city of fillmore AWS

Report 0 Downloads 119 Views
CITY OF FILLMORE CENTRAL PARK PLAZA 250 Central Avenue Fillmore, California 93015-1907 (805) 524-3701 ● FAX (805) 524-5707

TO:

Mayor and Council

FROM:

Roxanne Hughes, City Engineer

DATE:

September 12, 2017

RE:

PRESENTATION OF PAVEMENT MANAGEMENT REPORT 2017 AND APPROVAL OF PROJECT LIST FOR RMRA FUND ELIGIBILITY

REQUEST That the City Council receive this presentation of the Pavement Management Report 2017 and approve a recommended project list and associated budget amendments to meet the funding eligibility guidelines for receipt of Road Maintenance and Rehabilitation Account (RMRA) funds. DISCUSSION Pavement Management Report 2017 A Pavement Management System (PMS) is basically a system designed to gather, store, and analyze data about the City’s streets and provide a strategized program for implementing preventive maintenance and rehabilitation projects citywide. The PMS represents a proactive approach to maintaining the existing streets. It benefits the City by preserving investments in the roadways, enhancing pavement performance, ensuring cost-effectiveness, extending pavement life, and providing improved safety and mobility. Additionally, maintaining a fully implemented PMS protects the City’s ability to acquire state and federal funding for street improvement projects. Virtually all funding sources require local agencies to plan and document ongoing maintenance of the funded street improvements. This requirement is met by including these streets in the City’s PMS. The City contracted with the Ventura County Public Works Agency to prepare the Pavement Management Report 2017, which has now been completed. All City maintained streets and bike paths were field surveyed and rating information was recorded in the StreetSaver Program. Pavement Condition Index (PCI) values were calculated for each road and bike path segment across the City network. This information was then used to select rehabilitation and maintenance strategies to apply to each segment. From there, different budget scenarios were applied to identify how different levels of funding impact the network average PCI. The following four budget scenarios were evaluated for a 5-year period: o Budget Needs (Funding required to reach optimum average PCI in the mid 80’s) o Proposed Budget by City ($350K per year based on early RMRA funding projections) o Maintain PCI at current condition o Target PCI of 78

The Pavement Management Report is provided as Exhibit A to this report. The report’s key findings are summarized as follows: •

The City of Fillmore maintains approximately 38.3 centerline miles of roadway, 4.8 miles of bike and pedestrian pathways, and approximately 380,000 square feet of public parking lots.



The current weighted average network PCI for road segments is 68.



The current weighted average network PCI for bike path segments is 86.



The current weighted average network PCI for public parking lots is 79.



As depicted in the chart below, approximately 54% of the road network system is in “good” condition, 13% is in “poor” to “very poor” condition, and the remaining 33% is in “fair” condition.



For the current budget needs (optimum condition targeting PCI in the mid 80’s), the City would require a 5-year budget of approximately $10.4M



With the proposed City budget of $350K/year the average road network PCI is expected to decrease to 64 within the next 5 years



To maintain PCI at current condition would require a 5-year budget of approximately $3.7M



The projected budget to improve the road network average PCI to 78 within the next 5 years is $7.4M Pavement Management Report September 12, 2017 Page 2 of 4

Project List for Road Maintenance and Rehabilitation Account (RMRA) The Governor of California on April 28, 2017 signed Senate Bill 1, the Road Repair and Accountability Act of 2017, also known as the Road Maintenance and Rehabilitation Account (RMRA), to address basic road maintenance, rehabilitation and critical safety needs on highways and local streets, which is funded through a per gallon fuel tax and vehicle registration fees. The City of Fillmore is projected to receive $87,740 in RMRA funds in Fiscal year 2017-2018, which represents a partial funding year. The following fiscal year, the amount is estimated at $263,206. All projects that are eligible for use of Highway User Tax Account (HUTA or Gas Tax) funds are eligible for use of RMRA funds. The Street and Highway Code provides for greater flexibility in use of the RMRA funds if the City has met or exceeds an average pavement condition index of 80 and has general funds allocated to streets and road that are in excess of the average expended in fiscal years 2010, 2011 and 2012 (Maintenance of Effort basis or MOE). Fillmore does not meet the PCI threshold. The MOE for the identified base years of 2010 through 2012 will be zero, as Fillmore did not spend any general fund money on streets and roads during those years. The focus of our projects, therefore, is expected to be deferred roadway rehabilitation and maintenance projects. Prior to receiving an apportionment of RMRA funds from the State Controller in a fiscal year, a city must submit to the California Transportation Commission (CTC) a list of projects proposed to be funded with these funds. All projects proposed to receive funding must be included in the city budget that was adopted by the applicable city council at a regular public meeting. The list of projects must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement. The project list does not limit the flexibility of an eligible city to fund projects in accordance with local needs and priorities so long as the projects are consistent with RMRA priorities. The legislation requires a list of projects to be submitted directly to the CTC by October 16, 2017 for FY17-18. However, if during the year new priorities arise and the city uses the RMRA funding on different projects not on the list, that is acceptable if the projects meet the stated criteria for use of the RMRA funding. It is expected that the CTC will establish a new deadline for submittal of project lists for future fiscal years that will line up better with the local agencies’ budget cycles. Given the small amount of this initial partial year funding, staff recommends that we use the funds to prioritize much needed sidewalk, curb and gutter repairs and also to perform overdue preventative maintenance by applying slurry seal to selected streets with pavement that is in good to fair condition. The projects to be added to the adopted budget for FY17-18 that will be funded with RMRA funds are: • Hardscape repair in the amount of $40,000 for sidewalks, access ramps, curb and gutter projects Citywide. • Slurry seal projects on selected streets up to $47,000

Pavement Management Report September 12, 2017 Page 3 of 4

FISCAL IMPACT For the allocation of funds from RMRA, the Streets line item budget Account Numbers 203-4421-0021245 for Contract Services and allocation of 203-8500-4207-101 for Administrative Services are proposed in the amount of $87,000.

CITY COUNCIL GOAL This meets the City’s goal to replace old infrastructure. RECOMMENDATION That the City Council receive the presentation of the Pavement Management Report 2017 and approve a recommended project list and associated budget amendments to meet the funding eligibility guidelines for receipt of Road Maintenance and Rehabilitation Account (RMRA) funds. ATTACHMENTS A. Pavement Management Report 2017

Pavement Management Report September 12, 2017 Page 4 of 4

Pavement Management Report 2017– City of Fillmore

Prepared for: City of Fillmore, Public Works Department

Prepared by: County of Ventura, Public Works Agency - Transportation Department Advance Planning Section

July 2017

Pavement Management Report 2017– City of Fillmore

Table of Contents ❖

Introduction ........................................................................................................... 1



Pavement Management Program ........................................................................ 1



Road Network Condition Inventory.................................................................... 4



Budget Needs and Scenarios ................................................................................ 5



Recommendations ................................................................................................. 6



Appendix:............................................................................................................... 6 PCI Inventory – Road Segments, Parking Lots, and Bike Paths .................... A PCI Geographical Map ........................................................................................ B List of roads recommended for surface treatments based on City’s proposed budget .................................................................................................................... C Pavement Treatment Decision Tree Criteria .................................................... D

Pavement Management Report 2017– City of Fillmore

❖ Introduction The City of Fillmore maintains approximately 38.3 centerline miles of roadway, 4.8 miles of bike and pedestrian pathways, and approximately 380,000 square feet of public parking lots.

Figure 1. City of Fillmore Vicinity Map

The County of Ventura Public Works Agency Transportation Department was contracted by the City of Fillmore Public Works Department to develop and update their Pavement Management Program (PMP). All road segments, bike and pedestrian pathways, and public parking lots provided by the City of Fillmore have been imported into StreetSaver PMP and were visually inspected using Metropolitan Transportation Commission pavement inspection user guidelines and standards. The visual inspections were performed in order to obtain a pavement condition index (PCI) for each segment. The current weighted average network PCI as of July 2017 for road segments is 68, bike and pedestrian pathways is 86, and for public parking lots is 79. As part of this project, the County also developed a treatment decision tree and evaluated the current budget needs and various budget scenarios that are discussed further in this report.

❖ Pavement Management Program The Pavement Management Program (PMP) is based on field evaluations of pavement conditions utilizing the Metropolitan Transportation Commission (MTC) pavement management protocols and software. These provide a set of tools designed to assist decision-makers in finding costeffective strategies for providing, evaluating, and maintaining pavement in serviceable condition. The program consists of two basic components: 1. A comprehensive web-based database, which contains current and historical information on pavement condition, pavement structure, and traffic data, if available; 2. A set of software tools that allow evaluation of alternatives, determination of existing and future pavement conditions, prediction of financial needs, and the identification and prioritization of pavement renovation projects.

Based on the field inspection data, PCI’s are calculated by the MTC computer model. This establishes a baseline for evaluating the pavement condition of one roadway over another.

1

Pavement Management Report 2017– City of Fillmore The goal of the rating process is to produce index values that represent pavement conditions based on conditions observed in the field using a random sampling method. The condition index values are a function of distress type, distress severity, and distress quantity present in the pavement surface area. The index values have been established to range from zero to 100. Higher index values indicate better pavement conditions. For example, a new pavement with no distress is assigned an index value of 100. Table 1 illustrates the numerical ratings and descriptions of pavement condition corresponding to the numerical ratings. Table 1. Definition of Pavement Condition Categories and Rating System

Category Definition Condition Description Very Good

Rating Index 80-100

Good

55 – 79

Stable, minor cracking, generally hairline and hard to detect. Minor patching and possibly some minor deformation evident. Dry or lightcolored appearance. Very good riding qualities. Rutting less than ½”.

Fair

45 – 54

Generally stable, minor areas of structural weakness evident. Cracking is easier to detect, patched but not excessively. Deformation more pronounced and easily noticed. Ride qualities are good to acceptable.

Poor

25 – 44

Areas of instability, marked evidence of structural deficiency, large crack patterns (alligator cracking), heavy and numerous patches, deformation very noticeable. Riding qualities range from acceptable to poor.

Very Poor

10 – 24

Pavement in extremely deteriorated condition. Numerous areas of instability. Majority of section showing structural deficiency. Ride quality is poor.

Failed

0–9

Pavement structure failed. All of section showing severe structural deficiency.

Stable, no cracking, no patching, and no deformation. Excellent riding qualities.

Monitoring a pavement’s life cycle indicates that the cost of pavement rehabilitation for every one mile of road in “very poor” condition is roughly the same as the cost for renovation/rehabilitation of four miles of road in fair or better condition. Simply stated, it is more cost effective to rehabilitate/repair a road before the rating index drops too far below 50. This fact is illustrated in Figure 2 below.

2

Pavement Management Report 2017– City of Fillmore

Figure 2. Typical Pavement Performance Curve

100 Rejuvenation/ Preservation

PCI

70 Light Rehabilitation, Mill and Fill

50

Heavy Rehabilitation with some Reconstruction

25 Reconstruction AGE (Yrs.)

0 ( demonstrates that the most cost-effective method of extending the surface life of most The curve asphalt pavement surfaces is to concentrate spending on surface treatments and repairing/rehabilitating roads before they deteriorate too much. In general, if one can service the road before the PCI drops below 70, it is more cost effective. Conversely, once the index drops near or below 25, it may be more cost effective to allow the road to continue to deteriorate until funding is available for a complete reconstruction of the road. This may seem a harsh statement or decision to make, particularly to the residents that live on such a street. However, when faced with the responsibility of stretching limited maintenance funds for the greatest public good, it is a necessary decision to use those funds where one can service 4-10 miles of roads, versus only one mile of badly deteriorated roadway. In order to preserve the surface of “good” local roads, and help them remain “good” for a longer period, rejuvenation/preventive maintenance is the most cost-effective method to protect your investment. This method is commonly referred to as “pay me now, or pay me later,” with the philosophy that pavement rejuvenations every Figure 3. Typical Pavement Preservation Curve six to seven years for “good” local roads is much cheaper than complete rehabilitation/reconstruction. Essentially, at approximately a six-to-seven year cycle, local roads that are near a PCI of 70 are recommended to be treated with a rejuvenating seal coating to preserve and protect the pavement surface. Many local agencies have successfully treated local residential streets in this manner for several years. This method is illustrated graphically in Figure 3.

3

Pavement Management Report 2017– City of Fillmore

An economic analysis of this strategy versus traditional road overlay strategy demonstrates that the life-cycle cost of this strategy is clearly favorable – where it can be used effectively as shown below: Alternate A - Seal coating treatment at 7-year cycle/1 overlay 3 seal coat treatments at $0.50 /sf 1 overlay at $2.00 /sf 2 seal coat treatments at $0.50 /sf Totals

21 years 7 years 14 years 42 years

= $1.50 /sf = $2.00 /sf = $1.00 /sf = $4.50 /sf

Alternate B - Remove and replace at 21-year cycle (least cost effective) 2 Reconstruction at $10.00 /SF

42 years

= $20.00 /sf Figure 4. PCI Rating Below 25

❖ Road Network Condition Inventory As you can see in Table 2, 78% of the road network consists of residential/local roads and 22% are arterials and collectors. Approximately 54% of the road network system is in good condition and 13% is in poor to very poor condition. An example of pavement in very poor condition is shown in figure 4.

