NOTE: 1. UTILITY LOCATIONS AND SIZES ARE APPROXIMATE. CONTRACTOR TO WORK WITH STATE PARKS TO LOCATE UTILITIES. CONTRACTOR TO VERIFY SIZE AND TYPE OF UTILITY.
LEGEND E
E OHP
S
S
W
W
BURIED ELECTRIC POWER LINE OVERHEAD POWER LINE BURIED SEWER LINE BURIED WATER LINE WATER SPIGOT
100% Design Draw in Not Fo gs r Cons t r u Plo t D ction ate: 9/11/20 16
A
EXISTING CONDITIONS 0
60'
120'
Scale NO.
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: Layne Jensen
09/16
APPROVED
Matt Call
DATE
09/16
CHIEF ENGINEER
FILE PATH & NAME
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
DESIGNER:
09/16
DRAFTER: Lon Franson
09/16
DRAFTER: Conna Rohbock
Eric Dixon
09/16
PROJECT ENGINEER
SHEET
FERRON CANAL & RESERVOIR COMPANY 09/16
MILLSITE DAM REHABILITATION
PROJECT MANAGER
Eric Dixon
STATE OF UTAH DIVISION OF WATER RESOURCES
09/16
EMERY
RE263
COUNTY
APPL. NO.
STATE PARK EXISTING CONDITIONS
M1
NOTES: 1.
2.
LEGEND
TREES TO REMAIN WHERE POSSIBLE. OBTAIN APPROVAL FROM ENGINEER PRIOR TO REMOVAL OF ANY TREE.
BREAKUP CHIP SEAL BEFORE FILL PLACEMENT
BREAKUP CHIP SEAL PRIOR TO PLACEMENT OF FILL. NO PIECES GREATER THAN 6-INCHES IN ANY DIRECTION TO REMAIN.
3.
SALVAGE FOR REUSE ANY TABLES, GRILLS, AND FIRE PITS WITHIN THE FILL AREA.
4.
ALL CONCRETE AND DEBRIS WITHIN THE FILL AREA TO BE REMOVED AND MUST BE DISPOSED OF IN AN APPROVED LANDFILL.
5.
BOULDERS PLACED TO PROTECT UTILITIES OR OTHER IMPROVEMENTS TO BE SALVAGED AND REPLACED.
6.
SALVAGE BOULDERS IN DEMOLITION AREAS FOR REUSE TO MATCH EXISTING.
REMOVE GRASS PRIOR TO FILL PLACEMENT
ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 t o D N
DEMOLITION PLAN
B
0
60'
Plo
120'
t
Scale NO.
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: Layne Jensen
09/16
APPROVED
Matt Call
DATE
09/16
CHIEF ENGINEER
FILE PATH & NAME
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
DESIGNER:
09/16
DRAFTER: Lon Franson
09/16
DRAFTER: Conna Rohbock
Eric Dixon
09/16
PROJECT ENGINEER
SHEET
FERRON CANAL & RESERVOIR COMPANY 09/16
MILLSITE DAM REHABILITATION
PROJECT MANAGER
Eric Dixon
STATE OF UTAH DIVISION OF WATER RESOURCES
09/16
EMERY
RE263
COUNTY
APPL. NO.
STATE PARK DEMOLITION PLAN
M2
ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 t o N tD Plo
C
EARTHWORK PLAN 0
60'
120'
Scale NO.
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: Layne Jensen
09/16
APPROVED
Matt Call
DATE
09/16
CHIEF ENGINEER
FILE PATH & NAME
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
DESIGNER:
09/16
DRAFTER: Lon Franson
09/16
DRAFTER: Conna Rohbock
Eric Dixon
09/16
PROJECT ENGINEER
SHEET
FERRON CANAL & RESERVOIR COMPANY 09/16
MILLSITE DAM REHABILITATION
PROJECT MANAGER
Eric Dixon
STATE OF UTAH DIVISION OF WATER RESOURCES
09/16
EMERY
RE263
COUNTY
APPL. NO.
STATE PARK EARTHWORK PLAN
M3
100% Desig n Draw Not Fo ings r Con struct Plo t D ion ate : 9/11 /2
016
LEGEND ELECTRICAL PEDESTAL AND WATER SERVICE, ACTUAL LOCATION DETERMINED BY STATE PARKS
NOTES: 1. CONTRACTOR TO VERIFY PIPE SIZE AND TYPE BEFORE ORDERING MATERIALS. 2. ALL SPRINKLER SYSTEM CONNECTIONS TO CULINARY WATERLINE TO HAVE BACKFLOW PREVENTION, PER CODE. 3. PLACE 4 INCHES OF 3/4-INCH GRAVEL IN FILL AREA WHERE GRAVEL IS CURRENTLY LOCATED.
