flea market open public space

895

VISUALISATION

895

MORPHOLOGY THROUGH TIMELINE

before 1956

895

1956-2013

since 2013

Linear Hierarchy

Homogeneous Emptiness

Overwhelming Implication

Saint Jacob’s church is the main element in the hierarchy of the square. Space of the square is subordinated and oriented to the volume of the church and works complementary to it.

Aſter demolition of the square ensemble the spatial organisation of Zuzemberk’s center stands seriously damaged. Center of town’s public activity is replaced by meaningless emptiness. All the social functions form periphery of the hollow space occasionally occupied by car parking.

Pavilion standing on the border of the church’s footprint forms and meantime connects two public spaces with different programs. The first one is the open space for fairs, markets etc. equal to the old square. The second one is more intimate eastern green and shadowed part of existing Zuzemberk central square.

The footprint of the church remains abandoned and is therefore succeeded by the trees.

Pavilion only points the center of the whole square. The main approach is reached by the space itself. Organised before according to the dominancy of the church’s belltower, the spatial structure of the square is now rethought in terms of horizontal relation.

MORPHOLOGY THROUGH SYMBOLS

Vertical/horizontal

Conversation with god/conversation with community

895

Re-thinking of the square centerpiece. Hierarchy and vertical subordination of the St. Jacob’s church belltower are replaced by horizontal connections of multifunctional ‘architecton’ which acts as urban furniture object, fairground unit and place of social activities.

Re-thinking of the space for communication: lapidary orthogonal rows of pews is the only literal visual symbol of the church standed on this plot before. This visual code of the past is overlayed on the green carpet of the existing park.

PROGRAM

895

H

FL

EA

MA RK

ET

OP PU EN SP BL AC IC E

EVEN TS

FA OR IRG IZ RO ON UN TA D L C UR ON BA N N EC FU TI RN ON ITU S RE

SYM COMM BOL UNITY PE CON

PAR K

G VERS REE WS SO ATIO N CIA N P LIZ U S HAD BL ING OW SHAIC S DOW PA SHA CE DOW TREES & GRASS

The entire complex is permeable for the activities of the surrounding town, each extension conceives to establish the most appropriate and stimulating connection.

MASTERPLAN 1:500

895

FLOOR PLAN 1:100

895

3000

8000

3400

0

3000

SECTIONS 1:500

895

Section A—A

Section 1—1

EAST FACADE 1:100

895

▼6.100

▼5.500

▼0.450 ▼0.150

CROSS SECTION 1:100

895

▼6.100

▼5.500

▼0.450

LONGITUDINAL SECTION 1:100

895

EXPLODED DIAGRAM

895 laminated plywood

wooden beams 150x150 mm

plastic mirror

glulam

laminated plywood

glulam

OBLIGATORY VIEWS

1

895

2

1

2

VISUALISATION

895

VISUALISATION

895

VISUALISATION

895

VISUALISATION

895

VISUALISATION

895