Table 2. Road Network Condition Summary - July 2017 Arterial

Collector

Residential/Local

Total:

Good (PCI 100-70) Fair (PCI 70-50) Poor (PCI 50-25) Very Poor (PCI 25-0)

4.7% 1.7% 0.1% 0%

7.1% 6.1% 2.6% 0%

41.5% 25.6% 8.6% 1.9%

53.3% 33.4% 11.4% 1.9%

Total:

6.5%

15.8%

77.6%

100%

4

Pavement Management Report 2017– City of Fillmore

❖ Budget Needs and Scenarios StreetSaver is also used for budgeting and future planning as it relates to pavement- management practices. Using the previously described principles and considering existing pavement conditions for the City of Fillmore, various budget scenarios were evaluated to show future projections as related to cost and pavement condition. A PCI cap of 80 was incorporated into the analysis as discussed with City staff, based on current and projected maintenance practices. A PCI cap of 80 sets the maximum baseline for preservation methods into the analysis. The following four budget scenarios were evaluated for a 5-year period: o o o o

Budget Needs (Optimum Condition PCI mid 80’s) Proposed Budget by City Maintain PCI at current condition Target PCI of 78

Based on these scenarios, Tables 3 and 4 summarize the cost analysis for a 5-year period. Table 3. 5-Year Analysis (2018-2022) 2018 $4,307,000

2019 $2,485,000

2020 $1,576,000

2021 $1,462,000

Budget Needs Proposed Budget $350,000 $350,000 $350,000 $350,000 by City Maintain PCI at Current $511,000 $729,000 $796,000 $825,000 Condition PCI 78 Target $1,104,000 $1,613,000 $1,704,000 $1,595,000 Driven *Budget required right now/shortfall to meet the desired treatment needs. Table 4. Summary of Cost for 5-Year Analysis (2018-2022)

Budget Needs Proposed Budget by City Maintain PCI at Current Condition PCI 78 Target Driven

Total five year budget: $10,372,000 $1,750,000 $3,732,000 $7,422,000

5

2022 $542,000 $350,000 $871,000 $1,406,000

Pavement Management Report 2017– City of Fillmore For the current budget needs (optimum condition), the City would require a 5-year budget of approximately $10.4M. This would require $4.3M now (current shortfall) in order to improve the road network PCI to good condition. With the proposed budget by City the average road network PCI is expected to decrease to 64 within the next 5 years. To maintain PCI at current condition would require a 5-year budget of approximately $3.7M. The projected budget to improve the road network average PCI to 78 within the next 5 years is $7.4M and would require $1.1M now and subsequently $1.4 to $1.7M the following four year. The results of the above scenarios as related to the network PCI are shown in Figure 5. Figure 5. PCI Projection Comparison Summary 100

90 83

84

80

PCI

80

70

84

71

73 69

69 68

67

77

75

69

69 66

65

60

84 78 69 64

Proposed Budget of $350K/Yr. Maintain PCI at current condition Improve PCI to 78 w/in 5 Yr's Budget Needs (Optimum Condition)

YEAR

50 2018

2019

2020

2021

2022

❖ Recommendations It is highly recommended that City staff maintain and update the StreetSaver database with any maintenance or rehabilitation (M&R) projects that transpire from this point forward. This would help with future budget projections, determining remaining life cycle of roads, adjustment to pavement curves, and updates to PCI values for roads that are resurfaced. The annual subscription fee needs to be paid to MTC in order to have access to the PMP in StreetSaver. Future pavement inspections for arterial and collector roads is recommended to be re-inspected, at minimum, every 3 years since these roads typically receive higher volumes of traffic. For local residential roads is recommended to be re-inspected, at minimum, every 4 years.

❖ Appendix: A. PCI Inventory – Road Segments, Parking Lots, and Bike Paths B. PCI Geographical Map C. List of roads recommended for surface treatments between 2018-2022 based on the City’s proposed budget D. Pavement Treatment Decision Tree Criteria

6

Pavement Management Report 2017– City of Fillmore

APPENDIX A PCI Inventory – Road Segments, Parking Lots, and Bike Paths

A

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI: Street ID

Section ID

Road Names

Begin Location

End Location

Lanes

Section Length (ft)

Section Width (ft)

69 Current PCI

ROAD SEGMENTS AST10

010

A ST

GOODENOUGH RD (LEVEE DR)

FIFTH ST

2

692

24

74

AST100

100

A ST

SESPE AV

RR X-ING

2

283

40

73

AST110

110

A ST

RR-XING

TELEGRAPH RD

2

116

40

79

AST120

120

A ST

TELEGRAPH RD

SANTA CLARA ST

2

495

40

88

AST130

130

A ST

SANTA CLARA ST

VENTURA ST

2

482

40

82

AST20

020

A ST

FIFTH ST

EDISON LN

2

352

40

70

AST30

030

A ST

EDISON LN

FOURTH ST

2

340

40

74

AST40

040

A ST

FOURTH ST

BLAINE ST

2

345

40

72

AST50

050

A ST

BLAINE ST

THIRD ST

2

346

40

74

AST70

070

A ST

THIRD ST

SECOND ST

2

709

40

90

AST80

080

A ST

SECOND ST

FIRST ST

2

730

40

88

AST90

090

A ST

FIRST ST

SESPE AV

2

679

40

73

AKERS10

010

AKERS ST

FORTH ST

THIRD ST

2

652

40

68

ALLEY10

010

ALLEY 010 (CENTER ST)

D ST

LOS SERENOS DR

2

292

18

69

ALLEY20

020

ALLEY 020

EL PASEO ST

VENTURA ST

2

210

14

6

ALLEY30

030

ALLEY 030

ALLEY 020

C ST

2

522

21

60

ALLEY40

040

ALLEY 040

THIRD ST

LEMON WY

2

765

18

66

ALLEY50

050

ALLEY 050

THIRD ST

FOURTH ST

2

653

15

87

ALLEY60

060

ALLEY 060

ALLEY 050

B ST

2

715

13

60

ALLEY70

070

ALLEY 070

ALLEY 050

B ST

2

716

15

49

ALLEY80

080

ALLEY 080

FOURTH ST

THIRD ST

2

625

19

87

ALLEY90

090

ALLEY 090

FOURTH ST

EDISON LN

2

314

17

67

ALLEY100

100

ALLEY 100

A ST

ALLEY 120

2

485

14

38

ALLEY110

110

ALLEY 110

SANTA CLARA ST

ALLEY 100

2

301

13

41

ALLEY120

120

ALLEY 120

VENTURA ST

ALLEY 130

2

608

13

32

ALLEY130

130

ALLEY 130

A ST

END

2

533

13

73

ALLEY140

140

ALLEY 140

VENTURA ST

SANTA CLARA ST

2

463

14

50

ALLEY150

150

ALLEY 150

MAIN ST

SESPE AV

2

509

32

68

ALLEY160

160

ALLEY 160

SESPE AV

KENSINGTON DR

2

323

16

6

ALLEY170

170

ALLEY 170

ORCHARD ST

ALLEY 160

2

566

16

13

ALLEY180

180

ALLEY 180

MAIN ST

SESPE AV

2

503

21

92

ALLEY190

190

ALLEY 190

SESPE AV

FIRST ST

2

646

18

79

ALLEY200

200

ALLEY 200

SESPE AV

FIRST ST

2

647

20

92

ALLEY210

210

ALLEY 210

SESPE AV

FIRST ST

2

647

21

85

ALLEY220

220

ALLEY 220

SESPE AV

FIRST ST

2

645

19

71

ALLEY230

230

ALLEY 230

MOUNTAIN VIEW ST

COOK DR

2

877

17

78

ALLEY240

240

ALLEY 240

SESPE AV

END

2

380

18

6

ALLEY250

250

ALLEY 250

MARKET ST

END

2

768

20

83

ALLEY260

260

ALLEY 260

SANTA CLARA ST

ALLEY 130

2

300

10

11

ALLEY270

270

ALLEY 270

SANTA CLARA ST

VENTURA ST

2

408

19

12

ALLEY280

280

ALLEY 280

SECOND ST

THIRD ST

2

646

17

58

ALLEY290

290

ALLEY 290

SECOND ST

THIRD ST

2

656

20

74

ALLEY300

300

ALLEY 300

SECOND ST

THIRD ST

2

648

17

86

ALLEY310

310

ALLEY 310

SECOND ST

THIRD ST

2

651

17

83

ALLEY320

320

ALLEY 320

CENTRAL AV

SARATOGA ST

2

679

15

79

ALLEY330

330

ALLEY 330

SARATOGA ST

MOUNTAIN VIEW ST

2

675

16

79

ALLEY340

340

ALLEY 340

MOUNTAIN VIEW ST

ISLAND VIEW ST

2

592

16

46

ALLEY350

350

ALLEY 350

CENTRAL AV

SARATOGA ST

2

676

18

79

Appendix A: 1 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

MOUNTAIN VIEW ST

2

672

15

38

ISLAND VIEW ST

2

586

14

49

END

2

270

14

11

HARTHORN LN

GOODENOUGH RD

2

300

14

85

GOODENOUGH RD

ARRASMITH LN #999

2

336

34

85

ARRASMITH LN #999

END

2

191

34

86

ARRASMITH LN

ARRASMITH LN #999

CUL-DE-SAC

2

120

34

89

010

ASH CI

GOODENOUGH RD

SHADY LN

2

90

34

92

020

ASH CI

SHADY LN

END

2

150

34

83

BST10

010

B ST

END

GOODENOUGH RD

2

648

40

82

BST100

100

B ST

SESPE AV

WILEMAN ST

2

265

40

90

BST110

110

B ST

WILEMAN ST

OLIVER ST

2

270

40

90

BST120

120

B ST

OLIVER ST

SANTA CLARA ST

2

399

40

90

BST130

130

B ST

SANTA CLARA ST

VENTURA ST

2

398

38

87

BST140

140

B ST

VENTURA ST

RIVER ST

2

634

38

57

BST150

150

B ST

RIVER ST

SANTA FE ST

2

219

38

78

BST160

160

B ST

SANTA FE ST

UNION PACIFIC ST

2

234

38

77

BST170

170

B ST

UNION PACIFIC ST

BURLINGTON ST

2

249

38

72

BST20

020

B ST

GOODENOUGH RD

FIFTH ST

2

674

40

84

BST30

030

B ST

FIFTH ST

FOURTH ST

2

673

36

87

BST40

040

B ST

FOURTH ST

BLAINE ST

2

310

36

68

BST50

050

B ST

BLAINE ST

THIRD ST

2

326

36

68

BST60

060

B ST

THIRD ST

SECOND ST

2

673

30

91

BST70

070

B ST

SECOND ST

RR X-ING

2

395

30

91

BST75

075

B ST

RR-XING

TELEGRAPH RD

2

72

30

93

BST80

080

B ST

TELEGRAPH RD

FIRST ST

2

133

40

67

BST90

090

B ST

FIRST ST

SESPE AV

2

660

40

91

BALDEN10

010

BALDEN LN

DEL VALLE DR

CUL-DE-SAC

2

384

40

54

BARDST10

010

BARD ST

FILLMORE ST

STEPHENS ST

2

167

30

53

BARDST20

020

BARD ST

STEPHENS ST

SARATOGA ST

2

325

30

51

BARDST30

030

BARD ST

SARATOGA ST

CLAY ST

2

489

30

55

BLAINA10

010

BLAINE AV

ALLEY 50

B ST

2

715

38

81

BLAINA30

030

BLAINE AV

B ST

A ST

2

1401

34

74

BLAINA40

040

BLAINE AV

CENTRAL AV

SARATOGA ST

2

706

34

74

BLAINA50

050

BLAINE AV

SARATOGA ST

MOUNTAIN VIEW ST

2

704

34

74

BLAINA60

060

BLAINE AV

MOUNTAIN VIEW ST

ISLAND VIEW ST

2

594

34

71

BLUEJY10

010

BLUE JAY ST

CUL-DE-SAC

CONDOR CT

2

176

40

53

BLUEJY20

020

BLUE JAY ST

CONDOR CT

DOVE CT

2

265

40

53

BLUEJY30

030

BLUE JAY ST

DOVE CT

D ST

2

250

40

53

BOULDR10

010

BOULDER ST

THIRD ST

CUL-DE-SAC

2

418

40

77

BRDLWD10

010

BRIDLEWOOD LN

EDGEWOOD WY

RIVER ST

2

253

36

91

BRDLWD20

020

BRIDLEWOOD LN

RIVER ST

SANDLEWOOD LN

2

515

40

72

BRDLWD40

040

BRIDLEWOOD LN

SANDLEWOOD LN

ELKWOOD CT

2

160

34

97

BRDLWD50

050

BRIDLEWOOD LN

ELKWOOD CT

MOUNTAIN VIEW ST

2

477

34

89

BURLTN10

010

BURLINGTON ST

READING ST

RIO GRANDE ST

2

244

34

78

BURLTN20

020

BURLINGTON ST

RIO GRANDE ST

ORIENT ST

2

260

34

78

BURLTN30

030

BURLINGTON ST

ORIENT ST

SOUTHERN PACIFIC ST

2

218

34

78

BURLTN40

040

BURLINGTON ST

SOUTHERN PACIFIC ST

B ST

2

223

34

74

BURLTN50

050

BURLINGTON ST

B ST

SURREY WY

2

781

34

79

BURLTN60

060

BURLINGTON ST

SURREY WY

UNION PACIFIC ST

2

654

34

73

Street ID

Section ID

Road Names

ALLEY360

360

ALLEY 360

ALLEY370

370

ALLEY 370

MOUNTAIN VIEW ST

ALLEY380

380

ALLEY 380

KENSINGTON DR

ARASMTH10

010

ARRASMITH LN

ARASMTH20

020

ARRASMITH LN

ARASMTH30

030

ARRASMITH LN

ARASMTH40

040

ASH10 ASH20

Begin Location SARATOGA ST ROAD SEGMENTS

Appendix A: 2 of 12

Current PCI

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI: Street ID

Section ID

Road Names

Begin Location UNION ROAD PACIFIC ST SEGMENTS

End Location

Lanes

Section Length (ft)

