City Council City OfInglside

Agenda Item

From:

Mariana Garcia, Parks and Facility Manager

Meeting Date: June 27, 2017

Agenda Wording: Discussion, Consideration

and Action of Expanding the Number of Bleachers at the New

Ballfields and Authorizing Staff to Execute a Change Order.

Attachments:

Hanson

Letter, Live Oak

Spread Sheet

Legal Review:

Executive Summary: June13, 2017

Hanson has provided us with a cost estimate for two options at the Live Oak Sports Complex. Option one will add an extension to the new bleacher units per field on the opposite side of the

dugouts. This option would include new cement to the new bleachers and the gates for entry would have to be relocated.

It will also include sidewalks around to the new set of bleachers.

For' this option there would also need to be new grass seed to fill in where the ground was disturbed. Option two is to increase the length of the current bleachers from 21 feet to 36 feet. The rows

would stay the same but the length would increase. The concrete would have to be extended as well. New seed would be needed for this option as well to fill in where grass was disturbed. June27,

2017

Council requested staff to speak with Little League about seating and the requirements for hosting tournaments. The Regional tournament requires 500 for seating and the state level requires 1, 000. The seating is for the entire complex. We currently do not have seating at the field to the right of the new baseball field.

Currently we have bleachers that are moved to and from Skate Park and Live Oak Park for

various events. We can pull those bleachers to add around the stadium to meet the requirement.

Impact

if Approved:

Additional seating at Live Oak Sports Complex

Impact

if Denied:

Seating capacity stays the same.

Is Funding Required?

X Yes

No

If yes, Is it Budgeted?

Yes

X No

N/ A

Indicate Funding Source/ Explanation: There is approximately $ 30, 000 left over from the shade structure allocation at N. O. Simmons Park.

Known as:

Live Oak Sports Complex

Agenda Item Approved by City Manager

Engineering

I

Planning

I

Architecture

I

Allied

HANSON

Services

Now part of Hanson Professional Services Inc.

Date:

www, lianson=inc. com

May 25, 2017

To:

Melissa

Byrne Vossmer

City Manager

From:

Ingleside,

Texas

Naismith/

Hanson

4501

Gollihar

Professional

Services,

Inc.

Road

Corpus Christi, Texas 78411

Subject:

Additional

Bleachers

at the Live Oak Park Little

League

Fields

Ms. Vossmer,

Enclosed are cost estimates for two options for increasing the seating at the Live Oak. Park ball fields. Option One is to provide four ( 4) new bleachers

of a similar design.

For each field, one new bleacher unit would

be placed on the opposite side of the dugout from where the current units are installed. This would nearly double the seating capacity at each field from 116 to 220. The work will include new concrete pads for the

bleachers, additional sidewalks to provide access, relocating the access gates into the ball fields ( 2 per field) in order to provide enough

room to access the fields with equipment,

and new grass seed to replace what will be

disturbed.

Option Two is to increase the seating capacity of the current bleachers by increasing the overall length to 36 feet currently 21 feet); the number of rows ( currently 5) would remain the same. This option would increase the seating at each field from 116 to 204. The work -will include increasing the size of the current concrete pads, new grass seed to replace what will be disturbed, and resetting the bleachers so that they sit correctly on the expanded

concrete

pads.

We suggest that the same bleacher company that provided the current units —Southern Bleacher Company—

be

the provider/ installer under either option. The concrete work will have to be performed by a separate contractor, as Southern Bleacher does not perform this kind of work.

Sincerely, XrlsmHansoessional

Services,

Inc.

c AI

Architect

Attachments

CC:

John Michael,

PE

Craig Thompson, PE TBAE Firm BR 2458 ®

Naismith/ Hanson Professional Services, Inc.

Naismith/ Hanson Professional Services, Inc. TBPE Firm 417 ®

4501 Gollihar Road. Corpus Christi, TX 78411 ®

800- 677- 2831

TBPG Firm. 50556 ®

361- 814- 9900

TBPLS

Firm 10039500

Fax 361- 814- 4401 12 naismith- engineering. com

Naismith/ Hanson

Engineering

i Planning

4501 Gollihar Road *

HANSON

i Allied Services Corpus Christi, Texas 78411

V: ( 361) 814- 9900

F: ( 361)

814- 4401

Live Oak Park Little League Fields NEI #

Abstract

5/ 25/ 2017

Seating Options

9670

Option One: To purchase four additional bleachers of the same size and seating capacity, provide additional concrete pads and sidewalks for circulation, and fencing adjustments. Approx.

Item

Unit

Total

Price

Amount

Unit

QtV 16 1

Provide

New Bleachers:

2

Provide

New Concrete

3

Provide

New Sidewalks

4

4 Similar Pads

Ball Field Fencing Modifications ( 4 locations

5

Landscaping Repairs

Units

4 locations

1

LS "

560. 00

14, 560. 00

200

SY $

56. 00

11, 200. 00

335

SY $

53. 00

17, 755. 00

4

EA $

2, 000

8, 000. 00

1, 400

SY $

2. 00

2, 800. 00

Desin Su.b. Total Contingency

54315; 00 10%

10%

JO/oWn%,,, //////// M,,,=.

5, 431. 50

i,1,

Est. G. C. Overhead/ Profit

10%

5, 974. 65

Est. G. C. General

10%

5, 974. 65

10%

5, 974. 65

Conditions

Est. G. C. Mobilization

Page Page 11 ofof 11

HANSON

Naismith/ Hanson

Engineering

I Planning

I Allied Services Corpus Christi, Texas 78411

4501 Gollihar Road *

V: ( 361) 814- 9900 *

F: ( 361) 814- 4401

Live Oak Park Little League Fields NEI #

Abstract

5/ 25/ 2017

Seating Options

9670

Option Two: Increase the seating capacity of the existing bleachers by increasing the length to 36' in length, including related concrete work. Alprox.

Unit

Total

Price

Amount

Unit

Item Qt OPTION

Increase Bleacher Seating Capacity Resetting of Bleachers

1

LS $

12, 200. 00 $

12, 200. 00

4

EA $

1, 200. 00 $

4, 800. 00

3

Increase Existing Concrete Pad Size

100

SY $

56. 00 $

5, 600. 00

4

Provide

35

SY $

53. 00 $

1, 855. 00

700

SY $

2. 00 $

1, 400. 00

1 2

5

New Concrete

Sidewalks

Landscaping Repairs

25, 855. 00

Desi,.: n Sub Total` 10%

Contingency 10% Construction SutiT., otalN`.

2, 585. 50

X28' 440: 50

J,;. . ,...';. ...

Est. G. C. Overhead/ Profit

10%

Est. G. C. General Conditions

10% _

2, 844. 05

Est. G. C. Mobilization

10%

2, 844. 05

Page Page 11 ofof 11

2, 844. 05

Live Oak Sports Complex ( Baseball) 2015

Bond

Park

Improvements

NOTES

The Sources of Funding reflected assumes the following: 1) A portion of the FY 16/ 17 Uncommitted

Capital- Appro

is authorized

2) The $ 66, 000 of shade structures are NOT constructed 3) The electrical work for will not exceed $ 40k

4) There are no engineering fees for the lights or scoreboard.

5) As. of 02/ 21/ 2017, Engineering Fees are capped at 84, 863

2)

Live Oak Park- IDC 20170223c ( 3). x1sx