clarendon west redevelopment - Arlingtonva

Report 3 Downloads 114 Views
CLARENDON WEST REDEVELOPMENT

Ownership

Red Top Cab in joint venture with The Shooshan Company

Developer

The Shooshan Company

Zoning Attorney Architect Landscape Architect Civil Engineer

Date

CLARENDON WEST REDEVELOPMENT June 18, 2015

Bean, Kinney & Korman, P.C. WDG Architecture, PLLC Parker Rodriguez Inc. Bowman Consulting

June 18, 2015

A-01

THE HUDSON

CVS DON TITO THE BEACON LIBERTY TAVERN O’SULLIVAN’S

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-02 AERIAL PHOTO

ET N. JACKSON STRE

N

RE

ET

BLDG. 3

TH

.H

ST

N. JOHNSON STRE

ET

THE HUDSON

13

N

SO

UD

BLDG. 2

RE

ST

T

TH

12

BLDG. 1

ET

EE

R ST

CVS

DON TITO

THE BEACON

D.

IN

RV

.I

N

LIBERTY TAVERN

G

N

ET

RE ST

O’SULLIVAN’S

O ILS

V BL

W

WASHINGTON BLVD.

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-03 SITE PLAN - MASSING

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-04

REALIZED SECTOR PLAN BENEFITS: - DEDICATION OF OPEN SPACE FOR FUTURE PARK - RECONFIGURED N. JOHNSON STREET - 13TH STREET / WASHINGTON BLVD. ALIGNMENT - WASHINGTON BLVD. WIDENING - NEW 12TH STREET - PRESERVATION OF AT-RISK WINDOWS - STOOP ENTRANCES ALONG 13TH STREET - NEW IVY STREET PEDESTRIAN PATH - INCORPORATION OF ADJACENT LOT AT 13TH STREET AND N. HUDSON - ALLEY WIDENING

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-05 REALIZED SECTOR PLAN BENEFITS

LEGEND PEDESTRIAN ACCESS

DEDICATION OF OPEN SPACE FOR FUTURE PARK

STOOP ENTRANCES ALONG 13TH STREET

NEW IVY ST. PEDESTRIAN PATH

PRESERVATION OF AT-RISK WINDOWS ON ADJACENT BUILDINGS

STOOP ENTRANCES ALONG 13TH STREET

INCORPORATION OF ADJACENT LOT AT 13TH STREET & N. HUDSON STREET

RECONFIGURED N. JOHNSON STREET 13TH

ET

STRE

13TH STREET / WASHINGTON BLVD. ALIGNMENT

EXISTING BLDG

SERVICE

PARKING

MAIN RESIDENTIAL ENTRY

SERVICE AT LEVEL 2

W

AS

HI

NG

TO

N

BL

VD

EXISTING BLDG

N. IRVING STREET

WASHINGTON BLVD. WIDENING

NEW 12TH STREET N. HUDSON STREET

12TH STREET

MAIN RESIDENTIAL ENTRY

VEHICULAR ACCESS

MAIN RESIDENTIAL ENTRY

. RETAIL ENTRY SERVICE

NEW 12TH STREET PRESERVATION OF AT-RISK WINDOWS ON ADJACENT BUILDINGS

PARKING

ALLEY WIDENING

ALLEY EXISTING BLDG

N

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-06 COMPOSITE SITE PLAN

ST

KSON ST

OHNSON

6’

N N

ER H

ST

D N O

N ST

N SO D

TH



110’

76’

ST

N

ST

122’

12

TH

76’



110’ N

VI IR G

110’

ST

110’



200’

76’

110’

AND ST



76’

N HIGHL

N

’ ’



ST

U

H

1





N

’

’

’

WASHINGTON BLVD

D DR

110’ BL VD N O

10TH RD N

W

ILS

110’

’

7’

N ST N HUDSO

DR

IVE

 60’

90’

June 18, 2015

110’

90’ 60’

CLARENDON WEST REDEVELOPMENT

110

7’

N IVY ST

7’

O WO

KIRK

red nity

’

7’

10TH RD

110’

N



A-07 BUILDING HEIGHT MAP & SITE PLAN

’

110

LEGEND N. JOHNSON STREET

T

H 3T

E RE

ST

EXISTING ZONE BOUNDARY EXISITING PROPERTY BOUNDARY

1

T

EE

5’

N VI

- DEDICATION OF OPEN SPACE FOR FUTURE PARK

G



ET RE ST

5 +6

5’

+7

BLDG. 1

- NEW IVY STREET PEDESTRIAN PATH

IR

+5

SITE BENEFITS: N.