Section Width (ft)

69 Current PCI

BURLTN70

070

BURLINGTON ST

SANTA FE ST

2

254

34

66

BURSON10

010

BURSON LN

SESPE AV

WILEMAN ST

2

187

40

62

BURSON20

020

BURSON LN

OLIVER ST

ORTEGA ST

2

171

40

77

CST10

010

C ST

TELEGRAPH RD

FALCON WY

2

586

40

85

CST110

110

C ST

EL PASEO ST

VENTURA ST

2

284

40

80

CST120

120

C ST

VENTURA ST

RIVER ST

2

634

40

62

CST130

130

C ST

RIVER ST

WWTP GATE

2

534

28

76

CST30

030

C ST

FALCON WY

MEADOWLARK DR

2

263

40

43

CST40

040

C ST

MEADOWLARK DR

FIRST ST

2

547

40

52

CST50

050

C ST

FIRST ST

KING ST

2

223

40

54

CST60

060

C ST

KING ST

SESPE AV

2

441

40

66

CST70

070

C ST

SESPE AV

OLIVER ST

2

440

40

65

CST80

080

C ST

OLIVER ST

ORTEGA ST

2

261

40

65

CST90

090

C ST

ORTEGA ST

EL PASEO ST

2

360

40

67

CANDEL10

010

CANDELARIA LN

END

CARRILLO CT

2

193

34

84

CANDEL20

020

CANDELARIA LN

CARRILLO CT

CATALANO CT

2

243

34

92

CANDEL30

030

CANDELARIA LN

CATALANO CT

GOODENOUGH RD

2

150

34

87

CANYNV10

010

CANYON VIEW

FOURTH ST

CUL-DE-SAC

2

131

40

80

CARRIG10

010

CARRIAGE PL

SURREY WY

SURREY WY

2

168

40

77

CARRIG20

020

CARRIAGE PL

SURREY WY

RIVER ST

2

124

40

71

CARILO10

010

CARRILLO CT

CANDELARIA LN

CUL-DE-SAC

2

99

34

81

CASNER10

010

CASNER WY

MOUNTAIN VIEW ST

MARKET ST

2

271

38

69

CASNER20

020

CASNER WY

MARKET ST

COOK DR

2

643

38

61

CATLANO10

010

CATALANO CT

CANDELARIA LN

CUL-DE-SAC

2

161

34

87

CENTRL10

010

CENTRAL AV

FOOTHILL DR

STONEHEDGE DR

2

674

45

63

CENTRL100

100

CENTRAL AV

MAIN ST

RR X-ING

2

154

54

76

CENTRL110

110

CENTRAL AV

RR-XING

SANTA CLARA ST

2

170

52

60

CENTRL120

120

CENTRAL AV

SANTA CLARA ST

VENTURA ST

2

478

54

57

CENTRL130

130

CENTRAL AV

VENTURA ST

RIVER ST

2

636

48

81

CENTRL20

020

CENTRAL AV

STONEHEDGE DR

FOURTH ST

2

246

45

65

CENTRL30

030

CENTRAL AV

FOURTH ST

BLAINE ST

2

326

45

70

CENTRL40

040

CENTRAL AV

BLAINE ST

THIRD ST

2

367

45

62

CENTRL50

050

CENTRAL AV

THIRD ST

SECOND ST

2

692

45

87

CENTRL60

060

CENTRAL AV

SECOND ST

FIRST ST

2

693

48

95

CENTRL70

070

CENTRAL AV

FIRST ST

KENSINGTON DR

2

330

54

95

CENTRL80

080

CENTRAL AV

KENSINGTON DR

SESPE AV

2

370

54

82

CENTRL90

090

CENTRAL AV

SESPE ST

MAIN ST

2

566

54

75

CHAPRL10

010

CHAPARRAL ST

THIRD ST

MANZANITA DR

2

411

38

70

CHAPRL20

020

CHAPARRAL ST

MANZANITA DR

SECOND ST

2

241

38

69

CLAYST10

010

CLAY ST

THIRD ST

SECOND ST

2

656

38

86

CLAYST20

020

CLAY ST

SECOND ST

BARD ST

2

365

38

71

CLAYST30

030

CLAY ST

FIRST ST

SESPE AV

2

657

36

51

CLAYST40

040

CLAY ST

SESPE AV

MAIN ST

2

525

34

53

CLAYST50

050

CLAY ST

SANTA CLARA ST

VENTURA ST

2

450

44

71

CONDOR10

010

CONDOR CT

BLUE JAY ST

CUL-DE-SAC

2

238

40

57

COOKDR10

010

COOK DR

MARKET ST

CASNER WY

2

883

40

60

COOKDR20

020

COOK DR

CASNER WY

SESPE AV

2

285

40

62

COTTNW10

010

COTTONWOOD LN

LEVEE DR

WATERFORD LN

2

134

40

34

COTTNW20

020

COTTONWOOD LN

WATERFORD LN

PARKHAVEN CT

2

401

40

53

COTTNW30

030

COTTONWOOD LN

PARKHAVEN CT

WATERFORD LN

2

626

40

38

Appendix A: 3 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

END

2

366

20

47

BLUE JAY ST

2

598

40

46

CENTER ST

2

144

40

51

CENTER ST

WATERFORD LN

2

339

40

21

WATERFORD LN

VENTURA ST

2

292

40

32

VENTURA ST

RIVER ST

2

616

20

58

RIVER ST

134' S/O RIVER ST

2

115

20

70

DEERFIELD DR

RIVER ST

ELMHURST LN

2

158

54

73

DEL VALLE DR

SANTA CLARA ST

BALDEN LN

2

366

40

68

020

DEL VALLE DR

BALDEN LN

TELEGRAPH RD

2

677

40

53

DOVECT10

010

DOVE CT

BLUE JAY ST

CUL-DE-SAC

2

115

40

50

Street ID

Section ID

Road Names

COUNTR10

010

COUNTRY CT

DST10

010

D ST

SESPE ST

DST20

020

D ST

BLUE JAY ST

DST30

030

D ST

DST40

040

D ST

DST50

050

D ST

DST60

060

D ST

DEERFL10

010

DELVAL10

010

DELVAL20

Begin Location A ST SEGMENTS ROAD

Current PCI

EST10

010

E ST

VENTURA ST

RIVER ST

2

633

40

84

EAGLE10

010

EAGLE CT

FALCON WY

CUL-DE-SAC

2

188

40

64

EAGLE20

020

EAGLE CT

FALCON WY

FALCON WY

2

212

40

62

EDISNL10

010

EDISON LN

EDISON WY

A ST

2

1255

28

81

EDISNW10

010

EDISON WY

FIFTH ST

EDISON LN

2

327

16

72

EDISNW20

020

EDISON WY

EDISON LN

FOURTH ST

2

325

16

75

ELPASE10

010

EL PASEO ST

LOS SERENOS DR

MCNAB CT

2

269

38

78

ELPASE20

020

EL PASEO ST

MCNAB CT

RHODES CT

2

282

38

79

ELPASE30

030

EL PASEO ST

RHODES CT

SIERRA VISTA AV

2

286

38

78

ELPASE40

040

EL PASEO ST

SIERRA VISTA AV

C ST

2

272

38

86

ELPASE50

050

EL PASEO ST

C ST

VILLAGE SQ

2

202

40

85

ELKINS10

010

ELKINS LN

SECOND ST

CUL-DE-SAC

2

375

38

69

ELKWD10

010

ELKWOOD LN

BRIDLEWOOD LN

CUL-DE-SAC

2

497

34

89

ELMHRS10

010

ELMHURST LN

CUL-DE-SAC

DEERFIELD ST

2

252

38

62

ELMHRS20

020

ELMHURST LN

DEERFIELD ST

CUL-DE-SAC

2

197

38

70

ERSKIN10

010

ERSKINE LN

PRICE ST

CUL-DE-SAC

2

313

40

61

FALCON10

010

FALCON CT

C ST

EAGLE CT

2

130

40

60

FALCON20

020

FALCON CT

EAGLE CT

EAGLE CT

2

296

40

60

FERNGL10

010

FERNGLEN CI

THIRD ST

THIRD ST

2

685

36

54

FIFTH10

010

FIFTH ST

HINCKLEY LN

GOODENOUGH RD

2

148

32

87

FIFTH20

020

FIFTH ST

GOODENOUGH RD

TAYLOR LN

2

348

36

85

FIFTH30

030

FIFTH ST

TAYLOR LN

B ST

2

183

36

85

FIFTH40

040

FIFTH ST

B ST

EDISON WY

2

144

36

53

FIFTH50

050

FIFTH ST

EDISON WY

A ST

2

1257

36

56

FILLMR10

010

FILLMORE ST

THIRD ST

SECOND ST

2

654

36

67

FILLMR20

020

FILLMORE ST

SECOND ST

BARD ST

2

368

26

52

FILLMR30

030

FILLMORE ST

FIRST ST

SESPE AV

2

657

36

60

FILLMR40

040

FILLMORE ST

SESPE AV

MAIN ST

2

521

36

53

FILLMR50

050

FILLMORE ST

SANTA CLARA ST

VENTURA ST

2

460

36

33

FINCH10

010

FINCH CT

MEADOWLARK DR

CUL-DE-SAC

2

203

40

53

FINEST10

010

FINE ST

FOURTH ST

CUL-DE-SAC

2

533

40

69

FINEST20

020

FINE ST

FOURTH ST

LOCKHART LN

2

142

40

71

FINEST30

030

FINE ST

LOCKHART LN

THIRD ST

2

529

40

71

FIRST10

010

FIRST ST

MOCKINGBIRD LANE

C ST

2

444

40

53

FIRST100

100

FIRST ST

A ST

ORCHARD ST

2

657

36

39

FIRST110

110

FIRST ST

ORCHARD ST

CENTRAL AV

2

748

36

48

FIRST120

120

FIRST ST

CENTRAL AV

FILLMORE ST

2

345

36

58

FIRST130

130

FIRST ST

FILLMORE ST

SARATOGA ST

2

354

36

51

FIRST140

140

FIRST ST

SARATOGA ST

CLAY ST

2

365

36

51

Appendix A: 4 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

MOUNTAIN VIEW ST

2

340

36

53

KING ST

2

581

40

75

KING ST

PRICE ST

2

236

40

76

FIRST ST

PRICE ST

MEADOWLARK DR

2

291

40

76

FIRST ST

MEADOWLARK DR

B ST

2

314

40

72

070

FIRST ST

B ST

TELEGRAPH RD

2

191

40

68

FIRST90

090

FIRST ST

END

A ST

2

346

46

59

FOOTHL10

010

FOOTHILL DR

CENTRAL AV

FOOTHILL DR

2

233

46

76

FOOTHL20

020

FOOTHILL DR

FOOTHILL DR

MORRIS DR

2

364

