Assembly - Collaborative Table

Report 2 Downloads 47 Views
INTERMIX

PART # 1733167 INSTRUCTION SHEET # 2572INS

COLLABORATIVE CONFERENCE ASSEMBLY INSTRUCTIONS

1.

Position the end panels near their final desired location. Align the (2) Giro fastener’s (installed) on each edge of the modesty panel, with the Giro locking plates on the inside face of each end HARDWARE KITS panel. Take the Giro Hex Key (included in hardware kit “HK-87”) and tighten the fasteners, to lock the panels in place. DETAIL “A”. (1) HK-87 Collaborative Conference Repeat this procedure for the opposite end panel as well. Assembly (4) 1/4"-20 x 1 1/2" 7/16" Hex Head Bolts 2. Install all (8) L-Brackets from the “HK-10” hardware kits. There will (1) Giro Hex Key be small pilot holes near the top of each end panel,GIRO where they FASTENER are to be positioned. There will be (4) L-Brackets on each end (8) HK-10 DETAIL A Collaborative Assembly SMALL PILOT HOLES Conference panel. DETAIL “B”. (1) 2.5" Metal L-Brackets with attaching FOR L-BRACKET 3. Center the cable trough assembly over the top of modesty panel. screws WARE KITS: GIRO FASTENER LOCATION 4. Align the holes in each end of the cable trough with the (2) holes -87 (withHEX the threaded inserts), near the top of each end panel (cable (1) HK-48 -20 x 1 1/2" 7/16" HEAD BOLTS DETAIL A HOLES (4) #8 x 1 1/4" Quad FlatSMALL Head PILOT screws RO HEX KEY.trough should be near flush with the top of the end panels). FOR L-BRACKET Secure the ends of theHARDWARE cable trough KITS: to each end panel using (2) Collaborative Conference Assembly LOCATION 1/4" x 20 x 1 1/2" hex head (included in hardware kit “HK-87”). (2) HK-27 -10 (1)bolts HK-87 DETAIL “C”. (10) #10 x 5/8" Quad Pan DT screws " METAL L-BRACKETS w/attaching (4) 1/4-20 x 1 1/2" 7/16" HEX HEAD BOLTS DETAIL B GIRO FASTENER GIRO HEXKEY. KEY(1) throughL-BRACKETS 5. Take the (4) screws from “HK-48” and run each of the . (1) GIRO HEX "HK-10" "HK-87" top of the modesty (4) center panel to DETAIL A spacers and down into the SMALL PILOT HOLES -48 secure the base assembly. DETAIL “D”. (8) HK-10 FORL-BRACKETS L-BRACKET X 1 1/4" QUAD FLAT HEAD screws.(1) over 2.5" METAL w/attaching 6. Position the worksurface the assembled base unit, so that it DETAIL B L-BRACKETS GIRO HEX KEY LOCATION rests square and flush screws. on all (4) sides. Use the remaining screws "HK-10" "HK-87" 1D BOLTS from each “HK-10” hardware kit and attach the worksurface to n the end panels (1) HK-48 the near basetheir unit. final d location.7. Take the screws from the (4) “HK-27” #8 X 1 1/4" QUADkits FLAT hardware andHEAD attachscrews. the worksurface to the cable trough. The screws will be inserted he (2) Giro fastener's (installed) on each STEP 1 taching C trough. through the L-brackets in the top of the cable DETAIL B

f the modesty panel, the Giro locking Position the end panels near their final L-BRACKETS GIRO with HEX KEY Collaborative Assembly on the inside face of each endConference panel.desired location. "HK-10" "HK-87" B

GIRO FASTENER hescrews. Giro Hex Key (included in hardware AlignGIRO the FASTENER (2) Giro fastener's (installed) on each D C C -87") and tighten the fasteners, to lock edge of the modesty panel, with the Giro locking DETAILAA DETAIL nels in place. DETAIL "A" SMALL PILOT HOLES plates on the inside face of each end panel. SMALL PILOT HOLES FOR L-BRACKET FOR L-BRACKET inal B LOCATION t this procedure for the opposite endTake panelthe Giro Hex Key (included in hardware LOCATION . kit "HK-87") and tighten the fasteners, to lock HEAD BOLTS the panels in place. DETAIL "A" 2ed) on each C A e locking allGiro (8) L-Brackets from the "HK-10" hardware nd panel. here will be small pilot holes near theRepeat top of this procedure for the opposite end panel as well. nd panel, where they are to be positioned. w/attaching B DETAIL B GIRO HEX KEY hardware L-BRACKETS GIRO HEX KEY will be (4) L-Brackets on each STEP L-BRACKETS 2 A “HK-87” ers, lock "HK-10" nel.toDETAIL "B" "HK-87" Install “HK-10” all (8) L-Brackets from the "HK-10" hardware C kits. There will be DETAIL small pilot holes near the top of each end panel, where they are to be positioned. EAD screws. site the end cablepanel trough assembly over the There top of will be (4) L-Brackets on each ty panel. end panel. DETAIL "B" DETAIL C eir final A 4 STEP3 HK-10" hardware he holes each withthe thecable trough assembly over the top of Center near theintop of end of the cable trough es (with theeach threaded inserts), near the top of panel. each modesty talled) on be positioned. C trough should be near flush with the top hnel Giro locking HEX HEAD hthe(cable end panels). cable 4 trough to BOLTS. h end panel. Secure the ends of the STEP #8 x 1/4" nd panel using (2) 1/4" x 20 x 1 1/2" hex head bolts in "HK-87" X 11 1/4" the holes each end of the cable trough with the #8 DETAIL C Align DETAIL C B SCREWS ed hardware kit "HK-87"). DETAIL (2)"C" holes (with the threaded inserts), near the top of each SCREWS d ininhardware DETAIL D D the top “HK-48” end panel (cable trough should be near DETAIL flush with "HK-48" eners, lock HEX HEAD over thetotop of 5 of the end panels). Secure the ends of the cable trough to BOLTS. A" he (4) screws from "HK-48" and run (1) through each end panel using (2) 1/4" x 20 x 1 1/2" hex head bolts "HK-87" f the (4)end center spacers and down into the top in of hardware kit "HK-87"). DETAIL "C" (included pposite panel destytrough panel to secure cable with the the base assembly. DETAIL "D" STEP 5 ), near the top of each 6d A Take the (4) screws from "HK-48" and run (1) through near flush hardware with the top HEX HEX HEAD HEAD e "HK-10" n the work surface over assembled base unit, each of the (4) center spacers and down into the top of ds ofnear the cable trough to the BOLTS. oles the top of flush BOLTS square and on all (4) sides. the modesty panel to secure#8the x 1base 1/4" assembly. DETAIL "D" xitto1rests 1/2" hex head bolts “HK-87” be positioned. "HK-87" e remaining screws from each "HK-10" hardware kit DETAIL "C" SCREWS each ach the work surface to the base unit. STEP 6d DETAIL D "HK-48" Position the work surface over the assembled base unit, DETAIL C Intermix - 2572INS - Page 1 of 1 Parton #:all 1733167 so that it rests square and flush (4) sides. and run (1) through Use the remaining screws from each "HK-10" hardware kit down into the top of bly over the top of

DETAIL D

#8 x 1 1/4" SCREWS "HK-48"