16

TH

12

5’

R ST

- RECONFIGURED N. JOHNSON STREET

5’

+8

- NEW 12TH STREET - PRESERVATION OF AT-RISK WINDOWS ON ADJACENT BUILDING

55’

75’

103’

- POTENTIAL CONSOLIDATED OPEN SPACE

WASHINGTON BL

VD.

+115’

+105’

+95’

+85’

+75’

+55’

75’

+65’

165’

PROPOSED ROAD ALIGNMENT

90’

DENSITY:

60’

- PROPOSED: 239,544 SF CLARENDON WEST REDEVELOPMENT June 18, 2015

A-8 PROPOSED SCHEME - BUILDING TAPER DIAGRAM SCALE: 1”=80’

LEGEND PROPERTY BOUNDARY BUILDING TAPER

+55’

+103’

+65’

+75’

+85’

+95’

+105’

+115’

30’ TYPICAL

+75’ +55’

PROPOSED BUILDING FUTURE PARK

13th STREET

165’

CLARENDON WEST REDEVELOPMENT June 18, 2015

EXISTING BUILDING 12th STREET

BUILDING TAPERS AT A 1:3 RATIO BEYOND 165’

A-9 BUILDING TAPER DIAGRAM - WASHINGTON BLVD. SECTION SCALE: 1”=40’

+/-125’

+/-55’

55’

+/-22’-33’

ET RE ST

KS

C N

13

O

TH

.

JA

110’

LVD

.

LVD

N.

55’

NB DO REN CLA

80’

NB SO WIL

110’

ST ET

RE

103’

75’

N.

55’

N

SO

HN

JO EE

STR

D.

LV NB

T

TO

G HIN

S

WA

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-10 BUILDING TAPER DIAGRAM

13TH STREET

WASHINGTON BLVD.

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-11 PERSPECTIVE - WASHINGTON BLVD.

LEGEND

N. JOHNSON STREET

T

H 3T

E RE

ST

EXISTING ZONE BOUNDARY EXISITING PROPERTY BOUNDARY

1

T

EE

TH

12

R ST

SITE BENEFITS: - NEW IVY STREET PEDESTRIAN PATH

I N.

- NEW 12TH STREET

I RV

16

- PRESERVATION OF AT-RISK WINDOWS ON ADJACENT BUILDING

NG

5’

T

E RE

ST

BLDG. 1

55’

WASHINGTON BLVD

.



165

75’

65’

SECTOR PLAN ROAD ALIGNMENT 75’ +55’

DENSITY:

+65’ +75’ +85’

- PROPOSED: 239,544 SF 90’

+95’ 60’

- LESS PARCEL DENSITY: (26,764 SF) - TOTAL: 212,780 SF

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-12 OPTION A - BUILDING TAPER DIAGRAM SCALE: 1”=80’

LEGEND EXISTING PROPERTY BOUNDARY BUILDING TAPER

+55’

+65’

+75’

+85’

+95’

+105’

30’ TYPICAL

+65’ +55’ PROPERTY BOUNDARY IN R-ZONE BEYOND

PROPOSED BUILDING

13th STREET

EXISTING BUILDING 12th STREET

165’

CLARENDON WEST REDEVELOPMENT June 18, 2015

BUILDING TAPERS AT A 1:3 RATIO BEYOND 165’

A-13 OPTION A - BUILDING TAPER ALONG WASHINGTON BLVD. SCALE: 1”=40’

55’

13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

65’

ING

H WAS

VD.

BL TON

A-14 OPTION A - PERSPECTIVE FROM WASHINGTON BLVD.

TH

13

ET

S

E TR

SITE BENEFITS: N. G

N VI

0’

1 +1

IR

1

ER

H 2T

ST

RE

ET

EXISTING ZONE BOUNDARY BUILDING HEIGHT ZONE



5 +5

P TA

N. JOHNSON STREET

LEGEND

- NEW IVY STREET PEDESTRIAN PATH (COVERED)

ET RE ST

- DEDICATION OF OPEN SPACE FOR FUTURE PARK - RECONFIGURED N. JOHNSON STREET

BLDG. 1

- NEW 12TH STREET (COVERED)

TAPER

.