30

90

FOOTHL30

030

FOOTHILL DR

MORRIS DR

TEITSORT DR

2

142

30

88

FOOTHL40

040

FOOTHILL DR

TEITSORT DR

FREMLIN DR

2

512

30

74

Street ID

Section ID

Road Names

FIRST150

150

FIRST ST

FIRST20

020

FIRST ST

C ST

FIRST40

040

FIRST ST

FIRST50

050

FIRST60

060

FIRST70

Begin Location CLAY ST SEGMENTS ROAD

Current PCI

FOOTHL50

050

FOOTHILL DR

FREMLIN DR

FOOTHILL DR

2

1597

30

71

FOURTH100

100

FOURTH ST

VALLEY VISTA

MESA DR

2

299

40

74

FOURTH110

110

FOURTH ST

MESA DR

SARATOGA ST

2

149

40

71

FOURTH120

120

FOURTH ST

SARATOGA ST

CANYON VIEW ST

2

123

40

76

FOURTH130

130

FOURTH ST

CANYON VIEW ST

MOUNTAIN VIEW ST

2

585

40

74

FOURTH140

140

FOURTH ST

MOUNTAIN VIEW ST

ISLAND VIEW ST

2

643

36

78

FOURTH150

150

FOURTH ST

ISLAND VIEW ST

MAIL BOX #149

2

450

24

86

FOURTH160

160

FOURTH ST

MAIL BOX #149

END

2

987

16

77

FOURTH20

020

FOURTH ST

GOODENOUGH RD

B ST

2

718

36

78

FOURTH30

030

FOURTH ST

B ST

EDISON WY

2

162

38

79

FOURTH40

040

FOURTH ST

EDISON WY

A ST

2

1257

38

76

FOURTH50

050

FOURTH ST

A ST

AKERS ST

2

241

38

37

FOURTH60

060

FOURTH ST

AKERS ST

FINE ST

2

190

38

34

FOURTH70

070

FOURTH ST

GALVIN LN

TIGHE LN

2

250

40

80

FOURTH80

080

FOURTH ST

TIGHE LN

CENTRAL AV

2

229

40

80

FOURTH90

090

FOURTH ST

CENTRAL AV

VALLEY VISTA

2

259

40

73

FREMLN10

010

FREMLIN DR

FOOTHILL DR

POLE #7999151

2

143

18

27

GALVIN10

010

GALVIN LN

FOURTH ST

CUL-DE-SAC

2

240

40

91

GLENWY10

010

GLEN WY

SANTA CLARA ST

ORTEGA ST

2

269

40

53

GLENWY20

020

GLEN WY

ORTEGA ST

OLIVER ST

2

248

40

58

GLENWY30

030

GLEN WY

OLIVER ST

WILEMAN ST

2

179

40

64

GLENWY40

040

GLEN WY

WILEMAN ST

SESPE AV

2

232

40

61

GDENUF10

010

GOODENOUGH RD

CITY LIMIT

ASH CI

2

1150

24

50

GDENUF100

100

GOODENOUGH RD

THIRD ST

RR-XING

2

247

44

82

GDENUF110

110

GOODENOUGH RD

RR-XING

TELEGRAPH RD

2

58

44

85

GDENUF20

020

GOODENOUGH RD

ASH CI

A ST

2

1043

34

72

GDENUF30

030

GOODENOUGH RD

A ST

B ST

2

1440

34

74

GDENUF40

040

GOODENOUGH RD

B ST

CANDELARIA LN

2

215

26

73

GDENUF50

050

GOODENOUGH RD

CANDELARIA LN

HINCKLEY LN

2

193

26

74

GDENUF60

060

GOODENOUGH RD

HINCKLEY LN

FIFTH ST

2

521

26

76

GDENUF70

070

GOODENOUGH RD

FIFTH ST

FOURTH ST

2

859

26

83

GDENUF80

080

GOODENOUGH RD

FOURTH ST

ARRASMITH LN

2

178

26

83

GDENUF90

090

GOODENOUGH RD

ARRASMITH LN

THIRD ST

2

276

26

79

HARTHN10

010

HARTHORN LN

GOODENOUGH RD

ARRASMITH LN

2

559

34

87

HINCKLY10

010

HINCKLEY LN

GOODENOUGH RD

HINCKLEY LN #808

2

301

34

85

HINCKLY20

020

HINCKLEY LN

HINCKLEY LN #805

END

2

93

34

87

HINCKLY30

030

HINCKLEY LN

HINCKLEY LN#808

FIFTH ST

2

634

34

86

HINCKLY40

040

HINCKLEY LN

FIFTH ST

GOODENOUGH RD

2

621

34

87

HOWARD10

010

HOWARD ST

KING ST

CUL-DE-SAC

2

430

40

89

Appendix A: 5 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI: Street ID

Section ID

HUMEDR10

010

HUME DR

ISLDVW10

010

ISLAND VIEW ST

FOURTH ST

ISLDVW20

020

ISLAND VIEW ST

BLAINE ST

Road Names

Begin Location TELEGRAPH RD ROAD SEGMENTS

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

TELEGRAPH RD

2

616

40

44

BLAINE ST

2

308

38

90

THIRD ST

2

372

38

86

Current PCI

ISLDVW30

030

ISLAND VIEW ST

THIRD ST

SECOND ST

2

673

38

72

KENSTN10

010

KENSINGTON DR

ORCHARD ST

CENTRAL AV

2

729

36

29

KINGST10

010

KING ST

CUL-DE-SAC

C ST

2

180

40

53

KINGST20

020

KING ST

C ST

HOWARD ST

2

280

40

74

KINGST30

030

KING ST

HOWARD ST

FIRST ST

2

511

40

80

LEMON10

010

LEMON WY

SECOND ST

THIRD ST

2

648

40

75

LEVEE10

010

LEVEE DR

VENTURA ST

COTTONWOOD LN

2

142

24

21

LEVEE20

020

LEVEE DR

COTTONWOOD LN

END

2

45

24

45

LEWIS10

010

LEWIS LN

PRICE ST

CUL-DE-SAC

2

313

38

59

LOCKHT10

010

LOCKHART LN

FINE ST

CUL-DE-SAC

2

100

38

72

LORALN10

010

LORA LN

MARKET ST

CUL-DE-SAC

2

611

40

76

LOSSER10

010

LOS SERENOS DR

VENTURA ST

EL PASEO ST

2

287

36

39

LOSSER20

020

LOS SERENOS DR

EL PASEO ST

CENTER ST

2

342

36

26

LOSSER30

030

LOS SERENOS DR

CENTER ST

450' N/O CENTER ST

2

451

36

35

LOSSER40

040

LOS SERENOS DR

450' N/O CENTER ST

SIERRA VISTA AV

2

838

36

33

MAINST10

010

MAIN ST

END

CENTRAL AV

2

314

32

65

MAINST20

020

MAIN ST

CENTRAL AV

FILLMORE ST

2

343

38

68

MAINST30

030

MAIN ST

FILLMORE ST

SARATOGA ST

2

360

38

60

MAINST40

040

MAIN ST

SARATOGA ST

CLAY ST

2

360

38

72

MAINST50

050

MAIN ST

CLAY ST

MOUNTAIN VIEW ST

2

340

38

76

MAINST60

060

MAIN ST

MOUNTAIN VIEW ST

MARKET ST

2

340

38

92

MAINST70

070

MAIN ST

MARKET ST

350' E/O MARKET ST

2

350

38

92

MAINST80

080

MAIN ST

350' E/O MARKET ST

END

2

514

38

75

MALLRD10

010

MALLARD ST

QUAIL CT

CUL-DE-SAC

2

134

40

44

MALLRD20

020

MALLARD ST

SESPE AV

QUAIL CT

2

280

40

40

MANZNT10

010

MANZANITA DR

CHAPARRAL ST

THIRD ST

2

621

40

69

MAPLE10

010

MAPLE CT

SHADY LN

END

2

233

30

78

MARKET10

010

MARKET ST

COOK DR

CASNER WY

2

249

40

64

MARKET20

020

MARKET ST

CASNER WY

SESPE AV

2

276

40

63

MARKET30

030

MARKET ST

SESPE AV

LORA LN

2

270

40

63

MARKET40

040

MARKET ST

LORA LN

MAIN ST

2

113

40

70

MCNAB10

010

MC NAB CT

EL PASEO ST

CUL-DE-SAC

2

516

40

47

MCAMBL10

010

MCCAMPBELL ST

SESPE AVE

WILEMAN ST

2

265

38

78

MCAMBL20

020

MCCAMPBELL ST

WILEMAN ST

OLIVER ST

2

403

38

76

MCAMBL30

030

MCCAMPBELL ST

OLIVER ST

SANTA CLARA ST

2

251

40

80

MEADWL10

010

MEADOWLARK DR

MOCKINGBIRD LANE

FINCH CT

2

319

40

49

MEADWL100

100

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #4

2

15

40

44

MEADWL110

110

MEADOWLARK DR

CUL-DE-SAC #4

CUL-DE-SAC #5

2

193

40

53

MEADWL120

120

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #5

2

61

40

53

MEADWL130

130

MEADOWLARK DR

CUL-DE-SAC #5

CUL-DE-SAC #6

2

80

40

53

MEADWL140

140

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #6

2

122

40

62

MEADWL150

150

MEADOWLARK DR

CUL-DE-SAC #6

CUL-DE-SAC #7

2

132

40

53

MEADWL160

160

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #7

2

64

40

53

MEADWL170

170

MEADOWLARK DR

CUL-DE-SAC #7

CUL-DE-SAC #8

2

109

40

53

MEADWL180

180

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #8

2

91

40

64

MEADWL190

190

MEADOWLARK DR

CUL-DE-SAC #8

CUL-DE-SAC #9

2

117

40

53

MEADWL20

020

MEADOWLARK DR

FINCH CT

C ST

2

156

40

49

Appendix A: 6 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI: Street ID

Section ID

Road Names

MEADWL200

200

MEADOWLARK DR

MEADWL210

210

MEADOWLARK DR

CUL-DE-SAC #9

MEADWL220

220

MEADOWLARK DR

CUL-DE-SAC #10

MEADWL30

030

MEADOWLARK DR

MEADWL40

040

MEADOWLARK DR

MEADWL50

050

MEADOWLARK DR

MEADWL60

060

MEADOWLARK DR

MEADWL70

070

MEADWL80

080

MEADWL90

Begin Location

69

Section Length (ft)

Section Width (ft)

