A6 J6 A1

Report 2 Downloads 24 Views
1

2

3

4

5

6

7

8

9

10

11

12

13

10 11 00.A02

Storage 105

16

17

SHEET KEYNOTE LEGEND

Collaboration 103

12' MB MTD 2'-6" AFF

06 10 00.A19 06 40 23.A05 06 40 23.A16 06 40 23.A19 09 65 13.A01 09 77 23.A01 10 11 00.A02

12' MB MTD 2'-6" AFF

4'x4' WP2 - MTD 2'-6" AFF C1; MITERED INSTALL. METHOD RUNNING N/S

C1; MITERED INSTALL. METHOD RUNNING E/W

15

10 11 00.A02

Collaboration 104

R

14

C1; MITERED INSTALL. METHOD RUNNING N/S

R

PLYWOOD BLOCKING AND BACKING PANELS FLUSH WOOD PANELING PLASTIC LAMINATE CABINETS - CUSTOM SOLID SURFACE COUNTERTOPS RESILIENT BASE FABRIC-WRAPPED PANELS MARKERBOARDS

Q

Q

EXTENTS OF RT ALIGN W/ COLLUMNS

P

P 09 77 23.A01 (3) 4' x 7'-2" PANELS MOUNTED 4" AFF WP2

10 11 00.A02 8' MB MTD 2'-6" AFF

Meeting 102

A15 G001

RT1-4; MITERED INSTALLATION METHOD RUNNING E/W

09 77 23.A01 (3) 4' x 7'-2" PANELS MOUNTED 4" AFF WP2

Consultant # 1

C1; MITERED INSTALLATION METHOD RUNNING E/W

32' - 2"

N

Hollis + Miller Architects Kansas State Certificate of Authority Architecture # A-198 Structure # E-1334

Lounge 101

Olsson Associates Civil & Mechanical / Electrical Engineers State Certificate of Authority # 1251 NW Briarcliff Parkway, Suite 50 816.361.1177 phone 816.361.1888 fax

C1; MITERED INSTALLATION METHOD RUNNING N/S

Media Center 100

N

RELOCATE QUILT TO THIS LOCATION

M

M 33' - 1 3/4" 10' - 0"

EXTENTS OF RT ALIGN W/ COLLUMNS

L

L

4' - 2"

C1; RANDOM INSTALLATION METHOD RUNNING E/W UP

J Scale

J6

1/8" = 1'-0"

21"

H

Finish Floor Plan - Media Center

Collaboration 104

Storage 105

A601 PL1 - SHELVES TO BE SELF EDGED

1C

BELOW

BELOW

1C

1C

ALIGN WITH EXISTING OPENING 1C

H9

9 1/8"

06 40 23.A16

G

P14

1A

Collaboration 103

A600

ALIGN WITH EXISTING OPENING

105

B

103

SHELVING HEIGHT VARIES - RE: INT. ELEV.

A 1C

1C

BELOW

9 1/8"

BELOW

1C

D1

1B

A600

G001

E13

Lounge 101

29"

D1

L1

1C

Media Center 100

J

H

REVISIONS: #

2' - 9 3/4"

G001

06 40 23.A19 SS1

G

F

Description

Date

E

Meeting 102

B

1

1B A13

1A

7' - 1"

6' - 0"

ALIGN NEW WALL WITH EXISTING

06 10 00.A19 3/4"

D

A601

A15

1B

E

H1 A1

1B

06 40 23.A05 WD1 ADHERED TO 3/4" PARTICLE BD

A601

6' - 0"

P8

F

CONST R DOCUM UCTION ENTS

18"

K

7401 Johnson Drive Overland Park, KS 66202

C1; RANDOM INSTALLATION METHOD RUNNING E/W

Shawnee Mission School District

5' - 8"

K

Shawnee Mission North High Media Center Renovation

C1; RANDOM INSTALLATION METHOD RUNNING E/W

D

A600

4"

102

1A

3/4" PARTICLE BD W/ 5/8" GYP

P11 A601

C

C 34"

06 40 23.A16 PL1

UP The Professional Architects seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plan, drawings, or documents not exhibiting this seal.

09 65 13.A01 RB1

B

JOB NO: 16018

B

DRAWN BY: JS CHECKED BY:

JD

DATE: 03-14-16

Level 1 100' - 0"

A101

24"

3/14/2016 9:53:18 AM

A Scale

A1

Casework Detail - Coffe Bar Counter and Shelving

A6

1 1/2" = 1'-0"

1

2

3

4

Scale

5

Floor Plan - Media Center OF

1/8" = 1'-0"

6

7

8

9

10

11

12

13

14

15

16

17

FLOOR PLANS Please consider the environment before printing this.

A