19’-6”

105’

+110’

WASHINGTON BLVD

85’

+55’

55’

75’ +75’

SECTOR PLAN ROAD ALIGNMENT

TAP

75’

ER

+75’

75’

75’

DENSITY: - PROPOSED: 239,544 SF

+90’

90’

90’ +90’

60’

- PLUS DENSITY PER SECTOR PLAN: 16,000 SF - TOTAL = 255,544 SF SF

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-15 OPTION B - BUILDING TAPER DIAGRAM SCALE: 1”=80’

LEGEND BUILDING HEIGHT ZONE BUILDING TAPER

55’

TAPER

110’

+110’ +105’ +85’

+55’

PROPOSED BUILDING FUTURE PARK

13th STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

13TH STREET

EXISTING BUILDING 12TH12th STREET STREET

A-16 OPTION B - BUILDING TAPER ALONG WASHINGTON BLVD.

SCALE: 1”=40’

105’

85’ 55’

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-17 OPTION B - PERSPECTIVE FROM WASHINGTON BLVD.

55’

CLARENDON WEST REDEVELOPMENT June 18, 2015

85’

105’

A-18 OPTION B - PERSPECTIVE FROM WASHINGTON BLVD.

LEGEND PEDESTRIAN ACCESS VEHICULAR ACCESS NEW PEDESTRIAN PATH STOOP

13TH

ET

STRE

A-16

SERVICE

PARKING

MAIN RESIDENTIAL ENTRY

12TH STREET

SERVICE AT LEVEL 2

MAIN RESIDENTIAL ENTRY

N. HUDSON STREET

EXISTING BLDG

N. IRVING STREET

A-17

EXISTING BLDG MAIN RESIDENTIAL ENTRY

W

AS

HI

RETAIL ENTRY

NG

TO

N

BL

SERVICE

VD

.

ALLEY

June 18, 2015

N

EXISTING BLDG

CLARENDON WEST REDEVELOPMENT

PARKING

A-19 SITE PLAN

BUILDING 1- ROOFTOP AMENITIES:

BUILDING 3- ROOFTOP AMENITIES:

- GRILLS - POOL WITH SUNSHELF - POOL DECK / ROOF TERRACE - FIRE PITS - ARBOR - SEATING AREAS

- GRILLS - FIRE PITS - SEATING AREAS - ROOF TERRACE T

STREE

13TH

55’

EXISTING BLDG

55’

12TH STREET

N. IRVING STREET

75’

103’

N. HUDSON STREET

55’

80’

W

AS

HI

EXISTING BLDG

NG

TO

N

BL

VD

.

110’

ALLEY

N

EXISTING BLDG

CLARENDON WEST REDEVELOPMENT June 18, 2015

BUILDING 2- ROOFTOP AMENITIES: - GRILLS - POOL WITH SUNSHELF - POOL DECK / ROOF TERRACE - FIRE PITS - SEATING AREAS

A-20 ROOF PLAN- BUILDINGS 1, 2 & 3

13TH STREET

18’-0”

PEDESTRIAN PATH

PARKING RAMP BELOW

12TH STREET

42’-2”

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-021 ENLARGED PLAN AT PEDESTRIAN PATH

1 2

T H

S T R E E T

N O R T H

N .

H U D S O N

S T R E E T

2

I R V I N G

S T R E E T

B U I L D I N G

B U I L D I N G CLARENDON WEST REDEVELOPMENT June 18, 2015

3 A-023 LANDSCAPE CONCEPT

C L A R E N D O N RESIDENTIAL

CLARENDON WEST REDEVELOPMENT June 18, 2015

W E S T

REDEVELOPMENT

BUILDING 1 COURTYARD PLAN

ParkerRodriguez, Inc.

PLANNING | URBAN DESIGN | LANDSCAPE ARCHITECTURE

A-024 LANDSCAPE CONCEPT

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-25 BUILDING 1 PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-26 BUILDING 1 PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-27 BUILDING 1 PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 12TH STREET

BUILDING EXTERIOR MATERIALS: METAL PANEL 2 PROFILED METAL PANEL

A-30 380.33’

A-30

METAL PANEL 1 GRAY

BRICK MASONRY 1

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

13TH STREET WASHINGTON BLVD. ELEVATION

CLARENDON WEST REDEVELOPMENT June 18, 2015

LOBBY

FCC

LEASING

12TH STREET

A-30

A-28 BUILDING 1 - ELEVATION SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: A-30

METAL PANEL 3 PROFILED METAL PANEL

380.33’

METAL PANEL 2 PROFILED METAL PANEL

METAL TRELLIS POOL / ROOF TERRACE

METAL PANEL 1 GRAY

BRICK MASONRY 1

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

WASHINGTON BLVD.