Current PCI

End Location

Lanes

CUL-DE-SAC #9

2

51

40

53

CUL-DE-SAC #10

2

152

40

53

FIRST ST

2

123

40

80

C ST

CUL-DE-SAC #1

2

110

40

53

MEADOWLARK DR

CUL-DE-SAC #1

2

76

40

53

CUL-DE-SAC #1

CUL-DE-SAC #2

2

223

40

53

MEADOWLARK DR

CUL-DE-SAC #2

2

75

40

53

MEADOWLARK DR

CUL-DE-SAC #2

CUL-DE-SAC #3

2

229

40

53

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #3

2

75

40

53

090

MEADOWLARK DR

CUL-DE-SAC #3

CUL-DE-SAC #4

2

107

40

53

MESADR10

010

MESA DR

FOURTH ST

CUL-DE-SAC

2

223

40

82

MOCKBR10

010

MOCKINGBIRD LN

MEADOW LARK DR

CUL-DE-SAC TO NORTH

2

212

40

53

MOCKBR20

020

MOCKINGBIRD LN

ORIOLE CI

MEADOW LARK DR

2

328

40

54

MOCKBR30

030

MOCKINGBIRD LN

FIRST ST

ORIOLE CI

2

234

40

53

MOCKBR40

040

MOCKINGBIRD LN

FIRST ST

SIERRA VISTA AV

2

696

40

54

MOCKBR50

050

MOCKINGBIRD LN

SIERRA VISTA AV

CUL-DE-SAC TO SOUTH

2

112

40

53

MTVIEW10

010

MOUNTAIN VIEW ST

ARUNDELL CI

FOURTH ST

2

199

28

79

MTVIEW100

100

MOUNTAIN VIEW ST

RR-XING

SANTA CLARA ST

2

149

36

51

MTVIEW110

110

MOUNTAIN VIEW ST

SANTA CLARA ST

VENTURA ST

2

389

40

61

MTVIEW120

120

MOUNTAIN VIEW ST

VENTURA ST

BRIDGE

2

76

56

92

MTVIEW130

130

MOUNTAIN VIEW ST

BRIDGE

CHERRYWOOD ST

2

262

40

91

MTVIEW140

140

MOUNTAIN VIEW ST

CHERRYWOODST

RIVER ST

2

262

40

88

MTVIEW150

150

MOUNTAIN VIEW ST

RIVER ST

EDGEWOOD WY

2

274

40

91

MTVIEW20

020

MOUNTAIN VIEW ST

FOURTH ST

BLAINE ST

2

326

36

60

MTVIEW30

030

MOUNTAIN VIEW ST

BLAINE ST

THIRD ST

2

366

36

60

MTVIEW40

040

MOUNTAIN VIEW ST

THIRD ST

SECOND ST

2

693

38

53

MTVIEW50

050

MOUNTAIN VIEW ST

SECOND ST

FIRST ST

2

693

38

88

MTVIEW60

060

MOUNTAIN VIEW ST

FIRST ST

CASNER WY

2

399

38

82

MTVIEW70

070

MOUNTAIN VIEW ST

CASNER WY

SESPE AV

2

301

40

50

MTVIEW80

080

MOUNTAIN VIEW ST

SESPE AV

MAIN ST

2

565

40

60

MTVIEW90

090

MOUNTAIN VIEW ST

MAIN

RR-XING

2

138

38

62

MUTAU10

010

MUTAU CIR

SANTA CLARA ST

CUL-DE-SAC

2

120

40

90

OAKDAL10

010

OAKDALE LN

RIVER ST

CUL-DE-SAC

2

331

40

67

OTELE10

010

OLD TELEGRAPH RD

CITY LIMIT

GOODENOUGH RD

2

437

34

69

OTELE20

020

OLD TELEGRAPH RD

GOODENOUGH RD

B ST

2

1837

38

74

OTELE30

030

OLD TELEGRAPH RD

B ST

FIRST ST

2

279

38

72

OTELE40

040

OLD TELEGRAPH RD

FIRST ST

HUME ST-W

2

179

38

73

OTELE50

050

OLD TELEGRAPH RD

HUME ST-W

HUME ST-E

2

326

38

70

OTELE60

060

OLD TELEGRAPH RD

HUME ST-E

SESPE PLACE

2

189

38

78

OTELE70

070

OLD TELEGRAPH RD

SESPE PLACE

SESPE AV

2

355

38

82

OTELE80

080

OLD TELEGRAPH RD

SESPE AV

DEL VALLE DR

2

262

38

79

OTELE90

090

OLD TELEGRAPH RD

DEL VALLE DR

A ST

2

302

38

80

OLIVES10

010

OLIVE ST

VENTURA ST

SANTA CLARA ST

2

460

28

52

OLIVER10

010

OLIVER ST

C ST

WILEMAN ST

2

205

40

63

OLIVER20

020

OLIVER ST

WILEMAN ST

BURSON LN

2

428

40

61

OLIVER30

030

OLIVER ST

BURSON LN

GLEN WY-W

2

324

40

56

OLIVER40

040

OLIVER ST

GLEN WY-W

GLEN WY

2

150

40

61

OLIVER50

050

OLIVER ST

B ST

MCCAMPBELL ST

2

452

40

53

ORANGR10

010

ORANGE GROVE AV

SANTA CLARA ST

END

2

266

30

82

ORANGR20

020

ORANGE GROVE AV

VENTURA ST

SANTA CLARA ST

2

460

30

19

MEADOWLARK DR ROAD SEGMENTS

Appendix A: 7 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

KENSINGTON DR

2

173

34

73

SESPE AV

2

302

32

71

SANTA FE ST

BURLINGTON ST

2

494

34

78

Street ID

Section ID

Road Names

ORCHRD10

010

ORCHARD ST

ORCHRD20

020

ORCHARD ST

KENSINGTON DR

ORIENT10

010

ORIENT ST

Begin Location FIRST STSEGMENTS ROAD

Current PCI

ORIOLE10

010

ORIOLE CIR

MOCKINGBIRD LANE

CUL-DE-SAC

2

408

40

51

ORTEGA10

010

ORTEGA ST

C ST

BURSON LN

2

626

40

66

ORTEGA20

020

ORTEGA ST

BURSON LN

GLEN WY

2

491

40

68

PALMST10

010

PALM ST

VENTURA ST

SANTA CLARA ST

2

463

36

53

PARKHV10

010

PARKHAVEN CT

COTTONWOOD LN

CUL-DE-SAC

2

84

40

21

PRICE10

010

PRICE ST

FIRST ST

LEWIS LN

2

227

40

53

PRICE20

020

PRICE ST

LEWIS LN

ERSKINE LN

2

210

40

53

PRICE30

030

PRICE ST

ERSKINE LN

SESPE AV

2

223

40

53

QUAIL10

010

QUAIL CT

MALLARD ST

CUL-DE-SAC

2

483

40

38

READING10

010

READING ST

RIVER ST

SANTA FE ST

2

218

34

78

READING20

020

READING ST

SANTA FE ST

BURLINGTON ST

2

445

34

78

RHODES10

010

RHODES CT

EL PASEO ST

CUL-DE-SAC

2

516

36

31

RIOGND10

010

RIO GRANDE ST

SANTA FE ST

BURLINGTON ST

2

477

34

78

RIVERC10

010

RIVER CT

RIVER ST

CUL-DE-SAC

2

76

40

77

RIVERS10

010

RIVER ST

CUL-DE-SAC

E ST

2

905

38

85

RIVERS100

100

RIVER ST

ORANGE BLOSSOM LN

DUNTON LN

2

239

36

73

RIVERS110

110

RIVER ST

DUNTON LN

SURREY WY

2

207

36

74

RIVERS120

120

RIVER ST

SURREY WY

CARRIAGE PL

2

223

36

72

RIVERS130

130

RIVER ST

CARRIAGE PL

A ST

2

384

36

72

RIVERS140

140

RIVER ST

A ST

720' E/O A ST

2

684

40

69

RIVERS150

150

RIVER ST

720' E/O A ST

WILLOW ST

2

350

40

71

RIVERS160

160

RIVER ST

WILLOW ST

CENTRAL AV

2

347

40

69

RIVERS170

170

RIVER ST

CENTRAL AV

RIVER CT

2

232

40

76

RIVERS180

180

RIVER ST

RIVER CT

BRIDLEWOOD LN

2

251

40

79

RIVERS190

190

RIVER ST

BRIDLEWOOD LN

SANDLEWOOD LN

2

254

40

77

RIVERS20

020

RIVER ST

E ST

D ST

2

1441

30

82

RIVERS200

200

RIVER ST

SANDLEWOOD LN

WILDWOOD LN

2

212

40

92

RIVERS210

210

RIVER ST

WILDWOOD LN

MOUNTAIN VIEW ST

2

472

40

92

RIVERS220

220

RIVER ST

MOUNTAIN VIEW ST

END

2

562

32

92

RIVERS30

030

RIVER ST

D ST

355' E/O D ST

2

355

26

71

RIVERS40

040

RIVER ST

355' E/O D ST

C ST

2

1398

52

78

RIVERS50

050

RIVER ST

C ST

READING ST

2

517

30

67

RIVERS60

060

RIVER ST

READING ST

DEERFIELD ST

2

198

36

72

RIVERS70

070

RIVER ST

DEERFIELD ST

OAKDALE ST

2

427

36

72

RIVERS80

080

RIVER ST

OAKDALE ST

B ST

2

296

36

72

RIVERS90

090

RIVER ST

B ST

ORANGE BLOSSOM LN

2

356

36

72

ROBIN10

010

ROBIN CT

SESPE AV

CUL-DE-SAC

2

219

40

57

SNDLWD10

010

SANDLEWOOD LN

BRIDLEWOOD LN

RIVER ST

2

248

32

78

SANTCL10

010

SANTA CLARA ST

CUL-DE-SAC

GLEN WY

2

333

40

69

SANTCL100

100

SANTA CLARA ST

OLIVE ST

PALM ST

2

364

36

66

SANTCL110

110

SANTA CLARA ST

PALM ST

CENTRAL AV

2

337

36

55

SANTCL120

120

SANTA CLARA ST

CENTRAL AV

FILLMORE ST

2

342

50

75

SANTCL130

130

SANTA CLARA ST

FILLMORE ST

SARATOGA ST

2

360

36

60

SANTCL140

140

SANTA CLARA ST

SARATOGA ST

CLAY ST

2

360

36

57

SANTCL150

150

SANTA CLARA ST

CLAY ST

MOUNTAIN VIEW ST

2

340

36

57

SANTCL160

160

SANTA CLARA ST

MOUNTAIN VIEW ST

END

2

1455

30

27

SANTCL20

020

SANTA CLARA ST

GLEN WY

135' W/O B ST

2

116

40

72

Appendix A: 8 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

B ST

2

116

40

62

MUTAU CT

2

209

40

88

MCCAMPBELL ST

2

278

40

92

MCCAMPBELL ST

DEL VALLE DR

2

258

40

87

DEL VALLE DR

A ST

2

663

40

88

SANTA CLARA ST

A ST

ORANGE GROVE AV

2

338

38

68

090

SANTA CLARA ST

ORANGE GROVE AV

OLIVE ST

2

360

36

74

SANTFE10

010

SANTA FE ST

READING ST

RIO GRANDE ST

2

223

32

78

SANTFE20

020

SANTA FE ST

RIO GRANDE ST

ORIENT ST

2

242

32

86

SANTFE30

030

SANTA FE ST

ORIENT ST

SOUTHERN PACIFIC ST

2

229

32

86

SANTFE40

040

SANTA FE ST

SOUTHERN PACIFIC ST

B ST

2

199

32

85

SANTFE50

050

SANTA FE ST

B ST

SURREY WY

2

752

32

85

SANTFE60

060

SANTA FE ST

SURREY WY

BURLINGTON ST

2

465

32

79

SARATG10

010

SARATOGA ST

FOURTH ST

BLAINE ST

2

290

36

76

SARATG20

020

SARATOGA ST

BLAINE ST

THIRD ST

2

330

36

73

SARATG30

030

SARATOGA ST

THIRD ST

SECOND ST

2

655

36

81

SARATG40

040

SARATOGA ST

SECOND ST

BARD ST

2

380

34

60

SARATG50

050

SARATOGA ST

BARD ST

FIRST ST

2

275

34

67

SARATG60

060

SARATOGA ST

FIRST ST

SESPE AV

2

656

34

66

SARATG70

070

SARATOGA ST

SESPE AV

MAIN ST

2

521

34

58

Street ID

Section ID

Road Names

SANTCL30

030

SANTA CLARA ST

SANTCL40

040

SANTA CLARA ST

B ST

SANTCL50

050

SANTA CLARA ST

MUTAU CT

SANTCL60

060

SANTA CLARA ST

SANTCL70

070

SANTA CLARA ST

SANTCL80

080

SANTCL90

Begin Location 135' W/O B ST ROAD SEGMENTS

Current PCI

SARATG80

080

SARATOGA ST

SANTA CLARA ST

VENTURA ST

2

461

40

21

SECOND10

010

SECOND ST

LEMON WAY

B ST

2

286

30

29

SECOND100

100

SECOND ST

SARATOGA ST

CLAY ST-N

2

360

40

82

SECOND110

110

SECOND ST

