Advanced Biofuels in Sweden

Report 7 Downloads 109 Views
Advanced Biofuels in Sweden Klas Engvall, Chemical Technology [email protected]

Biogas from Biomass 20-21 January 2010

│Outline

R&D Universities/Institutes in Sweden • Demonstration Projects • National Centre for Gasification - NCG •

│R&D Universities/Institutes in Sweden

Luleå Piteå

Umeå Härnösand

Stockholm

Göteborg Växjö

│KTH – Chemical Technology • Long experience of R&D within gasification. Activities started in the 1970s. Technologies at KTH • 15 kW pressurised (30 bar) steam/oxygen & air FB gasifier with secondary reactor • 20 kW air-blown FB gasifier • 5 kW airblown & steam/oxygen FB gasifier • Test rigs for catalytic deactivation and particle separation concepts • Tar analysis equipment • On-line alkali analyses • …

│R&D Activities - Chemical Technology Tar cracking Tar analysis

Steam reforming

Upgrading to vehicle bio-fuels

Gasification

WGS

│Pressurised fluidised bed reactor - LDU

• EU project within the 6th framwork coordinated by Linné University (former Växjö University). • Production of a hydrogen-rich synthesis gas from biomass. Production of vehicle fuel not included. • Research program • Experiments in 18 MW PCFB in Värnamo • Experiments in LDU at KTH • High T filtration / cleaning • Catalytic steam reforming • Water gas shift • •

• Process studies 15 kW pressurised (30 bar) bubbling oxygen/steam fluidised bed • Project period: 2004-2009 gasifier Secondary reformer reactor 30 bar, 1000 ºC

│Other test facilities Atmospheric bubbling bed reactors 5 kW

20 kW

Biomass feeder

Nitrogen

M

Water to drop tube cooling Product gas External heating

= Mass flow controller

Ceramic filter

Nitrogen

M Air Steam Biomass feeder

Gas pre-heater Water to feeder cooling

│LTU/ETC R&D activities • Black liquor gasification • CFD modelling • Atomisation • Borate autocausticization • Biomass gasification • Combined heat and power production • Synthetic fuels production

Technologies • DP1 Entrained Flow Gasifier • 3 MW thermal power (20 ton BL/day) • 30 bar, 1000 ºC • Accumulated run time August 2009 > 10 000 hours • Fixed bed gasifier • 1 MW air-blown cyclone gasifier • Test-rigs for catalyst with synthesis gas • …

Source: ETC

│Black liquor gasification • Joint research program with technology owner BLACK LIQUOR (Chemrec) • Research OXYGEN AND ATOMIZING MEDIA

SULFUR REMOVAL

COOLIN program (BLG II) with four work packages G

• Experiments in DP-1

GAS COOLER

• Applied process chemistry

WHITE LIQUO

REACTOR

• Mill integration • Process

RAW modellingGAS

• Long term testing of process QUENCH • Process development and optimisation • Overall budget 2001 – 2010 is app. 215 MSEK GREEN LIQUOR

• Next step: scale up to industrial size WEAK WASH

CLEAN, COOL SYNTHESIS GAS

CONDENSATE

Source: Chemrec



Entrained flow gasification of forest industry by-products System: WP-7

BIO-FUEL PREPARATION

Biomass powder

WP-1 HOPPER1

CO2

HOPPER2

CO2

CO2

WP-2 carried out together with IVAB, Sveaskog, • Research O Smurfit Kappa and LTU 2

GASCLEANINGAND CONDITIONING • Concept verification and WP-6 process research Control: WP-3 EACTOR • ~1R~1200ƒC MW pilot will be commissioned in 2010 GASIFIER

