Chapter 14 - Material Requirements Planning

CHAPTER 14 MATERIAL REQUIREMENTS PLANNING Review and Discussion Questions 1. Discuss the meaning of MRP terms such as planned order release and scheduled order receipts. A planned order release is an order currently planned to be released. It has not been released. Consequently, the planned order release can be changed based upon changes in demand as one example. A scheduled order receipt, on the other hand, reflects an order that has already been released. The scheduled order receipt indicates the anticipated arrival of the released order. Due to variations in delivery times, it may not arrive exactly at the planned arrival time. 2. Many practitioners currently update MRP weekly or biweekly. Would it be more valuable if it were updated daily? Discuss. The performance of any operation will naturally vary from day to day. When the observed time period in which performance is measured is a week or two, the daily variations are smoothed; that is, the variations in performance are averaged. For example, below-average performance in one day may be offset by a higher-than-average performance the next day. Daily MRP runs monitor performance too closely and may even create an exception report calling a normal variation an abnormal deviation from expected output. 3. What is the role of safety stock in an MRP system? The role of safety stock in an MRP system is to buffer any uncertainties in quantities. One cause of quantity uncertainties is quality. Safety lead time should be used to offset any uncertainties in timing, from such occurrences as production or purchase delays. The addition of safety stock results in extra inventory being carried, thus reducing performance. If possible, any uncertainties in the quantities should be eliminated so that no safety stock is needed. 4. Contrast the significance of the term lead time in the traditional EOQ context and in an MRP system. In the traditional context, lead time is fixed—either as a discrete time or as a probability distribution. Such lead time constancy or variation is outside of the inventory model. Lead time in an MRP system is assumed to be a variable. While specific lead times are stated for planning purposes, these times may be speeded up or delayed as conditions warrant. Indeed, it is this ability to detect needed changes in lead times—either by expediting or de-expediting—that many users cite as one of the most valuable features of MRP.

14-1

Chapter 14 - Material Requirements Planning

5. Discuss the importance of the master production schedule in an MRP system. The master production schedule “drives” the system. It states the planned due dates for end items. Material requirements planning computer runs, however, involve an iterative process. The master production schedule “proposes” or “hypothesizes” a tentative schedule. After the MRP run with this schedule, the shop scheduler examines the MRP plan for impractical loads on the productive system —either by stating excessive demands on personnel or equipment, or in excessive idle time. Then the master production schedule is revised and the program is run again. Because the entire MRP system is geared to satisfying the master production schedule, it is critical that the master production schedule be correct at the start of the first MRP run. The production scheduler then knows what effects any changes he makes on the schedule will have on the original MRP schedule. He can then take appropriate action as necessary, such as requesting that customers be contacted to try to extend promised dates if they are too close, or to arrange for early delivery or additional storage space if products will be completed prior to the promised delivery date. 6. “MRP just prepares shopping lists. It does not do the shopping or cook the dinner.” Comment. An MRP system generates schedules to meet material needs. It starts with the master schedule and develops a time phased schedule which specifies what, when, and how many units of each material are required. Whether this schedule is adhered to, depends first on the master scheduler who may change the schedule. Then an inventory control personnel may choose to change order quantities or timing. Then the purchasing department may make further modifications to a purchase order, and finally the production scheduler may actually release the work to production—(which may be at some time other than that called for in the MRP schedule). 7. What are the sources of demand in an MRP system? Are these dependent or independent, and how are they used as inputs to the system? An MRP system has both dependent and independent item demands. The major demands on the system occur through the master production schedule (these are usually of independent origin). From here on throughout the system, the demands are then dependent on the master production schedule. Orders for spare parts and repair parts normally do not go through the master production schedule unless their amounts are large enough to place a significant load on the productive system. These demands (which are usually independent) are fed into the inventory records file by-passing the master production schedule. Once there, they are then exploded into the required parts and materials needed during the normal course of the MRP run. The parts and materials needed to make the spares and repair parts are, therefore, dependent demand.