CLAY ST-N

CLAY ST-S

2

124

40

78

SECOND120

120

SECOND ST

CLAY ST-S

MOUNTAIN VIEW ST

2

218

40

77

SECOND130

130

SECOND ST

MOUNTAIN VIEW ST

ELKINS LN

2

297

40

70

SECOND140

140

SECOND ST

ELKINS LN

ISLAND VIEW ST

2

315

40

77

SECOND150

150

SECOND ST

ISLAND VIEW ST

END

2

208

40

70

SECOND20

020

SECOND ST

145' W/O CHAPARRAL ST

CHAPARRAL ST

2

145

36

73

SECOND30

030

SECOND ST

CHAPARRAL ST

YUCCA DR

2

527

36

70

SECOND40

040

SECOND ST

YUCCA DR

CUL-DE-SAC

2

239

36

75

SECOND50

050

SECOND ST

STADIUM WY

SHIELLS DR

2

1081

34

87

SECOND60

060

SECOND ST

SHIELLS DR

CENTRAL AV

2

346

36

76

SECOND70

070

SECOND ST

CENTRAL AV

FILLMORE ST-S

2

213

40

76

SECOND80

080

SECOND ST

FILLMORE ST-S

FILLMORE-N

2

133

40

71

SECOND90

090

SECOND ST

FILLMORE-N

SARATOGA ST

2

360

40

79

SESPE10

010

SESPE AV

D ST

ROBIN CT

2

182

40

39

SESPE100

100

SESPE AV

B ST

MCCAMPBELL ST

2

466

38

64

SESPE110

110

SESPE AV

MCCAMPBELL ST

TELEGRAPH RD

2

463

38

63

SESPE130

130

SESPE AV

A ST

ORCHARD ST

2

658

54

39

SESPE140

140

SESPE AV

ORCHARD ST

CENTRAL AV

2

533

54

41

SESPE150

150

SESPE AV

CENTRAL AV

FILLMORE ST

2

330

52

53

SESPE160

160

SESPE AV

FILLMORE ST

SARATOGA ST

2

360

52

64

SESPE170

170

SESPE AV

SARATOGA ST

CLAY ST

2

360

52

69

SESPE180

180

SESPE AV

CLAY ST

MOUNTAIN VIEW ST

2

340

52

60

SESPE190

190

SESPE AV

MOUNTAIN VIEW ST

MARKET ST

2

345

40

68

SESPE20

020

SESPE AV

ROBIN CT

MALLARD ST

2

251

40

40

SESPE200

200

SESPE AV

MARKET ST

COOK DR

2

635

40

67

SESPE210

210

SESPE AV

COOK DR

END

2

153

40

70

SESPE30

030

SESPE AV

MALLARD ST

SIERRA VISTA AV

2

693

40

48

Appendix A: 9 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

C ST

2

273

40

52

BURSON LN

2

361

38

78

PRICE ST

2

455

38

81

PRICE ST

GLEN WY

2

119

38

83

GLEN WY

B ST

2

466

38

92

TELEGRAPH RD

A ST

2

736

40

92

END

ASH CI

2

208

32

84

SHADY LN

ASH CI

MAPLE CT

2

268

32

85

SHADY LN

MAPLS CT

END

2

88

32

85

010

SHIELLS DR

THIRD ST

SECOND ST

2

657

36

83

SIERAV10

010

SIERRA VISTA AV

MOCKINGBIRD LANE

SESPE AV

2

144

40

56

SIERAV20

020

SIERRA VISTA AV

SESPE AV

LOS SERENOS DR

2

270

36

41

SIERAV30

030

SIERRA VISTA AV

LOS SERENOS DR

402' N/0 EL PASEO ST

2

391

36

40

SIERAV40

040

SIERRA VISTA AV

402' N/0 EL PASEO ST

EL PASEO ST

2

383

36

30

SOPAC10

010

SOUTHERN PACIFIC ST

SANTA FE ST

BURLINGTON ST

2

480

34

77

Street ID

Section ID

Road Names

SESPE40

040

SESPE AV

SESPE50

050

SESPE AV

C ST

SESPE60

060

SESPE AV

BURSON LN

SESPE80

080

SESPE AV

SESPE90

090

SESPE AV

SESPEP10

010

SESPE PLACE

SHADY10

010

SHADY LN

SHADY20

020

SHADY30

030

SHIELL10

Begin Location SIERRA VISTASEGMENTS AV ROAD

Current PCI

STDIUM10

010

STADIUM WAY

SECOND ST

A ST

2

447

36

89

STEPHN10

010

STEPHENS ST

BARD ST

END

2

148

36

27

STONEH10

010

STONEHEDGE DR

CENTRAL AV

WOODGROVE RD

2

668

40

64

SURREY10

010

SURREY WY

RIVER ST

CARRIAGE PL-N

2

534

40

66

SURREY20

020

SURREY WY

CARRIAGE PL-N

CARRIAGE PL-S

2

629

40

66

SURREY30

030

SURREY WY

RIVER ST

SANTA FE ST

2

216

40

79

SURREY40

040

SURREY WY

SANTA FE ST

UNION PACIFIC ST

2

254

40

77

SURREY50

050

SURREY WY

UNION PACIFIC ST

BURLINGTON ST

2

245

40

77

TAYLOR10

010

TAYLOR LN

CUL-DE-SAC

TAYLOR LN #958

2

135

34

92

TAYLOR20

020

TAYLOR LN

TAYLOR LN #958

TAYLOR LN #928

2

202

34

84

TAYLOR30

030

TAYLOR LN

TAYLOR LN #928

FIFTH ST

2

192

34

92

TAYLOR40

040

TAYLOR LN

CUL-DE-SAC

TAYLOR LN #955

2

90

34

91

TAYLOR50

050

TAYLOR LN

CUL-DE-SAC

TAYLOR LN #921

2

115

34

91

TEITST10

010

TEITSORT DR

FOOTHILL DR

GATE

2

150

28

64

THIRD10

010

THIRD ST

GOODENOUGH RD

ALLEY 050

2

552

40

69

THIRD100

100

THIRD ST

A ST

FERNGLEN CI

2

128

46

74

THIRD110

110

THIRD ST

FERNGLEN CI

AKERS ST

2

112

46

70

THIRD120

120

THIRD ST

AKERS ST

FINE ST

2

282

46

70

THIRD130

130

THIRD ST

FINE ST

END

2

381

36

58

THIRD140

140

THIRD ST

END

SHIELLS DR

2

380

28

88

THIRD150

150

THIRD ST

SHIELLS DR

WALKER LN

2

71

36

67

THIRD160

160

THIRD ST

WALKER LN

CENTRAL AV

2

274

36

86

THIRD170

170

THIRD ST

CENTRAL AV

FILLMORE ST

2

346

36

66

THIRD180

180

THIRD ST

FILLMORE ST

SARATOGA ST

2

359

36

68

THIRD190

190

THIRD ST

SARATOGA ST

CLAY ST

2

361

36

69

THIRD20

020

THIRD ST

ALLEY 050

LEMON WY

2

442

40

71

THIRD200

200

THIRD ST

CLAY ST

MOUNTAIN VIEW ST

2

344

36

68

THIRD210

210

THIRD ST

MOUNTAIN VIEW ST

ISLAND VIEW ST

2

593

36

68

THIRD220

220

THIRD ST

ISLAND VIEW ST

END

2

256

36

82

THIRD30

030

THIRD ST

LEMON WAY

B ST

2

301

40

73

THIRD40

040

THIRD ST

B ST

150 FT W/O CHAPARRAL ST

2

323

46

62

THIRD50

050

THIRD ST

150 FT W/O CHAPARRAL ST

CHAPARRAL ST

2

150

46

75

THIRD60

060

THIRD ST

CHAPARRAL ST

MANZANITA DR

2

252

46

72

THIRD70

070

THIRD ST

MANZANITA DR

YUCCA DR

2

272

46

69

THIRD80

080

THIRD ST

YUCCA DR

BOULDER ST

2

246

46

71

Appendix A: 10 of 12

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

A ST

2

177

46

70

CUL-DE-SAC

2

220

40

92

SURREY WY

2

748

34

92

SURREY WY

BURLINGTON ST

2

471

34

92

FOURTH ST

CUL-DE-SAC

2

398

38

83

VENTURA ST-FRONTAGE

LOS SERENOS DR

ALLEY 020

2

550

26

84

VILLAGE SQ

EL PASEO ST

EL PASEO ST

2

1055

44

13

THIRD ST

CUL-DE-SAC

2

509

40

75

COTTONWOOD LN

COTTONWOOD LN

2

875

40

46

COTTONWOOD LN

D ST

2

719

40

42

WILEMAN ST

OLIVER ST

BURSON ST

2

350

40

62

020

WILEMAN ST

BURSON ST

GLEN WY

2

596

40

62

030

WILEMAN ST

GLEN WY

B ST

2

453

40

65

WILEMN40

040

WILEMAN ST

B

MCCAMPBELL ST

2

448

40

69

WOODGR10

010

WOODGROVE RD

FOURTH ST

STONEHEDGE

2

874

40

76

WOODGR20

020

WOODGROVE RD

STONEHEDGE ST

CUL-DE-SAC

2

307

40

72

YUCCA10

010

YUCCA DR

THIRD ST

SECOND ST

2

651

40

76

Miles:

38.27

Street ID

Section ID

Road Names

THIRD90

090

THIRD ST

TIGHE10

010

TIGHE LN

FOURTH ST

UNNPAC10

010

UNION PACIFIC ST

B ST

UNNPAC20

020

UNION PACIFIC ST

VALLVS10

010

VALLEY VISTA

VENTUR10

010

VILLAG10

010

WALKER10

010

WALKER LN

WATERF10

010

WATERFORD LN

WATERF20

020

WATERFORD LN

WILEMN10

010

WILEMN20 WILEMN30

Begin Location BOULDER ROAD ST SEGMENTS

Appendix A: 11 of 12

PCI

Current PCI

68

MTC - StreetSaver July 26, 2017

PCI Inventory Report (Road Segments, Parking Lots, and Bike Paths)

Network Weighted Average PCI:

69

End Location

Lanes

Section Length (ft)

Section Width (ft)

ORIOLE BASIN OUTLET

BLUE JAY BASIN

1

2069

10

91

BLUE JAY

BLUE JAY BASIN

SR-126 UNDERPASS NORTH

1

1040

10

90

BYPASS EAST

SR-23 UNDERPASS EAST

RIVER ST

1

401

10

85

BYPASS WEST

SR-23 UNDERPASS WEST

RIVER ST

1

755

10

73

COTTONWOOD RAMP

BLUE JAY BASIN

COTTONWOOD LN

1

731

10

78

030

HOMETOWN

WW#7 RAMP

OLD TELEGRAPH UNDERPASS

1

1898

10

91

340

MIDDLE SCHOOL

B ST

FIRST ST

1

1115

10

83

ZBP050

050

OLD TELEGRAPH RAMP

UNDERPASS SOUTH END

OLD TELEGRAPH RD

1

322

10

92

ZBP040

040

OLD TELEGRAPH UNDERP

UNDERPASS NORTH END

UNDERPASS SOUTH END

1

287

10

97

ZBP210

210

RIVER OAKS

READING ST

SANTA CLARA LEVEE

1

615

10

91

ZBP230

230

RIVERWALKPARK

SANTA CLARA LEVEE

SR-23 UNDERPASS WEST

1

1650

10

81

ZBP010

010

SESPE LEVEE NORTH

NORTH TERMINUS

WW#7 RAMP

1

2655

10

92

ZBP060

060

SHIELLS PARK

OLD TELEGRAPH RD

ORIOLE BASIN OUTLET

1

1855

10

92

ZBP120

120

SR-126 RAMP

SR-126 HIGHWAY

WRP LEVEE

1

395

10

92

ZBP100

100

SR-126 UNDERPASS

SR-126 UNDERPASS NORTH

SR-126 UNDERPASS SOUTH

1

911

10

97

ZBP240

240

SR-23 UNDERPASS

SR-23 UNDERPASS WEST

SR-23 UNDERPASS EAST

1

466

10

94

ZBP300

300

TELEPHONE RD

GOODENOUGH RD

B ST

1

1717

10

61

ZBP310

310

TELEPHONE RD

B ST

SESPE PLACE

1

971

10

89

ZBP320

320

TELEPHONE RD

SESPE PLACE

A ST

1

798

10

89

ZBP330

330

TELEPHONE RD

A ST

CENTRAL AV

1

1473

10

67

ZBP110

110

WRP LEVEE

SR-126 UNDERPASS SOUTH

END AT WRP DISPLAY

1

876

10

91

ZBP130

130

WRP RAMP

WRP LEVEE

RIVER ST CUL-DU-SAC

1

581

10

92

ZBP020

020

WW#7 RAMP

SESPE LEVEE NORTH

964 CATALANO CT

1

280

10

92

ZBP200

200

WWTP

WWTP GATE

READING ST

1

503

10

91

ZBP220

220

WWTP LEVEE

WWTP END

SANTA CLARA LEVEE

1

1190

10

92

Miles:

