BANK OF BERMUDA LTD. Installation of STS 6000-4 GPM-S In a recent conversation with a staff member of AXI, the Project Manager for the Bank of Bermuda, Peter Richens, told us that he is delighted with the installation and performance of his STS Automated Filtration System. After he had received several fuel tests with failing grades, it was clear that the out-of-spec fuel formed a serious potential liability for the Bank of Bermuda. Mr. Richens, responsible for the reliability of the bank’s Emergency Power Supply (EPS), decided to install an AXI STS 6000-4 GPM-S automated fuel filtration system to rectify the situation. After running the system for two months, additional fuel samples were sent to the testing lab and passed. Their fuel is now “Clear and Bright”, and the Bank of Bermuda now has confidence in the reliability of their stand-by power system.
EQUIPMENT
CONTACT INFO
Three CAT RSM-160CT 500 KVA Gensets 6,000 Gallons of Stored Fuel STS 6000-4 GPM-S
The Bank of Bermuda Limited Member of HSBC Group Peter W. Richens, Project Manager 6 Front Street, Hamilton HM 11 P.O. Box HM 1020 Hamilton HM DX, Bermuda +1 441-299-5851