Chief Architect 10.04a: Permit Layout.layout

Report 6 Downloads 343 Views
12 8

12 8

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes.

12 8

2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 8'-0"

4. Changes made during construction are the responsibility of the construction manager.

1'-5"

5. Contractors are responsible for cleanup of the job site.

1'-5"

8'-0"

6. Do not scale drawings.

8'-7"

1'-5"

8'-0"

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

Ph: 457-0161

12

WINDOW WELL MAY BE REQUIRED

email: [email protected]

6 12 8

REVISION:

ITEM:

DATE:

FRONT ELEVATION SCALE: 1/8"=1'-0"

OWNER:

INNORIZON DEVELOPMENTS ADDRESS:

4'-0"

RETAINING WALL

LEFT ELEVATION SCALE: 1/8"=1'-0"

VHS Directory: /VHStudio Projects/VHS156

98 PORTLAND STREET ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

1/8"=1'-0" SHEET NO.

A1

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager. 5. Contractors are responsible for cleanup of the job site. 6. Do not scale drawings.

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

Ph: 457-0161 email: [email protected]

12 6 12 8

REVISION:

ITEM:

DATE:

12 8

REAR ELEVATION SCALE: 1/8"=1'-0"

OWNER:

INNORIZON DEVELOPMENTS ADDRESS:

RIGHT ELEVATION SCALE: 1/8"=1'-0"

VHS Directory: /VHStudio Projects/VHS156

98 PORTLAND STREET ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

1/8"=1'-0" SHEET NO.

A2

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager.

65'-0" 14'-8"

4'-4"

5'-10"

10'-11"

11'-0"

5. Contractors are responsible for cleanup of the job site.

18'-3"

6. Do not scale drawings.

7'-0" SD

7'-2"

4'-1"

UTILITY

BEDROOM

11'-1" x 11'-2"

10'-0"

WH

10'-5"

C5

BEDROOM

MAIN ELEC. PANEL

C5

12'-1"

3040

8'-0" x 9'-6"

11'-0" x 11'-5"

LAUNDRY

6230

RETAINING WALL

6'-0"

6230

5'-9"

5'-3"

11'-9"

REVISION:

2'-4"

13'-4"

ITEM:

DATE:

FOUNDATION STEPS, SEE SITE PLAN

6'-1" 11'-4"

LIVING AREA 4'-1" 1821 sq ft

7'-9"

8'-7"

21'-6"

65'-0" WINDOW WELL REQUIREMENT DETERMINED BY GRADE

OWNER:

INNORIZON DEVELOPMENTS

FIRST LEVEL PLAN SCALE: 3/16"=1'-0"

ADDRESS:

98 PORTLAND STREET VHS Directory: /VHStudio Projects/VHS156

UP

11'-10"

ELEC. PANEL

STORAGE

3068 2668

UP

Ph: 457-0161 email: [email protected]

14'-8"

4'-2"

C

20'-7" x 13'-9"

SEE MANUFACTURER'S SPECS

3068

2'-4" 4'-0"

FAMILY 17'-5" x 12'-5"

P

ENG. FLOOR SYSTEM

OUTLINE OF DECK ABOVE

3'-3"

4'-0"

3

2668

4'-6"

4'-6"

3068

4068

2668

2668

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

28'-0"

GFCI

3068

3068

HRV

10'-8" x 8'-11"

3'-11" 3068

2'-1" 2'-1"

4'-2"

28'-0"

2068

10'-8" x 8'-0"

DINING

2668

2'-4"

3068

KITCHEN

5'-5" x 8'-10"

3068

C

BATH

7'-6" 2'-2"

4'-6"

2668

3040

9'-8"

14'-0" x 8'-10"

C

SEE MANUFACTURER'S SPECS

REF.

BEDROOM

ENG. FLOOR SYSTEM

C5

6'-6"

5'-2"

C5

ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

3/16"=1'-0" SHEET NO.

A3

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager. 5. Contractors are responsible for cleanup of the job site.

65'-0" 11'-6"

2'-4"

6. Do not scale drawings.

19'-8"

5'-5"

26'-1"

MOTION DETECTED LIGHTING, BOTH ENDS OF BUILDING

9'-0" x 6'-0"

SD

DINING 4'-5"

5'-0"

6250

6250

5'-0" 11'-0"

3'-8" 2'-4"

6'-2" 2868

5468

5'-9" 9'-5"

LOBBY

4'-5"

5'-4" 6'-4" LIVING11'-8" AREA 1819 sq ft

DATE:

6250

ENG LINTEL ABOVE DOOR TO SUPPORT CROSS BEAM ALL FLOORS

6250

9'-2"

REVISION:

ITEM:

6'-2"

4'-0"

2668

4'-2"

5'-2"

9'-1" x 11'-5"

MAILBOXES

BEDROOM

BEDROOM

WH

10'-5"

C5

ELEC. PANEL

HRV

2668

3068

3'-10"