14-2

Chapter 14 - Material Requirements Planning

8. State the types of data that would be carried in the bill of materials file and the inventory record file. The Bill of Materials file contains information about the product, including a listing of parts numbers, quantities needed per unit or product, and the assembly or process flow stipulating how the unit is structured. Engineering design changes that affect the product structure are placed into the Bill of Materials file. Also, parts or material changes that occur through a change of vendors or material composition are also added to update the file. The Inventory Record file contains a great deal of information about each inventory item. At a minimum, the file would contain the number of units on hand and on order, the number reserved for prior commitments, the cost of the item, the name and address of the vendor, the lead time needed to obtain a shipment, and any shipment size restrictions. Additional information may be added as desired, such as that contained in Exhibit 14.8.

Problems (sample MRP schedule worksheet) Period Item LT= Q=

Item LT= Q=

Item LT= Q=

Item LT= Q=

Item LT= Q=

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

14-3

Chapter 14 - Material Requirements Planning

Item LT= Q=

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

Item LT= Q=

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

Item LT= Q=

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

1. X A(4)

B(2) D(3)

C(3) E(1)

F(4)

G(2)

b. X 10 5

A 40 4

B 15 0

C 29 5

D 27 0

E -10

F 18 0

G 490

2. Period Item J LT= 1 week Q= L4L

1

2 75

3

4 50

5 70

40

40 35 35

0

0 50 50 70

0 70 70

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

35

50

14-4

6

7

8

9

10

Chapter 14 - Material Requirements Planning

3. Period Item X LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item Y LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item Z LT= 3 Q= L4L

Gross requirements Scheduled receipts

Item A LT= 2 Q== L4L

Gross requirements Scheduled receipts

Item B LT= 1 Q== L4L

Gross requirements Scheduled receipts

Item C LT= 3 Q== L4L

Gross requirements Scheduled receipts

On hand from prior period

1

2

3

4

5

6

7

8

9

10 100

20

20

20

20

20

20

20

20

20

20 80 80

Net requirements Planned order receipts Planned order releases

On hand from prior period

80 160 40

40

40

40

40

40

40

40

Net requirements Planned order receipts Planned order releases

On hand from prior period

120 240 30

30

30

30

30

30

30

210 420

120

50 370 370

0 120 120

30

30 210 210

60

60

Net requirements Planned order receipts Planned order releases

On hand from prior period

50

50

50

50

50

370

120

Net requirements Planned order receipts Planned order releases

On hand from prior period

240 100

100

100

100

100

100

Net requirements Planned order receipts Planned order releases

On hand from prior period

40 120 120

100 140 140

140 840 900

900

900

900

Net requirements Planned order receipts Planned order releases

14-5

900

900

60

60

Chapter 14 - Material Requirements Planning 4.

Level 0

Z

A(2)

C(3)

Period Item Z LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item A LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item C LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item D LT= 1 Q= L4L

Gross requirements Scheduled receipts

1

2

3

1

B(4)

D(4)

2

E(2)

3

4

5

6

7

8

9

10 50

On hand from prior period

Net requirements

50 50

Planned order receipts Planned order releases

50 100

On hand from prior period

Net requirements

100 100

Planned order receipts Planned order releases

100 200

On hand from prior period

Net requirements

200 200

Planned order receipts Planned order releases

200 300

On hand from prior period

Net requirements

300 300

Planned order receipts Planned order releases

300 400

On hand from prior period

Net requirements

400 400

Planned order receipts Planned order releases

400

14-6

Chapter 14 - Material Requirements Planning

Item E LT= 3 Q= L4L

Gross requirements Scheduled receipts

800

On hand from prior period

Net requirements

800 800

Planned order receipts Planned order releases

800

5. Level

B(3)

0

C

1

2

B

E(2)

D

E(2)

F

Period

A

D

E(2)

F

3

D(2)

4

F

1

2

3

4

5

6

7

8 30

9

10

0

10 0

10

10

10

10

10

10 20 20

0

0

Gross requirements Scheduled receipts

50

20 60

On hand from prior period

0 50 50 60

40

40

40

40

180

180

180

180

Item A LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 1 Q= L4L Item C LT= 1 Q= 50

Gross requirements Scheduled receipts

Item D LT= 2 Q= 50 Item E LT= 1 Q= 200

Gross requirements Scheduled receipts

On hand from prior period

Net requirements Planned order receipts Planned order releases

Net requirements Planned order receipts Planned order releases

On hand from prior period

50

20 10

10

10

10

10

Gross requirements Scheduled receipts

50

50 60

On hand from prior period

0 50 50

0 60 100

100

220

100

0 220 400

Net requirements Planned order receipts Planned order releases

Net requirements Planned order receipts Planned order releases

On hand from prior period

50 50 50

100

10 10 50 40 40 0

100

100

Net requirements Planned order receipts Planned order releases

0 60 60

400

14-7

180

Chapter 14 - Material Requirements Planning

Item F LT= 1 Q= L4L

Gross requirements Scheduled receipts

400 50 150

On hand from prior period

200

200

Net requirements Planned order receipts Planned order releases

200 200 200

200

6. Product structure tree

Level A

B(2)