LOADING

GARAGE ENTRY

13TH STREET

12TH STREET ELEVATION

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-29 BUILDING 1 - ELEVATION SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: BRICK MASONRY 1

BRICK MASONRY 1

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

METAL PANEL 1

METAL PANEL 1

GRAY

GRAY

TYPICAL MASONRY OPENING ALONG 12TH STREET

METAL BALCONY RAILING SYSTEM WITH MESH INFILL PANEL, TYP.

TYPICAL BAY ALONG WASHINGTON BLVD.

METAL CANOPY BRICK MASONRY 1

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

TRANSLUSCENT GLAZING ALUM./GLASS STOREFRONT SYSTEM METAL PANEL 1

METAL PANEL 1

GRAY

GRAY

TYPICAL STOREFRONT AT MAIN ENTRANCE (WASHINGTON BLVD.) TYPICAL MASONRY OPENING

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-30 BUILDING 1 - ENLARGED ELEVATION SCALE: 1”=10’

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-31 BUILDING 1 PERSPECTIVE - LOOKING FROM 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-32 BUILDING 1 PERSPECTIVE - LOOKING FROM 13TH STREET

BUILDING EXTERIOR MATERIALS: BRICK MASONRY 2

METAL PANEL 2

BLEND: - 1-19 - 1-20 - PEARL GRAY VL

PROFILED METAL PANEL

BRICK MASONRY 1

BLEND: - MED. SMK. BRONZE SM. - MAROON SM. - DK. I.S. SM.

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

METAL PANEL 3 PROFILED METAL PANEL

380.33’

METAL PANEL 1 GRAY

A-34

PEDESTRIAN PATH

UNIT ENTRY, TYP.

WASHINGTON BLVD.

13TH STREET ELEVATION A-34

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-33 BUILDING 1 - ELEVATION SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: BRICK MASONRY 2

COMPOSITE WOOD PANEL RAILING

BLEND: - 1-19 - 1-20 - PEARL GRAY VL

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

METAL PANEL 1 GRAY

METAL BALCONY RAILING SYSTEM WITH MESH INFILL PANEL AND WOOD TOP RAIL, TYP.

TYPICAL MASONRY OPENING

BRICK MASONRY 2

PRECAST CONCRETE

BLEND: - 1-19 - 1-20 - PEARL GRAY VL

HONED VARYING REVEAL PATTERNS

COMPOSITE WOOD PANEL

METAL PANEL 1 GRAY

TYPICAL GROUND FLOOR UNIT

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-34 BUILDING 1 - ENLARGED ELEVATION SCALE: 1”=10’

13TH STREET PERSPECTIVE

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-35 BUILDING 2 & 3 - PERSPECTIVE ALONG13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-36 BUILDING 2 & 3 PERSPECTIVE - LOOKING FROM 13TH STREET & N. IRVING STREET

THE HUDSON

N. HUDSON STREET

BLDG. 3

61’-9”

N. IRVING STREET

62’-11”

64’-0”

65’-1”

61’-9”

64’-3”

THE BEACON

BLDG. 1

WASHINGTON BLVD.

13TH STREET SITE SECTION

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-37 SITE SECTION

SCALE: 1”=70’

62’-11”

61’-9”

64’-0”

65’-1”

61’-9”

64’-3”

13TH STREET SITE SECTION

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-38 ENLARGED SITE SECTION SCALE: 1”=35’

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-39

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-40 BUILDING 2 - PERSPECTIVE ALONG 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-41 BUILDING 2 - PERSPECTIVE ALONG N. HUDSON STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-42 BUILDING 2 PERSPECTIVE - LOOKING FROM WILSON BLVD. & N. HUDSON STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-43 BUILDING 2 PERSPECTIVE - LOOKING FROM WILSON BLVD. & N. HUDSON STREET

108’-8”

BLDG. 3

83’-6”

62’-1”

65’-1” 13TH STREET

POTENTIAL 76’ BLDG. PER SECTOR PLAN

12TH STREET

BLDG. 2

ALLEY

WILSON BLVD.

SITE SECTION ALONG N. IRVING STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-44 SITE SECTION

SCALE: 1”=40’

ALLEY

BLDG. 2

12TH STREET

59’-6”

82’-8” WILSON BLVD.

