envision courthouse square - Arlingtonva

Report 2 Downloads 117 Views
N. VEITCH ST. AND 14TH ST. N. • Improved and re-graded gateway treatment. • Redesign stairs and ramps to improve accessibility. • Use topography and stairs to celebrate entrance. • Integrate landscaping and water to enhance the pedestrian experience. • Redesign the space to feel open, safe and inviting.

N. Courthouse Rd.

N. Veitch St.

St.

N. Uhle. St.

hle.

N. Veitch St.

N. U

14th St. N. 14th St. N.

STUDY AREA NEW

15th St. N.

14th St. N.

14th St. N.

14th St. N.

STUDY AREA

STUDY AREA

NEW

NEW

PUBLIC

• Improved and re-graded gateway treatment. • Redesign stairs and ramps to improve accessibility. • Use topography and stairs to celebrate entrance. • Integrate landscaping and water to enhance the pedestrian experience. • Redesign the space to feel open, safe and inviting.

15th St. N.

15th St. N.

14th St. N.

C

Crossroads Concept Gateway Treatment

N. Courthouse Rd.

• Enhance existing connection. • Redesign stairs and ramps to improve accessibility. • Integrate landscaping and water to enhance the pedestrian experience. • Redesign the space to feel open, safe and inviting.

B

Gateway Treatment Traditional Concept

Concept

N. Uhle. St.

A

Enhance Connection

Concept

N. Veitch St.

Concept

N. Courthouse Rd.

#7

PUBLIC

PUBLIC

TBD Examples of steps with seating and landscaping

Water feature and stairs with plaza above

Lincoln Center, NYC

Bilbao, Spain

Elevated Acre. NYC

Considerations • Costs associated with infrastructure and regrading of street and sidewalks. • Subsurface and structural impacts to garage. • Accessibility and access for all users. • Safety, visibility,and lighting. • Challenging slopes on 14th St. N.

ENVISION COURTHOUSE SQUARE where people come together

Harbor Steps, Seattle, WA

Considerations • Costs associated with infrastructure and regrading of street and sidewalks. • Subsurface and structural impacts to garage. • Accessibility and access for all users. • Safety, visibility, and lighting. • Challenging slopes on 14th St. N. • Significant treatment will require redevelopment of Court Square West and AMC Theatre.

Feedback results will be available online. Visit sites.arlingtonva.us/courthouse

Considerations • Costs associated with infrastructure and regrading of street and sidewalks. • Subsurface and structural impacts to garage. • Accessibility and access for all users. • Safety, visibility, and lighting. • Challenging slopes on 14th St. N. • Significant treatment will require redevelopment of Court Square West and AMC Theatre.