E

0

C(3)

F(2)

F(2)

1

D(2)

2

D

3

D(2)

Low-level coded product structure tree Level

B(2)

E

F(2)

A

0

C(3)

1

2

F(2)

D(2)

D

D(2)

Indented bill of materials

Single level bill of materials

.A

A .B(2)

B(2) C(3) D(2)

.E .D(2) .F(2)

B

14-8

3

Chapter 14 - Material Requirements Planning .C(3)

E F(2)

.F(2) .D

C

.D(2)

D F(2) E D(2)

Period Item A LT= 1 Q= L4L Item B LT= 2 Q= L4L Item C LT= 1 Q= L4L Item D LT= 1 Q= L4L Item E LT= 2 Q= 50 Item F LT= 1 Q= 180

1

2

3

4

5

6

7

Gross requirements

8 20

9

10

Scheduled receipts On hand from prior period

Net requirements Planned order receipts

20 20

Planned order releases Gross requirements

20 40

Scheduled receipts On hand from prior period

Net requirements Planned order receipts

40 40

Planned order releases Gross requirements

40 60

Scheduled receipts On hand from prior period

15

15

15

15

15

15

Net requirements Planned order receipts Planned order releases Gross requirements

45 45

100

15 45 45 40

Scheduled receipts On hand from prior period

50

50

Net requirements Planned order receipts Planned order releases Gross requirements

50

Scheduled receipts

20 0

On hand from prior period

50 50 50

0

0

0 40 40

20 20 50

30

30

30

30

30

80

90

80 180

100

10

10

10

10

45 40 20

20

Net requirements Planned order receipts Planned order releases Gross requirements

0 45 45 40

50

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

180

14-9

Chapter 14 - Material Requirements Planning 7. Level

A

0

B

1

C(4)

C

D(2)

Period Item A LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 2 Q= 50

Gross requirements Scheduled receipts

Item C LT= 1 Q= 100

Gross requirements Scheduled receipts

Item D LT= 3 Q= L4L

Gross requirements Scheduled receipts

Item E LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item F LT= 2 Q= 50

Gross requirements Scheduled receipts

On hand from prior period

E

E

D(2)

F(3)

F(3)

F

2

E

3

F(3)

4

1

2

3

4

5

6

7

8

9

10 50

10 20

30

30

30

30

30

30

30

30

30 20 20

30

30

Net requirements Planned order receipts Planned order releases

20 20

On hand from prior period

0 20 50

Net requirements Planned order receipts Planned order releases

On hand from prior period

50 200 100 50

150

150

150

150

150 50 100

50

50

30

30

200

0

0

0

0

0

100

50

10 90 90

0 50 50

30

30

30

30

Net requirements Planned order receipts Planned order releases

On hand from prior period

20

100 200 100

100

100 200

200

Net requirements Planned order receipts Planned order releases

On hand from prior period

10

10

10

10

90 270

50 150

0 270 300

30 120 150 50

Net requirements Planned order receipts Planned order releases

On hand from prior period

Net requirements Planned order receipts Planned order releases

300

150

14-10

50 30

30 20 50

Chapter 14 - Material Requirements Planning 8. Level

B(2)

D(3)

Period

Item B LT= 2 Q= 40 Item C LT= 1 Q= L4L Item D LT= 3 Q= 160 Item E LT= 2 Q= L4L Item F LT= 2 Q= L4L

0

C

1

2

B(3)

F

D(3)

E

Item A LT= 2 Q= 20

A

F

3

D

E

E

E(4)

4

1

2

3

4

5

6

7

8

9

10 20

5

5

10 5

15

15

15

15

15

15

15 5 20

10

10

60 20 10 30 40

10

10

40

40

0

0

Gross requirements Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

10

10

10

10

Net requirements Planned order receipts Planned order releases Gross requirements

20 40 10 30 40 20

Scheduled receipts On hand from prior period

Net requirements Planned order receipts

20 20

Planned order releases Gross requirements

120

120

20 20

100 20 160

140

20

Scheduled receipts On hand from prior period

100

100

100

160 160 60 100

100

100

Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts On hand from prior period

80 0

0

0

0

Net requirements Planned order receipts Planned order releases Gross requirements

80 40 40 0

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

40

14-11

40 0 40 40

0 80 80

0

Chapter 14 - Material Requirements Planning

9.

