Little Moor Lane through Horse Field 1 ("HF1"), turning at Horse Field 2 ("HF2") to cross Clay Field as far as bridleway
4
Main Bridleway from village to Syd's bench
5
From 4 through gate across Horse Field 3 across stile into grass field then across stiles via two fields to bridge
6
From 8, across HF3 to stile at bottom across grass field to gap in hedge at Syd's bench
7
8
Condition of Path
Condition of Stiles
Path now open
N/A
Work done/ needed by me
None
Work Needed by CC Date last walked
-
28 August 2017
Getting overgrown
Gatepost completely broken NCC have been notified and Nettles cut 08/08/17 will liaise with landowner.
-
08 August 2017
F
Kissing Gate at top HF1 (3a) Kissing Gate HF1 to HF2 (3b) Gate HF2 to Clay Field (3c)
Clay Field in good dry condition
Gate HF2 to Clay field won't shut to latch. If anything Cut Nettles and brambles this is fitting even worse but round 3c on 13th August protected from horses by small electric fence.
-
28 August 2017
B
Gate into HF2 (4a)
Now resurfaced for steepest part. NCC thought holes were rabbits. Filled in.
Post on (4a) broken by horses. Mended and gate Nettles cut around 4(a) and shut with bridle. NCC aware. Syd's bench 8th August Protected by electric fence.
F
Kissing Gate at top HF3 (5a) Stile bottom HF3 (5b) Kissing Gate edge of grass field (5c) Stile next field (5d) Bridge (5e)
Good.
Stiles now covered in expamet
F
Stile bottom HF3 (5b)
Would encourage villagers to take direct path to stile 5b as iut is Stiles now covered in becoming disused in expamet favour of going round the field. Muddy at stile.
Farmer Street (Toft's end) path between houses then on to Rancliffe House
F
Gate on leaving village (7a) Gate onto field to Rancliffe Ho (7b) Stile at end of field (7c)
Path cut as part of regular Stile good. Tree now cleared Path good and clear cutting of field by NCC
Loughborough Road through gate past sheep field through small horse field to Horse Field 3.
F
Gate at end of sheep field (8a) Kissing Gate to HF3 (8b)
Good
Good
-
Nettles cut 8th August
Cut Cow Parsley 4th May
Cutting of bridleway by contractor done on schedule end August.
-
28 July 2017
22 February 2017
Clear waymark posts installed through field by NCC. One already broken