ArcGIS Pipeline Data Model History of the Model Overview of the Model • Routing, Facilities, Operations, Encroachments, Generic Support, Geobase, Integrity and Inspection
Future of the Model
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
History
Based on 1997 published GRI ISAT Model Initial template Presentation at 2002 ESRI User Conference First Review Meeting – Aug. 2002 Redlands Second Draft Release final version – March 2003 Model and documentation available online at: http://arconline.esri.com/arconline/datamodels_one.cfm?PI D=1&id=25
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
History
The model is not pure ISAT or PODS The model incorporates ESRI technology • Routes/Measures/Events Model is being developed by the technical committee of the Pipeline Interest Group PIG (subset of Petroleum User Group PUG) Future direction of the model will be set by the PIG Steering Committee
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Overview
The model is comprehensive Models all aspects of a transmission pipeline: • engineering, maintenance, field inspection, operations, regulatory compliance, integrity and risk assessment.
Choose to implement which features make sense to your organization The model forms the basis of a geodatabase
Stationing, station series, alternate referencing Dynamic segmentation Geometric Networks
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Centerline
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Centerline Centerline 06+00/00+00
A100-01
03+00
04+00
03+50 01+00
A100-02 01+00
02+00
250+00
00+00
B200-01 01+00
02+00
C200-01 03+00
A100-02 100+00
Station Series Name Station Value Control Point: End-Point Control Point: Internal
00+00
Station Series
100+00
A100-02
04+00
05+00/00+00
Control Point and Station Series form a Geometric Network.
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Hierarchy
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Hierarchy Hierarchy
Line 100
Line 200
Line 200
WTR Pipeline System
Pipeline System LineLoop
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Facility: Pressurized
Introduction History
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Facility: Pressurized Pressurized Features
Valve Branch Closure Meter Reducer Vessel Pipe Segment Pressurized features form a Geometric Network
Introduction History Overview
Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Facility: non-pressurized
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Generic Support
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Geobase
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Operations
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Encroachments
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Integrity
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
Inspection
Introduction History Overview Future
ArcGIS Pipeline Data Model
ESRI
2002 ESRI EGUG Conference
M.J. Harden Associates Inc.
The future …
Develop and complete the standard ArcGIS Pipeline data model ESRI-led consortium of Pipeline Companies and Pipeline Implementation Vendors. Meet several times over the next year to refine the structure of the model and to discuss implementation issues. Target release date of March 2003 – ESRI PUG Meeting