CIPC 2008-109 - Petroleum Engineering - Texas A&M University

CIPC 2008-109 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls

*Department of Petroleum Engineering Texas A&M University College Station, TX 77843-3116 +1.979.845.2292 — [email protected] CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 1/19

D. Ilk, Texas A&M U. J.A. Rushing, Anadarko Petroleum Corp. and T.A. Blasingame,* Texas A&M U.

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 2/19

Presentation Outline zRationale For This Work zNew Rate Equation: ■ Power Law form for Decline Constant ■ Power Law Exponential Rate Model zField Examples: ■ Case 1 — West Virginia Gas Well ■ Case 2 — East Texas (US) Gas Well zClosure: ■ Summary ■ Recommendations

Rationale For This Work ●Definitions:

■ Loss Ratio:

1 q ≡− D dq/dt ■ Derivative of Loss Ratio: d ⎡1⎤ d ⎡ q ⎤ b≡ ⎢ ⎥≡− ⎢ ⎥ dt ⎣ D ⎦ dt ⎣ dq/dt ⎦ ■ Hyperbolic Rate Relation: qi q= [1 + bDi t ](1 / b )

⎡ dq ⎤ ⎢or D ≡ − ⎥ dQ ⎦ ⎣

⎡ d ⎡ 1 ⎤⎤ ⎢or b ≡ q ⎥ ⎢ ⎥ dQ ⎣ D ⎦ ⎦ ⎣

■ Hyperbolic relation mis-applied to transient data. ■ What is the "characteristic behavior" of the D and b-parameters — evaluate continuously using data. CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 3/19

●Cause and Effect:

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 4/19

Rationale For This Work

New Rate Equation

n ˆ = qˆi exp[− Di t ] CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 5/19

●Observed Behavior of Decline Parameter: 1 dq −B D≡− ≈ At q dt ●Solving for Flowrate: A ( 1 − B ) q = qˆi exp[− t ] (1 − B)

(1/5)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 6/19

Example 1: SPE 13169 (W. Virginia Well A)

(2/5)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 7/19

Example 1: SPE 13169 (W. Virginia Well A)

(3/5)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 8/19

Example 1: SPE 13169 (W. Virginia Well A)

a. "Log-log Plot" — Specialized hyperbolic "rate-cumulative" type curve (qg/qgi vs. 1(Gp/G)).

(4/5)

b."Cartesian Plot" — Specialized hyperbolic "rate-cumulative" type curve (qg/qgi vs Gp/G).

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 9/19

Example 1: SPE 13169 (W. Virginia Well A)

(5/5)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 10/19

Example 1: SPE 13169 (W. Virginia Well A)

(1/6)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 11/19

Example 2: SPE 84287 (E. Texas Gas Well)

(2/6)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 12/19

Example 2: SPE 84287 (E. Texas Gas Well)

(3/6)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 13/19

Example 2: SPE 84287 (E. Texas Gas Well)

(4/6)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 14/19

Example 2: SPE 84287 (E. Texas Gas Well)

a. "Log-log Plot" — Specialized hyperbolic "rate-cumulative" type curve (qg/qgi vs. 1(Gp/G)).

(5/6)

b."Cartesian Plot" — Specialized hyperbolic "rate-cumulative" type curve (qg/qgi vs Gp/G).

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 15/19

Example 2: SPE 84287 (E. Texas Gas Well)

(6/6)

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 16/19

Example 2: SPE 84287 (E. Texas Gas Well)

Summary:

●The hyperbolic D and b-parameters are can be

characterized using production data. The ratecumulative formulation should be somewhat better than the rate-time formulations (at least in our experience). ●The new rate relation is given as:

n ˆ ˆ q = qi exp[− Di t ]

●The hyperbolic D and b-parameters are given in terms of the new rate relation as:

1 (1 − n) −n t b≡ n Dˆ i

Note that the D and b-parameters are both given as power law functions — as would be expected.

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 17/19

n−1 ˆ D ≡ Di n t

Recommendations:

●The power law observation of the D-parameter (in

time) must be investigated further. This behavior appears to be universal. ●Plots of the D and b-parameters should be used as part of production data diagnostics. ●(suggestion) A "super-hyperbolic" could be constructed using the basis condition for the hyperbolic relation; i.e.,

⎡ q ⎤ d ⎢ ⎥ perhaps of the form c ≡ − [b] dt ⎣ dq/dt ⎦

CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 18/19

d b≡− dt

CIPC 2008-109 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls

End of Presentation *Department of Petroleum Engineering Texas A&M University College Station, TX 77843-3116 +1.979.845.2292 — [email protected] CIPC/SPE Gas Technology Symposium 2008 Joint Conference — Calgary, AB (Canada) — 17–19 June 2008 Estimating Reserves Using the Arps Hyperbolic Rate-Time Relation — Theory, Practice and Pitfalls (Ilk/Rushing/Blasingame) T.A. Blasingame — Texas A&M University (19 June 2008)

Slide — 19/19

D. Ilk, Texas A&M U. J.A. Rushing, Anadarko Petroleum Corp. and T.A. Blasingame,* Texas A&M U.