ELEC. PANEL

SEE MANUFACTURER'S SPECS

UP

10'-4" x 10'-4"

6'-0"

ENG. FLOOR SYSTEM

3068 2668

ENG LINTEL ABOVE WINDOW TO SUPPORT BEAM ALL FLOORS

17'-0"

2668

2668

WH

HRV

GFCI

P

1'-8" 2'-7"

2668

3050

4'-4"

4'-6"

6250

ENG. BEAM

2668

ENG. BEAM

Ph: 457-0161 email: [email protected]

28'-0"

3'-8"

7'-10"

BATH

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

7'-10"

26 6

8

2'-8" 1'-8"

2668

3'-4"

2668

2'-6"

5'-6"

9'-8"

SHELVES

C5

6250

11'-0"

6'-0"

26'-2" OWNER:

65'-0"

INNORIZON DEVELOPMENTS

DOOR ENTRY HEIGHT DETERMINED BY GRADE

ADDRESS:

98 PORTLAND STREET

SECOND LEVEL PLAN SCALE: 3/16"=1'-0"

DOWNLIGHTS IN SOFFIT ABOVE

VHS Directory: /VHStudio Projects/VHS156

9'-8"

7'-6"

2668

SEE MANUFACTURER'S SPECS

KITCHEN

9'-8"

4'-4"

7'-8"

28'-0" 16'-7" x 7'-0"

BATH

5'-0" x 5'-0"

10'-1" x 12'-7" 10'-4" x 7'-0"

DECK

DECK

GFCI

FAMILY

ENG. FLOOR SYSTEM

6'-1"

2668

REF.

10'-10" x 10'-0"

C

UP

C5

C

BEDROOM 3050

10'-8"

5'-2"

C5

ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

3/16"=1'-0" SHEET NO.

A4

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager. 5. Contractors are responsible for cleanup of the job site.

67'-0" 1'-0"

11'-6"

C

2'-4"

2668

HRV

1'-0"

6250

1'-0"

2668

4'-2" 6250

9'-0"

4'-6" 2'-6"

4'-6"

SPARE

29'-0"

4'-10"

4'-6"

9'-11" x 11'-0"

6250

9'-0"

OFFICE 9'-9" x 11'-6"

DATE:

4'-6"

9'-1" x 11'-6"

3050

BEDROOM

BEDROOM

8

5'-5"

ELEC. PANEL

REVISION:

ITEM:

2668

UP

4'-2"

10'-4" x 10'-4"

SD

Ph: 457-0161

2'-8"

2668

4068

11'-8"

5'-2"

2668

3068

4'-3"

10'-5"

3'-9"

3'-9"

3'-10"

3'-1"

2668

ENG. BEAM

26 6

1'-9" 2'-2"

3068

2668

2668

5'-0"

GFCI

5'-2"

6'-8"

2668

P

5'-3"

8'-0"

ENG. BEAM

9'-11" x 5'-10"

3050

7'-1"

4'-10"

ENG. BEAM

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

email: [email protected]

2'-9"

8 26 6

3'-2"

BATH

8

6250

6250

6'-0" 1'-0"

5'-0" 11'-0"

3'-8" 2'-4"

5'-9" 9'-5"

1'-3" 3'-2"

5'-4" 6'-4" LIVING11'-8" AREA 1856 sq ft

3'-9" 2'-2"

3'-3"

6'-5" 10'-2"

4'-7"

6'-0" 10'-7"

1'-0"

OWNER:

INNORIZON DEVELOPMENTS

67'-0"

ADDRESS:

98 PORTLAND STREET

THIRD LEVEL PLAN SCALE: 3/16"=1'-0"

VHS Directory: /VHStudio Projects/VHS156

9'-0"

SD

SD

2'-1"

SHELVES

3050

KITCHEN 10'-3" x 6'-10"

3050

ENG. FLOOR SYSTEM

FAMILY 29'-4" x 12'-11"

11'-6"

REF.

DINING

2'-5"

3050

3'-10"

10'-10" x 10'-2"

SEE MANUFACTURER'S SPECS

6'-1"

2668

5'-2" 9'-0"

BEDROOM

1'-10" 8'-2"

29'-0"

1'-0"

6 26

16'-9" x 7'-0"

30'-1"

11'-6" x 12'-7"

5'-4"

DECK

21'-1"

C5

DECK

UP

6. Do not scale drawings.

ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

3/16"=1'-0" SHEET NO.

A5

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work. 3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager. 5. Contractors are responsible for cleanup of the job site.

