OCS SHEETS FOR PROPOSED OCS IMPROVEMENTS.
J BE
JB T
7'
TS B
8'
JB E
MM
ADD ALTERNATIVE
7. REFER TO TRAFFIC SHEETS FOR TRAFFIC RELATED ITEMS SHOWN TO BE RELOCATED.
3
JB E
W V
APPROVED
REVISED PAVEMENT LIMITS
6. REFER TO PAVEMENT CROSS SECTIONS.
SEE INTERSECTION SHEETS FOR
W V
5
REVISION
7 /14/15
2
35'
8
40'
SCALE IN FEET NO
5. SEE TRACK PLAN AND PROFILE SHEETS FOR CONCRETE TRACK SLAB QUANTITIES, PLACEMENT AND CONSTRUCTION.
20'
TEXAS
C103
ADD-ALTERNATIVE SHEET
CONT
SECT
JOB
HIGHWAY
VARIOUS DIST
COUNTY
SHEET NO.
EL PASO
EL PASO
145