D
STATE PARK IMPROVEMENTS PLAN 0
15'
30'
60'
Scale NO.
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: Layne Jensen
09/16
APPROVED
Matt Call
DATE
09/16
CHIEF ENGINEER
FILE PATH & NAME
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
DESIGNER:
09/16
DRAFTER: Lon Franson
09/16
DRAFTER: Conna Rohbock
Eric Dixon
09/16
PROJECT ENGINEER
SHEET
FERRON CANAL & RESERVOIR COMPANY 09/16
MILLSITE DAM REHABILITATION
PROJECT MANAGER
Eric Dixon
STATE OF UTAH DIVISION OF WATER RESOURCES
09/16
EMERY
RE263
COUNTY
APPL. NO.
STATE PARK IMPROVEMENTS PLAN
M4
gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 : Not lot Date
STATE PARK IMPROVEMENTS PLAN
E
0
15'
30'
P
60'
Scale NO.
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: Layne Jensen
09/16
APPROVED
Matt Call
DATE
09/16
CHIEF ENGINEER
FILE PATH & NAME
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
STATE OF UTAH NATURAL RESOURCES Division of Water Resources
PIPE O.D. PLUS 24" MIN.
BOAT RAMP CONNECTION
DATE
INITS.
REVISIONS
WARNING
0
1 2
SCALE: AS SHOWN
DATE
DESIGNER: F. Last
09/16
\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\State Park Details
2" x 6" CONCRETE WEDGE ANCHOR AT 60" O.C. (NUT WELDED AFTER TIGHTENING)
1. STAFF GAUGE TO BE BOLTED TO WESTERN SIDE OF BOAT RAMP. 2. STAFF GAUGE TO EXTEND FROM ELEVATION 6220.5 TO 6150.0 OR LOWEST POINT POSSIBLE. 3. WELD BEAD AT 1-FOOT VERTICAL ELEVATION AS SURVEYED. 4. INCLUDE MEAN SEA LEVEL ABOVE WELDED BEAD LINE AND LOCAL DATUM BELOW. LOCAL DATUM IS MEAN SEA LEVEL MINUS 5160 FEET.
IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE
DESIGNER: F. Last
09/16
DRAFTER: L. Franson
09/16
DRAFTER: F. Last
V
Not To Scale
APPROVED
F. Last
DATE
09/16
E. Dixon
PROJECT ENGINEER
STATE OF UTAH DIVISION OF WATER RESOURCES
09/16
MILLSITE DAM REHABILITATION 09/16
BOAT RAMP STAFF GAUGE Not To Scale
SHEET
FERRON CANAL & RESERVOIR COMPANY
PROJECT MANAGER
E. Dixon 09/16
6217 1057
TRENCH UNDER ASPHALT
CHIEF ENGINEER
FILE PATH & NAME
x 6" STEEL PLATE
1
12" MIN.
COMPACTED NATIVE SOIL
T
6218 1058
2"
NOTES:
3 4" MINUS COMPACTED TO 95% ASTM D698
6"
6" MINIMUM COMPACTED ROADBASE
1
ROADBASE COMPACTED TO 95% ASTM D698
EXISTING CONCRETE RAMP
6219 1059
PIPE O.D.
4" MIN.
6" MIN. ROADBASE IN PAVED AREAS
6" MIN.
DOWEL 4 INCHES INTO EXISTING CONCRETE. ANCHOR REBAR WITH ENGINEER APPROVED EPOXY. MINIMUM SPLICE LENGTH OF 24 INCHES. ROUGH FINISH TO MATCH EXISTING BOAT RAMP SURFACE NEW CONCRETE RAMP (4,000 PSI)
ELEVATION NUMBERS WITH LEGIBLE WELD BEAD (WELDED AT 1 FOOT VERTICAL INTERVALS)
PLACE TACK OIL BEFORE PLACING NEW ASPHALT (by others)
ASPHALT BY OTHERS (MATCH EXISTING ASPHALT THICKNESS)
6"
#4 @ 12" O.C. EACH WAY
Not To Scale
6220 1060
ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 D N ot Plo