67'-0"

9'-0" 4'-6" 2'-6" 29'-0"

4'-10"

DATE:

2'-8" 4'-6"

10'-8"

SPARE 8'-11" x 10'-0"

3'-6"

9'-9" x 10'-6"

8'-5" x 7'-2"

2'-0"

2'-0"

8'-0"

9'-1" x 10'-6"

6250

REVISION:

ITEM:

2668

3050

OFFICE

DECK

6250

email: [email protected]

5'-5"

HRV

3'-11"

2'-1"

3050

1'-8" 2'-2"

3068

9'-5"

BEDROOM

ELEC. PANEL

9'-6"

3'-0" 6'-10"

3068

2668

DN

4068

3'-10"

1'-9" 2'-6"

2668

2668

3050

6250

6250

6250

4'-11" 2'-0"

5'-1" 10'-0"

3'-8" 2'-4"

5'-9" 9'-5"

1'-3" 3'-2"

5'-4" 6'-4" LIVING11'-8" AREA 1679 sq ft

3'-9" 2'-2"

3'-3"

6'-5" 10'-2"

4'-8"

4'-11" 9'-7"

2'-0"

OWNER:

INNORIZON DEVELOPMENTS

67'-0"

ADDRESS:

FOURTH LEVEL PLAN SCALE: 3/16"=1'-0"

98 PORTLAND STREET VHS Directory: /VHStudio Projects/VHS156

2'-2" 2'-10" 8'-0"

GUARDRAIL

4068

8

2668

6'-8"

BEAM

6 26

9'-4" x 10'-1"

5'-11"

P

8'-0"

4'-10"

7'-1"

" -4 4'

BEDROOM

2668

3'-6"

Ph: 457-0161

SD

BEAM

2668

3050

11'-6"

FAMILY

8

SD

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

28'-4" x 12'-11"

4' -2 "

GFCI

DINING 9'-1" x 12'-7"

BEAM

4'-2"

2'-0"

26 6

ENG. FLOOR SYSTEM

3050

3'-10" 5'-0"

BATH 9'-11" x 6'-5"

SEE MANUFACTURER'S SPECS

5'-2"

FAMILY 15'-5" x 10'-0"

9'-0" 7'-2" 29'-0"

29'-1"

REF.

DN

8'-6"

4'-6"

25'-5"

2'-2" 2'-8"

2'-0"

6. Do not scale drawings.

ADDRESS2:

DATE:

MARCH 2006 DRAWN BY:

VISUAL HOME STUDIO SQ. FT.

SCALE

3/16"=1'-0" SHEET NO.

A6

10" 1'-7"

3"

SCALE: 1-1/2"=1'-0" 1'-4"

2"

TYPICAL WALL SECTION 11"

VHS Directory: /VHStudio Projects/VHS156

1'-1"

10"

TYP. FLOOR CONSTR :

3" MIN. CONC. SLAB, TROWEL FINISHED 6 MIL POLY V.B. 6" MIN. FREE DRAINING GRANULAR FILL COMPACTED

TYP. FLOOR CONSTR :

-3/4" GYPCRETE OVERPOUR -3/4" OSB GOLD SUB FLOOR -OPEN WOOD TRUSSES -RESILIENT CHANNEL -2 LAYERS OF 5/8" TYPE X GYPSUM BOARD TAPED, FILLED & PAINTED

8"

1'-8"

TYPICAL

2

2

2

2

2

2

2

12

6

6

6

6

6

6

6

(X)

CONT. ALUMINUM GUTTER

CONT. VINYL SOFFIT & VENT

TYPICAL ROOF CONSTRUCTION :

PERIMETER DRAINAGE TILE

FREE DRAINING GRANULAR FILL

WATERPROOFING

FINISH GRADE, SLOPE AWAY

1/2" ~ ANCHOR BOLTS, 8" LONG

COMPRESSABLE GASKET

2x6 SILL PLATE

-1/2" G.W.B., TAPED FILLED & PAINTED -CONT. 6 MIL POLY V.B. -2"x6" STUDS @ 16" o/c -R-20 BATT INSULATION -5/8" OSB -TYVEK AIR BARRIER, LAP ALL JOINTS & TAPE -EXTERIOR SIDING

TYP. EXTERIOR WALL CONSTR :

STARTER STRIP

25 YEAR ASPHALT SHINGLES 7/16" SUPER ROOF PRE-ENG. ROOF TRUSSES @ 24" O.C. R40 INSULATION 1" X 4" STRAPPING 6 MIL. POLY. V.B. 1/2" G.W.B.

NOTES: 1. All work to conform to NBCC 1995 and in compliance with local building codes. 2. Contractors to verify all dimensions before starting any work.

3. Discrepancies on the drawing to be discussed with construction manager prior to continuing. 4. Changes made during construction are the responsibility of the construction manager.

5. Contractors are responsible for cleanup of the job site.

6. Do not scale drawings.

1'-4"

Visual Home Studio's sole liability is for the drafting service associated with these plans. No responsibility is implied or assumed for the design and subsequent performance of this structure.

email: [email protected]

Ph: 457-0161

ITEM: REVISION:

SCALE

SHEET NO.

SQ. FT.

A7

DATE:

OWNER:

INNORIZON DEVELOPMENTS

ADDRESS:

98 PORTLAND STREET

ADDRESS2:

DATE:

MARCH 2006

DRAWN BY:

VISUAL HOME STUDIO