4.84

Street ID

Section ID

Road Names

Begin Location

ZBP070

070

BIRD TRACT

ZBP080

080

ZBP260

260

ZBP250

250

ZBP090

090

ZBP030 ZBP340

Current PCI

ROAD SEGMENTS BIKE PATHS

PCI

86

PARKING LOTS ZPABD10

010

BUS DEPOT LOT

533 SANTA CLARA ST

533 SANTA CLARA ST

1

180

98

81

ZPAFS20

020

FILLMORE ST NORTH LOT

351 FILLMORE ST

351 FILLMORE ST

1

265

141

53

ZPAFS10

010

FILLMORE ST SOUTH LOT

231 FILLMORE ST

231 FILLMORE ST

1

300

56

59

ZLAR10

010

LEVEE ACCESS ROAD

701 GOODENOUGH RD

701 GOODENOUGH RD

1

270

15

67

ZPAPD10

010

POLICE DEPT LOT

524 SESPE AV

524 SESPE AV

1

200

122

69

ZPAPO10

010

POST OFFICE LOT

519 MAIN ST

519 MAIN ST

1

250

134

79

ZPAPW10

010

PUBLIC WORKS YARD

701 SESPE PLACE

701 SESPE PLACE

1

350

172

93

ZPASC10

010

SANTA CLARA ST PARKING LOT

440 SANTA CLARA ST

440 SANTA CLARA ST

1

110

59

75

ZPASP10

010

SHIELLS PARK LOT

649 C ST

649 C ST

1

520

61

35

ZPARP20

020

TWO RIVERS PARK-EAST

XXX RIVER STREET

XXX RIVER ST

1

660

19

92

ZPARP10

010

TWO RIVERS PARK-WEST

XXX RIVER STREET

XXX RIVER ST

1

465

84

92

ZPAWR10

010

WATER RECYCLING PLANT

1580 RIVER ST

1580 RIVER ST

1

500

169

93

ZPAWY20

020

WELL #7 YARD

964 CATALANO CT

964 CATALANO CT

1

60

43

83

ZPAWY10

010

WELL #8 ENTRY & YARD

1301 GOODENOUGH RD

1301 GOODENOUGH RD

1

500

18

91

Appendix A: 12 of 12

PCI

79

Overall Network PCI

69

Pavement Management Report 2017– City of Fillmore

APPENDIX B PCI Geographical Map

B

2017 FILLMORE STREET MAP SHOWING PAVEMENT CONDITION INDEX

RY # 8 EN T

Z- W EL L

& YAR D

SH AD Y TE IT SO RT D R

LN

E FR

LL

RD

TH I

N OU G H

FO O

AR IA LN

GO OD E

M

DR

LI

N

B ST

D

R

C AN D EL

Legend City_Limit

R TAY LO

LN EY KL HI NC LN RN HO RT

T V IE W S

ELK IN S LN

IE TA IN V W ST ALL EY 2 20

T C LAY S

AV

N LOR A L ALL EY

T ST

2 40

M AR K E

ALL EY

T C LAY S

T O GA S

2 50

M AIN S

T

C L AR A

ST

T M OU N

SAN T A

W ST

2 70 ALL EY

M OU N

GA ST

T C LAY S

IE TA IN V

ST

O SAR AT

V TA IN

N O OD L

BR ID LE

LN

R IV ER

ST

T OO D S

D LN

AL AV

W IL D W

EW OO

W OO D

T IE W S

SAN D L

C EN T R

U N IO N

ED G

WY EW O OD

2 30

RIV ER ST

ED G

EW

DW Y

FE S T

PA C IF IC

ST

B ST

ST

BU R LI N G

TO N ST

ST

ST

·

OO

W ST

IC ST IO N PA C IF

W IL LO

UN

IF IC R N PA C

OR IEN T

E SO U TH

SA

AN D E R IO G R

G ST

C ST

D ST

R EAD IN

ST NTA FE

Y WY SU R R E

L E LN

SA ST

CAR RIAG E PL

B ST

OA KD A

C ST

SAN T A

ST NTA FE

ST

R WY ALL EY

AV

SAR AT

R E ST FIL LM O T H LO T T N OR O RE S 1 80 ALL EY

LOT

DR

SES PE

C L AR A

AV

N AV ON L

C ST

0 20 ALL EY

E ST

D ST

ST

M OU N

T C LAY S 2 10

2 00

T O GA S

ALL EY

SAR AT

ALL EY

Z- F IL LM

1 40

T PA LM S

ALL EY

O UTH E ST S

D ST

C ASN E

ELK W

R IV ER

SEC O N

C OO K

SAN T A

Y WY

SU R R E

R ST L N

3 40

T

M AIN S

L OT

OR Z- F IL LM

2 80

T BAR D S

SES PE

ST

ST

110

1 30

VE E G RO

ALL EY

OLIV E

ST

C L AR A

R E ST

SAN T A

FIL LM O

1 90

1 00

ALL EY

C L AR A

E PO T Z- BU S D

ALL EY

O GA ST

T BAR D S

ALL EY

AV

T C LAY S

SAR AT

EN S ST

1 70

1 60

SES PE

ALL EY

SAN T A

2 90

T O GA S

ST EP H

R E ST

AL AV

D

DR

1 50 T ALL EY IC E LO T OF F Z- PO S

ST

ALL EY

SAR AT

3 00

R E ST FIL LM O

C EN T R

SY AR

ALL EY

GT O N

ALL EY

RK

D ST

ST

ELM H U

IS LA N D

T O GA S

HA

SAR AT ALL EY

FIL LM O

3 10

S DR

WO

AR A ST

R IV ER

R Z- T W O

RD S T

IC

OR A N G

LL E D R D EL VA

CL SAN T A

OD LN

A PAR K -E IVE R S

ALL EY

SH IEL L OR C H A

BL

KEN S IN

AV

ST

OLIV ER

Y GLE N W

A ST

E SQ

A N ST

B ST

N LN

A AV A VIST

S CT

B CT

ST 0 30 ALL EY

DR

P BE LL

BU R SO

SIER R

ST OLIV ER

VILLA G EO EL PA S

ST IL EM A N

AV

ST TH IR D

3 20

T

T

PLA C E SES PE

SES PE

W IL EM

OR T EG

ALL EY

M W AY

HUME

AV SES PE

W ST A IN V IE M OU N T

R

VIS TA

LN

EN C I

Z- P U

T

W

BL

SEC O N

STA D IU

S FIR S T

RD

D ST

AV

EO EL PA S

LN TIG H E

GA LV IN

FE R N GL

ER S T

H

BLA IN E

V A IN E A

ST TH IR D

M C C AM

AR H OW

R H OD E

MC NA

S DR

N O RD L

AP

ST

T KIN G S

E DR

LEV E

C OT

T ON W O

R EN O LOS SE

F WAT ER

D ST

R CT

Parcels

Y ST BLU E JA

BO U LD

T KIN G S

CT

C ON D O

Street-Not City Owned

S FIR S T

T

D LN

R OB IN

Street-Not Rated

SES PE

DR

GR

3 70

3 60

ALL EY

S FIR S T

TE

PR IC E

IN G BIR

CT QU A IL

D ST

LE

S FIR S T

LN

D ST

R E CI

S FIR S T

M OC K

0-11: Failed

YU C C A

D

M EA D O

12-25: Very Poor

R N ITA D

OL

DR W L AR K

L OR I O

ALL EY

T

DR

M AN Z A

RRA L S

AR K

ALL EY

3 30 ALL EY

ST TH IR D

SEC O N

D ST SEC O N

B ST

OW L

C H APA

WY

0 40

26-45: Poor

LEM O N

ALL EY

M EA D

SEC O N

CT

3 50 ALL EY

ST

ST

ST TH IR D

N

CT

N FAL C O

R WA LK E

H FO U R T

ST TH IR D

B ST

M IT H L

0 50

AR R AS

0 60

T FIN E S

AKE R S

0 80

BL

BL

EAG LE

K LO T LS PA R

46-55: Fair

ST

V A IN E A

V A IN E A

ALL EY

DR

A ST

ST

ALL EY

B ST

0 70 ALL EY

Z- SH IEL

56-70: Good

N LN

H FO U R T

H FO U R T

ALL EY

71-85: Very Good

ED ISO

H ED G E

M ES A D

ST ON E

VA LL EY

T FIF T H S

N WY

86-100: Excellent

WOO DGRO VE RD

ST FIF T H

ED ISO

PCI

HS T

RY CT

B ST

FI F T

LN

Street-City Owned

C OU N T

Z- WATE R RE CYCL ING PL ANT

Appendix B Page 1 of 1

0

850

1,700

3,400

5,100

Feet 6,800 drb - June 29, 2017

Pavement Management Report 2017– City of Fillmore

APPENDIX C List of roads recommended for surface treatments based on City’s proposed budget

C

8

Roads Selected for Treatment - Base Budget Scenario ($350K/year)

Legend

Roads Selected for Treatment Treatment Year

Z-W ELL #8

YARD

NO

RT

H

2018

EN TRY &

AT H

-SES

PE

2020

SHAD Y LN

LE V

EE

2019

BIK E P

2021

DE L A

Segment Inventory

B ST

CA N

2022

R IA L

UGH RD GOODENO

AIN VIEW

RIVER ST

ST

EDGEW

OOD W Y

O

WO

E

BIKE PATH-BYPA

N EY L C KL H IN

TO WN ME - HO

D

EP ATH BIK

TR IR D -B TH

PA BI KE

E

SS WEST

M OU N T

RIVE R ST

OD ST

OOD LN

R1

AR A ST

VIEW ST

OO D LN

WILDW O

BRID LEW

L AV

ST

P LE BIKE P AT H VEE -S

ST

IN MOUNTA

L KW

CENTRA WILLOW

WR

MA RKET

MAIN ST

SANTA CL

270 ALLEY CLAY ST

PALM ST

EP ATH -

SESPE AV

LORA LN 0 ALLEY 25

0 ALLEY 24

CLAY ST

ST FI LLMORE 0 ALLEY 18

ST

D LN BRID L EW OO

RIVE R ST

VI EW ST

0 ALLEY 22

WY CASN ER 0 ALLEY 23

SESPE AV

MAIN ST

AR A SANTA CL

ST

COOK DR

CLAY ST

0 ALLEY 21 GA ST

SARATO

FI RST ST

VIEW ST

BARD ST

0 ALLEY 20 ST

FI LLMORE V

SECOND

IN MOUNTA

COND ST

THIRD ST

LN ELKINS

A ST SARATO G

AR A ST

0 ALLEY 28

GA ST

SANTA CL

0 ALLEY 19

MAIN ST ELE P H ONE R D

CLAY ST

0 ALLEY 29

SARATO

GA ST ALLEY 300

ST

SESPE A

0 ALLEY 15

0 ALLEY 13

L AV

0 ALLEY 10

DR

0 ALLEY 34 TH IR D ST

ISLAND

SARATO

FI LLMORE

ST

B

P A TH-T

CENTRA

Y

CI FIC ST UNION PA INGTON ST PA RK IVERWALK ATH-R IK E P

BURL

BI K E

SE

ST

0 ALLEY 37 BLAINE AV

0 ALLEY 33 TH IR D ST

0 ALLEY 14 OLIVE ST

ST

SURREY W

ST

0 ALLEY 31

GTO N KEN SIN 0 ALLEY 17

0 ALLEY 16

DR

CAR RIA GE PL

PACIFIC

LE VEE

CLAR A

SANTA FE

B ST

BIK

L AV

SANTA

E

BALDEN LN

B ST

-WW TP

RN SOUTHE

N DE ST

OR IENT ST

ST

-WW TP

TH BIKE PA

RI O G RA

C ST

D ST

BIKE P A TH

FI RST ST

SESPE AV

ST

0 ALLEY 36 BLAINE AV

BARD ST

0 ALLEY 11

Q

ELL ST

SANTA

READ IN G

RK-EAST

ST

ST CLAR A

ST LN ELMH UR RIVE R ST

C ST

D ST

E ST

VE RS PA Z-TWO RI

OLIVER

WY

ES

ST

GLEN

VI LL A G

PB MC CA M

LN

O ST EL PA SE 0 ALLEY 03

ST

B ST

BURSON C ST

CT MC NAB

VISTA AV SIER RA CT RHODES

OLIVER

E

L L VA L

SECOND

ST SECOND

D L E SC HOO L FI RST ST Z-P U BL IC W OR KS DR YAR SES PE P LAC D E

SESPE AV ST W ILEMAN

SESPE AV ST WILEMAN

ORTEGA

DR

HU

M

PRIC E ST

KING ST

TH IR D ST

SHIE LLS

RD

EP ATH -MID

0 ALLEY 32

R LN

BI K

LN

ST

PH

GALV IN

RA

ST

SECOND

0 ALLEY 35

WALK E

CI

WAY STAD IUM

DR

TE LE G

RAL ST

AR K

B ST

SECOND

D

FI RST ST

IRD LN

LN

WY

CT LE CIR OR IO FI RST ST

ER

LEMON

C ST

FI NC H

GB MOCKIN NOS DR

OOD COTTONW

D ST

-B

W

ON

ME A DOW L

SESPE AV

LOS SERE

D UN

BIK

H AT EP

JAY

PH

0 ALLEY 04

LE

DR

FOURTH

TI GH E LN

CHAPAR

LN - TE

FERNG LEN

FI NE ST

TH IR D ST

ST

R ST BOULDE YUCCA DR

0 ALLEY 08

BLAINE AV

B ST

0 ALLEY 06

M ITH

EAGLE CT

EP AT H

CT QUAIL

ROBIN CT

26

PA ER

SS

E LU

FOURTH

ILL

R OV E R D D G ST ON EH E D GE DR

AKER S ST

B ST

0 ALLEY 07 BLAINE AV

AS

C ST

Y ST BLUE JA RD LN ATERFO

LN

ST

FOURTH

0 ALLEY 05

ARR

BIK

T AC

A ST

EDIS ON

WY

Road Segments

COUN TRY CT

FI FTH ST

EDIS ON

A I

Parking Lots

FI FTH ST

B ST

Bike Paths

LN TAYLOR

½ ¾

TH

CENTRA

N

Facility Type

FO O

0

0.25

0.5 Miles

List of Roads Recommended for Surface Treatment 2018-2022 Base Budget: $350,000 per year - 10% maximum for preventive maintenance (PM) Street ID

Section ID

Road Name

Begin Location

End Location

Section Section Length Width (ft) (ft)

MTC - StreetSaver Budget Scenario - Base Budget July 27, 2017 Treatment

PCI Before Treatment

Treated PCI

Est. Cost

Roads Selected for Treatment in 2018 BURSON10

010

BURSON LN

SESPE AV

WILEMAN ST

187

40

THIN AC OVERLAY

61

100

$

10,400

CST60

060

C ST

CST70

070

C ST

KING ST

SESPE AV

441

40

THIN AC OVERLAY

65

100

$

30,400

SESPE AV

OLIVER ST

440

40

THIN AC OVERLAY

64

100

$

30,400

CST80

080

C ST

CST90

090

C ST

OLIVER ST

ORTEGA ST

261

40

THIN AC OVERLAY

64

100

$

18,000

ORTEGA ST

EL PASEO ST

360

40

THIN AC OVERLAY

66

100

$

24,800

CARRIG10

010

CARRIAGE PL

SURREY WY

SURREY WY

168

40

REJUVENATION SEAL (PM)

76

84

$

3,600

COOKDR20

020

COOK DR

ERSKIN10

010

ERSKINE LN

CASNER WY

SESPE AV

285

40

THIN AC OVERLAY

61

100

$

15,900

PRICE ST

CUL-DE-SAC

313

40

THIN AC OVERLAY

60

100

$

17,400

GLENWY40

040

GLEN WY

GDENUF30

030

GOODENOUGH RD

WILEMAN ST

SESPE AV

232

40

THIN AC OVERLAY

60

100

$

12,900

A ST

B ST

1440

34

REJUVENATION SEAL (PM)

73

82

$

25,900

MEADWL100

100

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #4

15

40

MILL AND AC OVERLAY W/BASE REPAIR

43

100

$

1,400

MEADWL140 MTVIEW90

140

MEADOWLARK DR

MEADOWLARK DR

CUL-DE-SAC #6

122

40

THIN AC OVERLAY

61

100

$

6,800

090

MOUNTAIN VIEW ST

MAIN

RR-XING

138

38

THIN AC OVERLAY

61

100

$

7,300

OTELE10

010

OLD TELEGRAPH RD

CITY LIMIT

GOODENOUGH RD

437

34

THIN AC OVERLAY

68

100

$

25,600

OTELE50

050

OLD TELEGRAPH RD

HUME ST-W

HUME ST-E

326

38

THIN AC OVERLAY

69

100

$

21,400

OLIVER20

020

OLIVER ST

WILEMAN ST

BURSON LN

428

40

THIN AC OVERLAY

60

100

$

23,800

OLIVER40

040

OLIVER ST

GLEN WY-W

GLEN WY

150

40

THIN AC OVERLAY

60

100

$

8,400

RIVERS180

180

RIVER ST

RIVER CT

BRIDLEWOOD LN

251

40

REJUVENATION SEAL (PM)

78

86

$

5,300

SANTCL30

030

SANTA CLARA ST

135' W/O B ST

B ST

116

40

THIN AC OVERLAY

61

100

$

6,500

WILEMN10

010

WILEMAN ST

OLIVER ST

BURSON ST

350

40

THIN AC OVERLAY

61

100

$

19,500

WILEMN20

020

WILEMAN ST

BURSON ST

GLEN WY

596

40

THIN AC OVERLAY

61

100

$

33,200

$

348,900

Miles:

1.34

Appendix C: 1 of 5

List of Roads Recommended for Surface Treatment 2018-2022 Base Budget: $350,000 per year - 10% maximum for preventive maintenance (PM) Street ID

Section ID

Road Name

Begin Location

End Location

Section Section Length Width (ft) (ft)

MTC - StreetSaver Budget Scenario - Base Budget July 27, 2017 Treatment

PCI Before Treatment

Treated PCI

Est. Cost

Roads Selected for Treatment in 2018 2019 AST100

100

A ST

SESPE AV

RR X-ING

283

40

THIN AC OVERLAY

70

100

$

19,900

AST40

040

A ST

FOURTH ST

BLAINE ST

345

40

THIN AC OVERLAY

68

100

$

24,300

AST90

090

A ST

FIRST ST

SESPE AV

679

40

THIN AC OVERLAY

70

100

$

47,800

BURLTN50

050

BURLINGTON ST

B ST

SURREY WY

781

34

REJUVENATION SEAL (PM)

77

85

$

14,300

CARILO10

010

CARRILLO CT

GLENWY30

030

GLEN WY

GDENUF90

090

GOODENOUGH RD

MARKET10

010

MARKET ST

MARKET20

020

MARKET ST

MARKET30

030

MARKET ST

MEADWL180

180

MEADOWLARK DR

OTELE30

030

OLD TELEGRAPH RD

OTELE40

040

OLD TELEGRAPH RD

OLIVER10

010

OLIVER ST

C ST

RIVERC10

010

RIVER CT

SANTFE60

060

SANTA FE ST

SESPE100

100

SESPE110

110

STONEH10

010

STONEHEDGE DR

SURREY30

030

TEITST10

010

WILEMN30

030

CANDELARIA LN

CUL-DE-SAC

99

34

REJUVENATION SEAL (PM)

79

87

$

1,900

OLIVER ST

WILEMAN ST

179

40

THIN AC OVERLAY

61

100

$

10,200

ARRASMITH LN

THIRD ST

276

26

REJUVENATION SEAL (PM)