59’-4”

111’-1”

POTENTIAL 76’ BLDG. PER SECTOR PLAN

BLDG. 3

13TH STREET

SITE SECTION ALONG N. HUDSON STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-45 SITE SECTION

SCALE: 1”=40’

BUILDING EXTERIOR MATERIALS:

A-50

METAL PANEL 2 PROFILED METAL PANEL 390.39’

METAL PANEL 1 GRAY

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

BRICK MASONRY 4 BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

N. HUDSON STREET ALUM./GLASS STOREFRONT SYSTEM

CLARENDON WEST REDEVELOPMENT June 18, 2015

ENTRY

N. IRVING STREET

12TH STREET ELEVATION

SCALE: 1”=25’

A-46 BUILDING 2 - ELEVATION

BUILDING EXTERIOR MATERIALS:

A-50

METAL PANEL 2 PROFILED METAL PANEL 390.39’

METAL PANEL 1 GRAY

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

BRICK MASONRY 4 BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

RETAIL

12TH STREET

ALLEY ALUM./GLASS STOREFRONT SYSTEM

N. IRVING STREET ELEVATION

A-50

CLARENDON WEST REDEVELOPMENT June 18, 2015

METAL OVERHANG

SCALE: 1”=25’

A-47 BUILDING 2 - ELEVATION

BUILDING EXTERIOR MATERIALS:

A-50

METAL PANEL 2 PROFILED METAL PANEL 390.39’

POOL / ROOF TERRACE

METAL PANEL 1 GRAY

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

BRICK MASONRY 4 BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

ALUM./GLASS STOREFRONT SYSTEM

ALLEY

LEASING

LOBBY

12TH STREET

N. HUDSON STREET ELEVATION

A-50

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-48 BUILDING 2 - ELEVATION SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: METAL PANEL 4

METAL PANEL 3

PERFORATED METAL SCREEN WALL SYSTEM

PROFILED METAL PANEL

METAL PANEL 2 PROFILED METAL PANEL

POOL / ROOF TERRACE

390.39’

METAL PANEL 1 GRAY

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

BRICK MASONRY 4 BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

ALUM./GLASS STOREFRONT SYSTEM

METAL OVERHANG

N. IRVING STREET

LOADING

TRANSFORMER SCREEN WALL

GARAGE ENTRY

N. HUDSON STREET

ELEVATION AT ALLEY

A-50

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-49 BUILDING 2 - ELEVATION

SCALE: 1”=25’

BRICK MASONRY 3

METAL PANEL 4

METAL PANEL 1

METAL PANEL 3

GRAY

PROFILED METAL PANEL

MANGANESE I.S. SM. NORMAN SIZE

PERFORATED METAL SCREEN WALL SYSTEM

COURTYARD & TRANSFORMER SCREEN WALL

METAL BALCONY RAILING SYSTEM WITH MESH INFILL PANEL, TYP.

TYPICAL MASONRY OPENING

BRICK MASONRY 4

BRICK MASONRY 4

METAL PANEL 1

BRICK MASONRY 3

BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

BLEND: - PEACH VL - LT. I.S. VL - SALMON SM. NORMAN SIZE STACKED BOND

MANGANESE I.S. SM. NORMAN SIZE

GRAY

TYPICAL GROUND FLOOR UNIT

METAL PANEL 1 GRAY

TYPICAL MASONRY OPENING

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-50 BUILDING 2 - ENLARGED ELEVATIONS SCALE: 1”=10’

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-51 BRICK MASONRY 3 PRECEDENT

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-52 BUILDING 2 & 3 PERSPECTIVE - LOOKING FROM 13TH STREET & N. IRVING STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-53 BUILDING 3 - PERSPECTIVE ALONG13TH STREET

BUILDING EXTERIOR MATERIALS: METAL PANEL 2

A-56

PROFILED METAL PANEL

A-56

METAL PANEL 1 GRAY

BRICK MASONRY 5 BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

COMPOSITE WOOD PANEL N. HUDSON STREET

UNIT ENTRY, TYP.

N. IRVING STREET

13TH STREET ELEVATION

METAL PANEL 2

335.33’

PROFILED METAL PANEL

METAL PANEL 1 GRAY

BRICK MASONRY 5 BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

N. IRVING STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

12TH STREET ELEVATION

COURTYARD / ENTRY A-56

A-56

LOBBY

N. HUDSON STREET

A-54 BUILDING 3 - ELEVATIONS SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: METAL PANEL 2

METAL PANEL 2

PROFILED METAL PANEL

PROFILED METAL PANEL

METAL PANEL 1

METAL PANEL 1

GRAY

GRAY

BRICK MASONRY 5

BRICK MASONRY 5

BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

335.33’

335.33’

ROOF TERRACE

12TH STREET

LOADING

N. HUDSON STREET ELEVATION

CLARENDON WEST REDEVELOPMENT June 18, 2015

13TH STREET

13TH STREET N. IRVING STREET ELEVATION

12TH STREET

A-55 BUILDING 3 - ELEVATIONS SCALE: 1”=25’

BUILDING EXTERIOR MATERIALS: BRICK MASONRY 5

BRICK MASONRY 5

METAL PANEL 1

METAL PANEL 1

GRAY

GRAY

BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

TYPICAL MASONRY OPENING

TYPICAL BAY METAL BALCONY RAILING SYSTEM WITH GLASS INFILL PANEL, TYP.