14-12

Chapter 14 - Material Requirements Planning

Period

1 20

2 20

3

4

5

6 60

7

8 50

20

0 20 20

0

0

0

0 60 60

0

0 50 50

Item A LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item C LT= 2 Q= L4L

Gross requirements Scheduled receipts

60

On hand from prior period

60

Item D LT= 1 Q= 50

Gross requirements Scheduled receipts

Item E LT= 2 Q= 100

Gross requirements Scheduled receipts

180

On hand from prior period

20

Item F LT= 2 Q= 100

Gross requirements Scheduled receipts

0 180 200 200 360 0 360 400 300

On hand from prior period

Net requirements Planned order receipts Planned order releases

On hand from prior period

20 40 30 50

60 120 40

40

40

Net requirements Planned order receipts Planned order releases

80

0

0

Planned order receipts Planned order releases

25

Planned order receipts Planned order releases

25

200

On hand from prior period

Net requirements Planned order receipts Planned order releases

25 155 200

200

Net requirements Planned order receipts Planned order releases

400

0

100

0 100 100

100 150

0

0 180 180 150 150

0

0 150 150

45

45 105 150

45

45

45

45

45

20 130 200

70

70

70

70

70

80

300

100

40 40 100 100

60 240 300

60 40 100

60

60

60

60

180 180

Net requirements

10

50 100

180

Net requirements

On hand from prior period

40 80 80

9

150 150

10.

14-13

Chapter 14 - Material Requirements Planning

Period

1

2 30

3

4

5 30

6

7

8 40

20

20 10 10

0

0

0 30 30

0

0

0 40 40

Item A LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item C LT= 1 Q= >50

Gross requirements Scheduled receipts

Item D LT= 2 Q= 100

Gross requirements Scheduled receipts

10

On hand from prior period

20

10

100

100

Item E LT= 2 Q= 50

Gross requirements Scheduled receipts

On hand from prior period

Net requirements Planned order receipts Planned order releases

On hand from prior period

10 10 10 0

30 30 0

0

Net requirements Planned order receipts Planned order releases

On hand from prior period

Planned order receipts Planned order releases

40

50 100

Net requirements

On hand from prior period

10

150

0

10 90 100

10

10 140 150

0 40 40

40

40 20 50

80 30

10 20 100 100

30

50 100

30 80

150

Net requirements Planned order receipts Planned order releases

0

60 40

10

40 40

30 20 50 10

Net requirements

Planned order receipts Planned order releases

0 30 30

9

80 20 100

30 50 50 40 80

40

40

40

10

10

10

10

150 10

150

14-14

10

10 140 150

Chapter 14 - Material Requirements Planning

11. Least Total Cost Period Gross Requirements On-hand Net requirements Planned order receipts

1 30 90 0

Planned order releases

250

Least Unit Cost Period Gross Requirements On-hand Net requirements Planned order receipts Planned order releases Calculations Weeks Quantity ordered 4 4 to 5 4 to 6 4 to 7 4 to 8 4 to 9 4 to 10 9 9 to 10

20 90 170 190 250 450 500 200 250

1 30 90 0

2 50 60 0

3 10 10 0

4 20 0 20 250

5 70 230 0

6 80 160 0

7 20 80 0

8 60 60 0

9 200 0 200 250

10 50 50 0

7 20 280 0

8 60 260 0

9 200 200 0

10 50 0 50 50

250

2 50 60 0

3 10 10 0

4 20 0 20 450

5 70 430 0

6 80 360 0

450

50

Carrying Order Total cost Unit cost cost cost $0.00 $10.00 $10.00 $0.500 0.70 10.00 10.70 0.119 2.30 10.00 12.30 0.072 2.90 10.00 12.90 0.068 5.30 10.00 15.30 0.061 15.30 10.00 25.30 0.056 18.30 10.00 28.30 0.057 0.00 10.00 10.00 2.50 10.00 12.50

For Least Total Cost, order for periods 4 through 8, since carrying cost is the closest to ordering cost. For Least Unit Cost, order for periods 4 through 9, since this has the lowest unit cost.