77

85

$

3,900

COOK DR

CASNER WY

249

40

THIN AC OVERLAY

61

100

$

14,200

CASNER WY

SESPE AV

276

40

THIN AC OVERLAY

60

100

$

15,700

SESPE AV

LORA LN

270

40

THIN AC OVERLAY

60

100

$

15,300

MEADOWLARK DR

CUL-DE-SAC #8

91

40

THIN AC OVERLAY

61

100

$

5,200

B ST

FIRST ST

279

38

THIN AC OVERLAY

69

100

$

18,700

FIRST ST

HUME ST-W

179

38

THIN AC OVERLAY

70

100

$

12,000

WILEMAN ST

205

40

THIN AC OVERLAY

60

100

$

11,700

RIVER ST

CUL-DE-SAC

76

40

REJUVENATION SEAL (PM)

75

83

$

1,700

SURREY WY

BURLINGTON ST

465

32

REJUVENATION SEAL (PM)

77

85

$

8,100

SESPE AV

B ST

MCCAMPBELL ST

466

38

THIN AC OVERLAY

61

100

$

25,100

SESPE AV

MCCAMPBELL ST

TELEGRAPH RD

463

38

THIN AC OVERLAY

60

100

$

25,000

CENTRAL AV

WOODGROVE RD

668

40

THIN AC OVERLAY

61

100

$

37,900

SURREY WY

RIVER ST

SANTA FE ST

216

40

REJUVENATION SEAL (PM)

77

85

$

4,700

TEITSORT DR

FOOTHILL DR

GATE

150

28

THIN AC OVERLAY

61

100

$

6,000

WILEMAN ST

GLEN WY

B ST

453

40

THIN AC OVERLAY

62

100

$

25,700

$

349,300

Miles:

1.35

Appendix C: 2 of 5

List of Roads Recommended for Surface Treatment 2018-2022 Base Budget: $350,000 per year - 10% maximum for preventive maintenance (PM) Street ID

Section ID

Road Name

Begin Location

End Location

Section Section Length Width (ft) (ft)

MTC - StreetSaver Budget Scenario - Base Budget July 27, 2017 Treatment

PCI Before Treatment

Treated PCI

THIN AC OVERLAY

68

100

$

24,800

Est. Cost

Roads Selected for Treatment in 2018 2020 AST50

050

A ST

BLAINE ST

THIRD ST

346

40

ALLEY40

040

ALLEY 040

BST10

010

B ST

THIRD ST

LEMON WY

765

18

THIN AC OVERLAY

62

100

$

19,900

END

GOODENOUGH RD

648

40

REJUVENATION SEAL (PM)

80

87

$

14,300

BST150

150

B ST

RIVER ST

SANTA FE ST

219

38

REJUVENATION SEAL (PM)

75

83

$

4,600

BST160 EAGLE10

160

B ST

SANTA FE ST

UNION PACIFIC ST

234

38

REJUVENATION SEAL (PM)

74

82

$

4,900

010

EAGLE CT

FALCON WY

CUL-DE-SAC

188

40

THIN AC OVERLAY

60

100

$

10,900

MAINST10

010

MAIN ST

OTELE20

020

OLD TELEGRAPH RD

ORTEGA10

010

ORTEGA ST

RIVERS170

170

RIVER ST

RIVERS190

190

RIVER ST

SANTCL100

100

SANTA CLARA ST

SARATG60

060

SARATOGA ST

SURREY10

010

SURREY WY

END

CENTRAL AV

314

32

THIN AC OVERLAY

61

100

$

14,600

GOODENOUGH RD

B ST

1837

38

THIN AC OVERLAY

68

100

$

125,100

C ST

BURSON LN

626

40

THIN AC OVERLAY

62

100

$

36,200

CENTRAL AV

RIVER CT

232

40

REJUVENATION SEAL (PM)

72

81

$

5,100

BRIDLEWOOD LN

SANDLEWOOD LN

254

40

REJUVENATION SEAL (PM)

74

82

$

5,600

OLIVE ST

PALM ST

364

36

THIN AC OVERLAY

61

100

$

19,000

FIRST ST

SESPE AV

656

34

THIN AC OVERLAY

62

100

$

32,300

RIVER ST

CARRIAGE PL-N

534

40

THIN AC OVERLAY

61

100

$

30,900

$

348,200

Miles:

1.37

Appendix C: 3 of 5

List of Roads Recommended for Surface Treatment 2018-2022 Base Budget: $350,000 per year - 10% maximum for preventive maintenance (PM) Street ID

Section ID

Road Name

Begin Location

End Location

Section Section Length Width (ft) (ft)

MTC - StreetSaver Budget Scenario - Base Budget July 27, 2017 Treatment

PCI Before Treatment

Treated PCI

Est. Cost

Roads Selected for Treatment in 2018 2021 AKERS10

010

AKERS ST

FORTH ST

THIRD ST

652

40

THIN AC OVERLAY

62

100

ALLEY90

090

ALLEY 090

FOURTH ST

EDISON LN

314

17

THIN AC OVERLAY

61

100

$

7,900

ALLEY150

150

ALLEY 150

MAIN ST

SESPE AV

509

32

THIN AC OVERLAY

62

100

$

24,100

CASNER10

010

CASNER WY

MOUNTAIN VIEW ST

MARKET ST

271

38

THIN AC OVERLAY

62

100

$

15,200

DST60

060

D ST

RIVER ST

134' S/O RIVER ST

115

20

THIN AC OVERLAY

63

100

$

3,400

DELVAL10

010

DEL VALLE DR

SANTA CLARA ST

BALDEN LN

366

40

THIN AC OVERLAY

62

100

$

21,600

EST10

010

E ST

VENTURA ST

RIVER ST

633

40

REJUVENATION SEAL (PM)

79

87

$

14,200

FILLMR10

010

FILLMORE ST

THIRD ST

SECOND ST

654

36

THIN AC OVERLAY

61

100

$

34,800

MAINST20

020

MAIN ST

CENTRAL AV

FILLMORE ST

343

38

THIN AC OVERLAY

62

100

$

19,300

OAKDAL10

010

OAKDALE LN

RIVER ST

CUL-DE-SAC

331

40

THIN AC OVERLAY

61

100

$

19,600

ORTEGA20

020

ORTEGA ST

BURSON LN

GLEN WY

491

40

THIN AC OVERLAY

62

100

$

29,000

RIVERS30

030

RIVER ST

D ST

355' E/O D ST

355

26

THIN AC OVERLAY

64

100

$

13,700

RIVERS50

050

RIVER ST

C ST

READING ST

517

30

THIN AC OVERLAY

61

100

$

22,900

SANTCL10

010

SANTA CLARA ST

CUL-DE-SAC

GLEN WY

333

40

THIN AC OVERLAY

62

100

$

19,700

SANTCL80

080

SANTA CLARA ST

A ST

ORANGE GROVE AV

338

38

THIN AC OVERLAY

61

100

$

19,000

SARATG50

050

SARATOGA ST

BARD ST

FIRST ST

275

34

THIN AC OVERLAY

61

100

$

13,800

SOPAC10

010

SOUTHERN PACIFIC ST

SANTA FE ST

BURLINGTON ST

480

34

REJUVENATION SEAL (PM)

72

81

$

9,200

SURREY40

040

SURREY WY

SANTA FE ST

UNION PACIFIC ST

254

40

REJUVENATION SEAL (PM)

72

81

$

5,700

SURREY50

050

SURREY WY

UNION PACIFIC ST

BURLINGTON ST

245

40

REJUVENATION SEAL (PM)

72

81

$

5,500

THIRD110

110

THIRD ST

FERNGLEN CI

AKERS ST

112

46

THIN AC OVERLAY

60

100

$

9,500

$

346,600

Miles:

1.44

Appendix C: 4 of 5

$

38,500

List of Roads Recommended for Surface Treatment 2018-2022 Base Budget: $350,000 per year - 10% maximum for preventive maintenance (PM) Street ID

Section ID

Road Name

Begin Location

End Location

Section Section Length Width (ft) (ft)

MTC - StreetSaver Budget Scenario - Base Budget July 27, 2017 Treatment

PCI Before Treatment

Treated PCI

Est. Cost

Roads Selected for Treatment in 2018 2022 AST110

110

A ST

RR-XING

TELEGRAPH RD

116

40

THIN AC OVERLAY

69

100

ALLEY10

010

ALLEY 010 (CENTER ST)

BST40

040

B ST

BST80

080

B ST

BURLTN10

010

BURLTN20

020

CST110

110

C ST

CANDEL10

010

CANDELARIA LN

ELKINS10

010

ELKINS LN

ELMHRS20

020

ELMHURST LN

FIRST70

070

FIRST ST

FOURTH90

090

FOURTH ST

MANZNT10

010

MANZANITA DR

MARKET40

040

MARKET ST

OTELE60

060

OLD TELEGRAPH RD

RIVERS10

010

RIVER ST

RIVERS140

140

RIVERS160

160

SECOND130

130

SECOND150 SESPE210

$

8,700

D ST

LOS SERENOS DR

292

18

THIN AC OVERLAY

61

100

$

8,000

FOURTH ST

BLAINE ST

310

36

THIN AC OVERLAY

62

100

$

16,800

TELEGRAPH RD

FIRST ST

133

40

THIN AC OVERLAY

61

100

$

8,000

BURLINGTON ST

READING ST

RIO GRANDE ST

244

34

REJUVENATION SEAL (PM)

72

81

$

4,800

BURLINGTON ST

RIO GRANDE ST

ORIENT ST

260

34

REJUVENATION SEAL (PM)

72

81

$

5,100

EL PASEO ST

VENTURA ST

284

40

THIN AC OVERLAY

70

100

$

21,200

END

CARRILLO CT

193

34

REJUVENATION SEAL (PM)

80

88

$

3,800

SECOND ST

CUL-DE-SAC

375

38

THIN AC OVERLAY

62

100

$

21,500

DEERFIELD ST

CUL-DE-SAC

197

38

THIN AC OVERLAY

62

100

$

11,300

B ST

TELEGRAPH RD

191

40

THIN AC OVERLAY

61

100

$

11,500

CENTRAL AV

VALLEY VISTA

259

40

THIN AC OVERLAY

60

100

$

19,400

CHAPARRAL ST

THIRD ST

621

40

THIN AC OVERLAY

61

100

$

37,400

LORA LN

MAIN ST

113

40

THIN AC OVERLAY

62

100

$

6,800

HUME ST-E

SESPE PLACE

189

38

THIN AC OVERLAY

68

100

$

13,400

CUL-DE-SAC

E ST

905

38

REJUVENATION SEAL (PM)

79

87

$

19,700

RIVER ST

A ST

720' E/O A ST

684

40

THIN AC OVERLAY

61

100

$

41,200

RIVER ST

WILLOW ST

CENTRAL AV

347

40

THIN AC OVERLAY

61

100

$

20,900

SECOND ST

MOUNTAIN VIEW ST

ELKINS LN

297

40

THIN AC OVERLAY

63

100

$

17,900

150

SECOND ST

ISLAND VIEW ST

END

208

40

THIN AC OVERLAY

63

100

$

12,600

210

SESPE AV

COOK DR

END

153

40

THIN AC OVERLAY

62

100

$

9,300

SHADY30

030

SHADY LN

MAPLS CT

END

88

32

REJUVENATION SEAL (PM)

78

86

$

1,700

WILEMN40

040

WILEMAN ST

B

MCCAMPBELL ST

448

40

THIN AC OVERLAY

61

100

$

27,000

$

348,000

Miles:

1.31

Total Miles

6.80

Appendix C: 5 of 5

Pavement Management Report 2017– City of Fillmore

APPENDIX D Pavement Treatment Decision Tree Criteria

D

City of Fillmore Decision Tree for Pavement Treatments

Class Name: PCI Range Arterial & Collectors: Class I Crack Treatment 80-70 Surface Treatment 80-70 Restoration Treatment 80-70 Class II Light Rehab/Rejuv. 70-50 Class III Rehabilitation (load related) 70-50 Class IV Rehab. w/ Reconst. 50-25 Class V Reconstruction 25-0

Local Streets and Parking Lots: Class I Crack Treatment Surface Treatment Restoration Treatment Class II Light Rehab/Rejuv. Class III Rehabilitation (load related) Class IV Rehab. w/ Reconst. Class V Reconstruction

80-70 80-70 80-70 70-50 70-50 50-25 25-0

Concrete Segments: Class I Crack Treatment Surface Treatment Restoration Treatment Class II Light Rehab/Rejuv. Class III Rehabilitation (load related) Class IV Rehab. w/ Reconst. Class V Reconstruction

80-70 80-70 80-70 70-50 70-50 50-25 25-0

Cost Sq Ft.

*Cost/ sq yd

Treatment Name:

$ $ $ $ $ $

0.72 1.89 1.72 2.00 3.11 5.56

$ $ $ $ $ $

6.50 17.00 15.50 18.00 28.00 50.00

Do Nothing Rejuvenation Seal Mill & Overlay Thin Overlay Mill & Overlay Mill & Overlay w/Base repairs Reconstruction and/or Pulv. & Pave

$ $ $ $ $ $

0.53 1.81 1.39 1.83 2.28 4.44

$ $ $ $ $ $

4.75 16.25 12.50 16.50 20.50 40.00

Do Nothing Rejuvenation Seal Mill & Overlay Thin Overlay Mill & Overlay Mill & Overlay w/Base repairs Reconstruction and/or Pulv. & Pave

$ $

13.33 13.33

$ 120.00 $ 120.00

Do Nothing Do Nothing Do Nothing Do Nothing Do Nothing Recosntruct Structure (PCC) Recosntruct Structure (PCC)

* Cost is for purposes of budget needs and projections.

Appendix A: Page 1 of 1

Years between Year Between Number of surface crack seals Surface Seals seals before Overlay: 3

4

7 2

7 3