• WP-5 Overall budget 2009 – 2011 is app. 24 MSEK WP-4 COUNTER QUENCH

Product gas

GUARD BED

CURRENT CONDENSOR METHANOL CONVERSION

Ash/water slurry

Condensate

Steam

MeOH

Source: ETC

│Demonstration Projects in Sweden Luleå Piteå Umeå Örnsköldsvik Härnösand

Västerås

Mälarenergi

Stockholm

Domsj ö

Göteborg Värnamo Växjö

GoBiGa s

VVBG C

Other projects • Cortus • Sundsvall • VIPP, Piteå • …

│VVBGC - Värnamo Växjö Värnamo Biomass Gasification Center •



A 18 MW pressurised CFB gasifier demonstration plant for gasification of biomass 4 tonne / hour dry biomass feed

New project • Project planning for a demonstration project • Hydrogen-rich gas • Methane-rich gas • Total cost: 450 MSEK (45 M€) • Duration: 4 years, starting 2010? Decision?

│CHRISGAS and New Project Outline of Work New Project Duration 4 years Budget 45 Million Euro Conceptual Design Completed Nov 2005

Basic Engineering

Detailed Engineering/ Procurement

Tentative 2013

Rebuild

Completed May 2006

Tentative 2010

2

Status Review (SR) Completed Oct 2005

Measures after SR Completed Oct 2006

Startup Tentative 2012

Operation

3000 h

Test Run Prior to rebuild Completed Dec 2007

Source: VVBGC

│VVBGC Flow scheme after Rebuilding

Source: VVBGC

│VVBGC Possible utilisation of Syngas Possibility to install a complete GTL facility

CHRISGAS

PHASE II Automotive fuels Stakeholder driven

Hot Gas Cleaning

DME, methanol, FT, hydrogen etc.

Source: VVBGC

│Mälarenergi - Västerås



Plan to build 2 x 100 MW atmospheric CFB gasifers using waste for co-combustion in a fossil fuelled boiler



Project cost: ~3 billion SEK (300 M €)



Preliminary production start: 2012 (Decision: February?)



Slipstream for R&D and demonstration: • Gas cleaning • Methane separation • Condition and upgrading of synthesis gas • Long term aim flexible energy production – electricity, district heat and methane

│Mälarenergi - 2 x 100 MW Air pre-heater

600°C 850°C

350°C

400°C

Source: Mälarenergi

Demonstration of an environmentally optimised bio-fuel for road transport covering the full chain from production of fuel from biomass to the utilisation in vehicles Starting date: 1 September 2008 Duration: 48 months

Total budget: 28.4 M€ EU funding: 8.2 M€ Energimyndigheten: 9.6 M€

Source: ETC

3rd generation DME Process Deep desulphurisation of raw synthesis gas

MP steam Synthesis gas from gasifier

First single-pass MeOH synthesis featuring high space-time yield

Feed preparatio n

CONRAD MeOH synthesis

Gases

MeOH synthesi s

MeOH

Gases

CW

CW DME

DME synthesi s

CW Raw MeOH

Steam Steam

Water

Steam

Flexible distillation producing methanol or DME according to day-to-day needs

Source: ETC

│Domsjö & Chemrec •

The project concerns the production of biofuels from black liquor in an establishment in Domsjö, Örnsköldsvik. Main driving force is next generation biofuels for vehicles



Awarded aid: up to 500 MSEK (50 M€) DP2 Chemrec

Location: Örnsköldsvik, Sweden Products: DME & methanol Capacity: 95 000 t DME or 132 000 t methanol/year Project cost: ~3 billion SEK (300 M €) Planned production start: H1 2013

Source: Chemrec

│Domsjö – Scheme Fuel Production

Source: Chemrec

National Centre for Gasification

NC

│National Centre for Gasification

N



Big investments for demonstration of gasification technologies are in progress/planned in Sweden



Main driving force is next generation biofuels for vehicles



Research – Development - Competence

DP2 Chemrec

GoBiGa s

Värnam o

Mälarenerg i

│Organisation - Plans SP Co-ordinator

N

Industrial projects

PhD programme

Direct Fluidised Bed Gasification

Indirect Fluidised Bed Gasification

Entrained Flow Gasification

Other universities participate as associates

│Status

N

• On-going discussions with Swedish Energy Agency and industrial • Application under preparation • Submission of application planned 5 March • Start?

Thank you!