COLOR POP CHEVRON BLANKET | Knit AWS

Report 4 Downloads 121 Views
COLOR POP CHEVRON BLANKET | Knit

INSTRUCTIONS Stripe Pat A With A: 12 rows. With C: 24 rows. With A: 24 rows. With D: 24 rows. With A: 72 rows. With C: 24 rows. With A: 24 rows. With D: 24 rows. With A: 12 rows. These 240 rows form Stripe Pat A. Stripe Pat B With B: 12 rows. With C: 24 rows. With B: 24 rows. With D: 24 rows. With B: 72 rows. MEASUREMENTS

With C: 24 rows.

Approx 48" x 42" [122 x 106.5 cm]. MATERIALS Bernat® Super Value™ (197 g/7 oz; 389 m/426 yds) Contrast A Winter White (07407) Contrast B Clay (53041)

3 balls 2 balls

ABBREVIATIONS www.bernat.com/abbreviations Approx = Approximately Beg = Beginning Cont = Continue(ity) Dec = Decrease(ing) K = Knit K2tog = Knit next 2 stitches together M1 = Make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop.

Contrast C Glowing Gold (53607) 1 ball Contrast D Aqua (53201)

1 ball

Size 5 mm (U.S. 8) knitting needles or size needed to obtain gauge. GAUGE 18 sts and 24 rows = 4" [10 cm].

P.O. Box 40, Listowel ON N4W 3H3 “home style… life style… your style.”

With B: 24 rows. With D: 24 rows. With A: 12 rows. These 240 rows form Stripe Pat B. Panel A (make 1) With A, cast on 40 sts. Knit 7 rows (garter st), noting first row is WS and inc 2 sts evenly across last row. 42 sts. Proceed in Stripe Pat A as follows: 1st row: (RS). With A, K1. M1. Knit to last 8 sts.

Pat = Pattern Rep = Repeat RS = Right side Ssk = Slip next 2 stitches knitwise one at a time. Pass them back onto left-hand needle, then knit through back loops together. St(s) = Stitch(es) Tog = Together WS = Wrong side

www.bernat.com

K2tog. K6. 2nd row: K6. Purl to end of row. Last 2 rows form pat. First 2 rows of Stripe Pat A are complete. Cont in pat as established until 240 rows of Stripe Pat A have been completed, dec 2 sts evenly across last row of last rep. 40 sts. Knit 7 rows (garter st). Cast off (WS).

COLOR POP CHEVRON BLANKET

1 of 2

COLOR POP CHEVRON BLANKET | Knit Panel B (make 2)

Cont in pat as established until 240 rows of

With A, cast on 34 sts.

Stripe Pat B have been completed, dec 2 sts

Knit 7 rows (garter st), noting first row is WS

evenly across last row of last rep. 40 sts.

and inc 2 sts evenly across last row. 36 sts.

Knit 7 rows (garter st). Cast off (WS).

Proceed in Stripe Pat A as follows: 1st row: (RS). With A, K1. M1. Knit to last 3 sts.

Finishing

K2tog. K1.

Sew Panels tog (matching stripes) in the

2nd row: Purl.

following sequence: A, C, B, C, B, D.

Last 2 rows form pat. First 2 rows of Stripe Pat A are complete. Cont in pat as established until 240 rows of Stripe Pat A have been completed, dec 2 sts evenly across last row of last rep. 34 sts. Knit 7 rows (garter st). Cast off (WS). Panel C (make 2) With B, cast on 34 sts. Knit 7 rows (garter st) noting first row is WS, inc 2 sts evenly across last row. 36 sts. Proceed in Stripe Pat B as follows: 1st row: (RS). With B, K1. ssk. Knit to last st. M1. K1. 2nd row: Purl. Last 2 rows form pat. First 2 rows of Stripe Pat B are complete. Cont in pat as established until 156 rows of Stripe Pat B have been completed twice, dec 2 sts evenly across last row of last rep. 34 sts. Knit 7 rows (garter st). Cast off (WS). Panel D (make 1) With B, cast on 40 sts. Knit 7 rows (garter st) noting first row is WS, inc 2 sts evenly across last row. 42 sts. Proceed in Stripe Pat B as follows:

A

C

B

C

B

D

1st row: (RS). With B, K6. ssk. Knit to last st. M1. K1. 2nd row: Purl to last 6 sts. K6. Last 2 rows form pat. First 2 rows of Stripe Pat B are complete.

P.O. Box 40, Listowel ON N4W 3H3 “home style… life style… your style.”

www.bernat.com

COLOR POP CHEVRON BLANKET

2 of 2