GRAHAM CONSTRUCTION COMPANY IMMC PICU 2ND FLOOR ADDITION INTERIOR BUILD OUT
REVIEWED
REVIEWED AS NOTED
REVISE AND RESUBMIT
REJECTED
VOID
FOR RECORD ONLY
These documents have been reviewed for general compliance with the plans and specifications. Final responsibility for above lies with the supplier. Date: 8/5/2016 By: Matt Hendrickson Graham Construction - DSM 421 Grand Avenue Des Moines, Iowa 50309 515-645-9520
PROJECT IMMC PICU/Flex Unit Build-Out PROJECT # 415573-0 SPEC SECTION 08 8000 SUBMITTAL# 08 8000-02 DATE 8/9/2016 BY Noah Diemer ✔
Product Data Shop Drawing
ACTION
Sample
Furnish as Submitted
This review is for general conformance with the design concept of the project and general compliance with the information given in the contract documents, corrections or comments made on the submittals during this review do not relieve the contractor from compliance with the requirements of the plans and the specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated at the jobsite; information that pertains solely to the fabrication process or to the means, methods, technique, sequences, and procedures of construction; coordination of the work of all trades; and for performing all work in a safe and satisfactory manner.