14-15

Chapter 14 - Material Requirements Planning

12.

Level 0

A

B(2)

D(3)

Period

E(2)

1

1

C(4)

2

F(2)

3

2

E(2)

4

5

6

7

8

9

Item A LT= 1 Q= L4L

Gross requirements Scheduled receipts

Item B LT= 2 Q= L4L

Gross requirements Scheduled receipts

Item C LT= 2 Q= L4L

Gross requirements Scheduled receipts

400

On hand from prior period

0 400 400

Item D LT= 3 Q= L4L

Gross requirements Scheduled receipts

Item E LT= 2 Q= L4L

Gross requirements Scheduled receipts

1200

On hand from prior period

0 1200 1200

On hand from prior period

0 100 100

Net requirements Planned order receipts Planned order releases

100 200

On hand from prior period

0 200 200

Net requirements Planned order receipts Planned order releases

200

Net requirements Planned order receipts Planned order releases

400 600

On hand from prior period

0 600 600

Net requirements Planned order receipts Planned order releases

600

Net requirements Planned order receipts Planned order releases

10 100

1200

14-16

Chapter 14 - Material Requirements Planning

Item F LT= 3 Q= L4L

Gross requirements Scheduled receipts

800

On hand from prior period

0 800 800

Net requirements Planned order receipts Planned order releases

800

13. a. Product Structure Tree

Level 0

A

B(2)

E(4)

C(3)

F(3)

H(2)

E(5)

D

1

2

D(3)

3

G(2)

b. Low-level Coded Product Structure Tree

Level

B(2)

F(3)

E(4)

H(2)

E(5)

A

0

C(3)

1

D(3)

G(2)

c. Indented Parts List .A .B(2) .E(4) .F(3) .C(3) .D(3)

14-17

D

2

3

Chapter 14 - Material Requirements Planning .H(2) .E(5) .G(2) .D(1)

d.

Level 0 Level 1 Level 2 Level 3

100 units of A 200 units of B 300 units of C 600 units of F 600 units of H 1000 units of D (3x3x100 + 1x100) 3800 units of E (4x2x100 + 5x2x3x100) 1200 units of G

14. Period

1

2

3

4

5

6

7

8

9

10

Gross Requirements

20

10

15

45

10

30

100

20

40

150

On-hand

70

50

40

25

Net requirements

20

Planned order receipts

180

Planned order releases Weeks

180

4

Quantity ordered 20

Carrying cost $0.00

Order cost $9.00

Total cost $9.00

Unit cost

4 to 5

30

0.20

4 to 6

60

1.40

9.00

9.20

0.307

9.00

10.40

4 to 7

160

0.173

7.40

9.00

16.40

4 to 8

0.103

180

9.00

9.00

18.00

0.100

4 to 9

220

13.00

9.00

22.00

0.100

4 to 10

370

31.00

9.00

40.00

0.108

$0.450

Least Total Cost method indicates that 180 units should be ordered to cover the needs for periods 4 through 8, since the carrying cost is equal to the order cost ($9). Least Unit Cost it tied at $.100 for ordering for periods 4 through 8 and 4 through 9. Therefore, order either 180 or 220 units in period 2.

14-18

Chapter 14 - Material Requirements Planning

15. Period Standard Model Sports Model Item Radio/ CD LT= 2 Q= L4L

Item Std. trim LT= 2 Q= L4L

Item Std. Hardware LT= 3 Q= L4L

Item Sports trim LT= 2 Q= L4L

Item Sports HardWare LT= 3 Q= L4L

1

2

3

Gross requirements

4 300

5

300

200 200

50 250 250

0 200 200

6

7

8 400 100 500

0

0

0 500 500

Scheduled receipts On hand from prior period

50

50

50

250

200

Net requirements Planned order receipts Planned order releases Gross requirements

500 300

400

300 300

400 400

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements

300

400 300

400

300 300

400 400

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements

300

400 200

100

200 200

100 100

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases Gross requirements

200

100 200

100

200 200 100

100 100

Scheduled receipts On hand from prior period

Net requirements Planned order receipts Planned order releases

200

14-19