BRICK MASONRY 5 BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

BRICK MASONRY 5 BLEND: - PLUM SM. - MAROON VL - CAPITOL I.S. SM.

BRICK MASONRY 3 MANGANESE I.S. SM. NORMAN SIZE

COMPOSITE WOOD PANEL TYPICAL GROUND FLOOR UNIT ENTRANCE METAL PANEL 1 GRAY

CLARENDON WEST REDEVELOPMENT June 18, 2015

METAL CANOPY

ALUM./GLASS STOREFRONT SYSTEM

TYPICAL STOREFRONT AT MAIN ENTRANCE

A-56 BUILDING 3 - ENLARGED ELEVATIONS SCALE: 1”=10’

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-57 BUILDING 1 PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-58 BUILDING 1 ALTERNATE PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-59 BUILDING 1 PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-60 BUILDING 1 ALTERNATE PERSPECTIVE - LOOKING FROM WASHINGTON BLVD. & 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-61 BUILDING 1 PERSPECTIVE - LOOKING FROM 13TH STREET

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-62 BUILDING 1 ALTERNATE PERSPECTIVE - LOOKING FROM 13TH STREET

W A S H I N G T O N

C L A R E N D O N RESIDENTIAL

CLARENDON WEST REDEVELOPMENT June 18, 2015

W E S T

REDEVELOPMENT

B O U L E V A R D

1 3 TH+ W A S H I N G T O N B LV D. CORNER PLAN

ParkerRodriguez, Inc.

PLANNING | URBAN DESIGN | LANDSCAPE ARCHITECTURE

A-63 LANDSCAPE CONCEPT

N O R T H S T R E E T T H

1 2

C L A R E N D O N RESIDENTIAL

CLARENDON WEST REDEVELOPMENT June 18, 2015

W E S T

REDEVELOPMENT

ALLEY PLAN

ParkerRodriguez, Inc.

PLANNING | URBAN DESIGN | LANDSCAPE ARCHITECTURE

A-64 LANDSCAPE CONCEPT

MARCH / SEPTEMBER: 9AM

JUNE: 9AM

DECEMBER: 9AM

MARCH / SEPTEMBER: 12PM

JUNE: 12PM

DECEMBER: 12PM

MARCH / SEPTEMBER: 3PM

JUNE: 3PM

DECEMBER: 3PM

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-65 SHADOW STUDY

19' - 8"

CLOS BATH

BATH

CLOS

MECH

S.

LIVING/DINING

KITCHEN

W.I.C

W.I.C

8' - 8"

MECH

L.L.

L.L.

BEDROOM

BEDROOM

LIVING / DINING

13' - 2"

16' - 9 1/2"

18' - 2"

LIVING/DINING

W.I.C.

KITCHEN W/D

11' - 2"

29' - 0"

10' - 9"

L.L.

28' - 8"

SLEEPING AREA

24' - 4"

W/D

CLERESTORY

30' - 4"

11' - 9 1/2"

KITCHEN

CLOS W/D BATH MECH

TYP. FLOOR ONLY

11' - 10 1/2"

N

LEVEL 9 2

JUNIOR ONE BEDROOM

LEVEL 10 2

LEVEL 11 2

LEVEL 12 2

LEVEL 13 2

LEVEL 14 2

TOTAL UNITS 24

N

11' - 8 1/2"

BEDROOMS UNIT ID R-A05 AVE NSF 1 BR K STREETS NW, WASHINGTON R-B01a 689 BUSH CONSTRUCTION | 4th AND K STREETS NW | 4TH AND DCSF

LEVEL 1 0

LEVEL 2 0

LEVEL 3 8

ONE BEDROOM LEVEL 4 8

LEVEL 5 8

LEVEL 6 8

LEVEL 7 8

LEVEL 8 8

LEVEL 9 8

LEVEL 10 8

LEVEL 11 8

LEVEL 12 8

LEVEL 13 1

LEVEL 14 1

TOTAL UNITS 82

9' - 7"

SCALE: 1/4" = 1'-0" BEDROOMS UNIT ID AVE NSF R-B01a 703 SF 1 BR R-B03

LEVEL 1 0

LEVEL 2 0

ONE BEDROOM LEVEL 3 1

LEVEL 4 1

LEVEL 5 1

LEVEL 6 1

LEVEL 7 1

LEVEL 8 1

BATH

12' - 6"

12' - 0"

17' - 6 1/2"

TOTAL UNITS 11

SCALE: 1/4" = 1'-0"

R-B03

BEDROOM

LIVING/ DINING

LIVING/ DINING

30' - 10"

CLOS W.I.C.

BATH

DEN

KITCHEN

LEVEL 4 1

BATH

LEVEL 3 1

13' - 0"

BEDROOM

O

STOR

CLOS

W.I.C.

12' - 4"

MECH

CLOS

LEVEL 6 0

LEVEL 7 0

LEVEL 8 0

LEVEL 9 0

LEVEL 10 0

LEVEL 11 0

LEVEL 12 0

LEVEL 13 0

TOTAL UNITS 3

ONE BEDROOM + DEN

CLARENDON WEST REDEVELOPMENT June 18, 2015

PWDR R.

MECH SCALE: 1/4" = 1'-0"

1 BEDROOM W/ DEN

34' - 0" AVE NSF 1,093 SF

WA13037 | 05/08/15

LEVEL 1 0

LEVEL 2 0

LEVEL 3 0

LEVEL 4 0

LEVEL 5 0

TWO BEDROOM

LEVEL 6 0

LEVEL 7 0

LEVEL 8 0

LEVEL 9 0

LEVEL 10 0

LEVEL 11 0

LEVEL 12 0

LEVEL 13 1

TOTAL UNITS 1

SCALE: 1/4" = 1'-0"

2 BEDROOM

C-D07

BUSH CONSTRUCTION | 4th And K Street | 4th and K Streets NW, Washington DC

WA13037 | 05/08/15

W.I.C.

BEDROOM 11' - 0"

CLOS

N

C-C03

BUSH CONSTRUCTION | 4th And K Street | 4th and K Streets NW, Washington DC BEDROOMS UNIT ID 2 BR C-D07

WA13037 | 05/08/15

BATH

N

31' - 1"

LEVEL 5 0

BEDROOM

BATH

11' - 0"

W/D

11' - 8"

STOR

LEVEL 4 0

8' - 6"

35' - 1 1/2"

W/D

LIVING/DINING

18' - 7 1/2"

LEVEL 8 1

CLOS

H

LEVEL 7 1

W.I.C.

CLOS

LEVEL 3 0

LEVEL 14 0

KITCHEN

MECH

LEVEL 2 1

LEVEL 13 1

13' - 3"

11' - 0"

BEDROOM

11' - 10"

DEN

LEVEL 1 2

LEVEL 12 1

26' - 5"

W/D

AVE NSF 887 SF

LEVEL 11 1

PWDR R.

KITCHEN

UNIT ID C-C03

LEVEL 10 1

38' - 10"

P

BEDROOMS 1 BR-D

LEVEL 9 1

BUSH CONSTRUCTION | 4th AND K STREETS NW | 4TH AND K STREETS NW, WASHINGTON DC

30' - 4"

CLOS

N

BUSH CONSTRUCTION | 4th AND K STREETS NW | 4TH AND K STREETS NW, WASHINGTON DC WA13037 | 05/08/15

WA13037 | 05/08/15

8' - 0"

12' - 4" 24' - 4"

SCALE: 1/4" = 1'-0"

TOTAL UNITS 11

LEVEL 8 2

LEVEL 9 LEVEL 10 LEVEL 11 LEVEL 12 LEVEL 13 1 1 1 1 1

LEVEL 7 2

LEVEL 6 1

LEVEL 6 2

LEVEL 5 1

LEVEL 5 2

LEVEL 2 0

LEVEL 4 2

TWO BEDROOM + DEN

LEVEL 1 0

WA13037 | 05/08/15

LEVEL 3 2

BEDROOMS UNIT ID AVE NSF 2 BR-D C-E01 1,396 SF

LEVEL 2 0

35' - 10"

LEVEL 1 0

10' - 0"

AVE NSF 591 SF

12' - 0"

ANSI

14' - 1"

UNIT ID R-A05

10' - 10" 23' - 0"

N

SCALE: 1/4"

2 BEDROOM W/ DEN

C

BUSH CONSTRUCTION | 4th And K Street | 4th and K Streets NW, Washingt

A-66 TYPICAL UNIT PLANS

LEED 2009 for New Construction and Major Renovations

Red Top Development Dec 11, 2014

Project Checklist 23 2 Y

?

1

Y 1 5

Credit 1 Credit 2 Credit 3

6 1 3 2

Credit 4.1 Credit 4.2 Credit 4.3 Credit 4.4

1

Credit 5.1

1 1 1 1 1

Credit 5.2 Credit 6.1 Credit 6.2 Credit 7.1 Credit 7.2

1 1

2

Y 4

9 Y Y Y 4

1

Credit 2 Credit 3

2 22

Prereq 2 Prereq 3 Credit 1 Credit 2 Credit 3

2 1 2

Credit 4 Credit 5 Credit 6

8

Y

Prereq 1

3 1 2

Credit 1.1 Credit 1.2 Credit 2

2

Credit 3

2 to 4 2 2 to 4

Possible Points: 35

Fundamental Commissioning of Building Energy Systems Minimum Energy Performance Fundamental Refrigerant Management Optimize Energy Performance On-Site Renewable Energy Enhanced Commissioning Enhanced Refrigerant Management Measurement and Verification Green Power

Materials and Resources

1 5 1 6 1 3 2 1 1 1 1 1 1 1

Possible Points: 10

Water Use Reduction—20% Reduction Water Efficient Landscaping Innovative Wastewater Technologies Water Use Reduction

Energy and Atmosphere Prereq 1

2 13 7

Construction Activity Pollution Prevention Site Selection Development Density and Community Connectivity Brownfield Redevelopment Alternative Transportation—Public Transportation Access Alternative Transportation—Bicycle Storage and Changing Rooms Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles Alternative Transportation—Parking Capacity Site Development—Protect or Restore Habitat Site Development—Maximize Open Space Stormwater Design—Quantity Control Stormwater Design—Quality Control Heat Island Effect—Non-roof Heat Island Effect—Roof Light Pollution Reduction

Water Efficiency Credit 1

2

6

Credit 8

Prereq 1

2 3

Materials and Resources, Continued

Possible Points: 26 Y

Prereq 1

1

7

Sustainable Sites

N

Possible Points: 14

Storage and Collection of Recyclables Building Reuse—Maintain Existing Walls, Floors, and Roof Building Reuse—Maintain 50% of Interior Non-Structural Elements Construction Waste Management Materials Reuse

N

2 2

9

Credit 4 Credit 5

2

Credit 6

4

Indoor Environmental Quality Prereq 2

1

Credit 1 Credit 2 Credit 3.1

1 1 1 1

Credit 3.2 Credit 4.1 Credit 4.2 Credit 4.3

1

Credit 4.4

1 1 1 1

Credit 5 Credit 6.1 Credit 6.2 Credit 7.1

1 1 1

Credit 7.2 Credit 8.1 Credit 8.2

1

1 1 1 1

Credit 1.2 Credit 1.3 Credit 1.4

1 1

Credit 1.5 Credit 2

1

Credit 1.1 Credit 1.2

Credit 1.4

CLARENDON WEST REDEVELOPMENT June 18, 2015

1 1 1 1 1 1

Possible Points: 4

Regional Priority: SSc5.1 Regional Priority: SSc6.1 Regional Priority: Specific Credit Regional Priority: Specific Credit

Total Certified 40 to 49 points

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Possible Points: 6

Innovation in Design: Public Transportation Access Innovation in Design: Heat Island Effect, Non-roof Innovation in Design: Appliance Water Reduction Innovation in Design: Education Program Innovation in Design: Electric Vehicle Charging LEED Accredited Professional

Regional Priority Credits

9 37

Possible Points: 15

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control Outdoor Air Delivery Monitoring Increased Ventilation Construction IAQ Management Plan—During Construction Construction IAQ Management Plan—Before Occupancy Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings Low-Emitting Materials—Flooring Systems Low-Emitting Materials—Composite Wood and Agrifiber Products Indoor Chemical and Pollutant Source Control Controllability of Systems—Lighting Controllability of Systems—Thermal Comfort Thermal Comfort—Design Thermal Comfort—Verification Daylight and Views—Daylight Daylight and Views—Views

1

Credit 1.3

60

1 to 2 1 to 2 1 1

Innovation and Design Process Credit 1.1

1 1 to 3 1 1 to 2 1 to 2

Credit 7

Prereq 1

1 1

1

Recycled Content Regional Materials Rapidly Renewable Materials Certified Wood

1 1

Y Y

5

1 to 19 1 to 7 2 2 3 2

?

1 1 1 1

Possible Points: 110 Silver 50 to 59 points

Gold 60 to 79 points

Platinum 80 to 110

A-67 LEED SCORECARD

THANK YOU.

CLARENDON WEST REDEVELOPMENT June 18, 2015

A-68