Date:
A B C D E F
- General amendments - Structure amended - Drainage added - Rwp updated & SVP added - SVP, Structure & Layouts amended - Substation/gates updated - GL 15 updated G - SVP A-01 location changed - RWP's location changed H - Plant in abeyance / columns adjusted following workshop with Walkers
27.05.16 15.06.16 22.06.16 15.07.16 05.08.16 24.08.16
- Service riser added - Plant room revised - Drainage stacks layout updated J - Drainage stacks layout updated K - Floor Gullys updated L - SS A-11 location updated
28.09.16 HA
I
Permeable block paving inside flush conservation kerb detail see landscape drawings
D
E
G
F
One Way
H
K
J
be confirmed with fire brigade
L
P
Q
R
S
T
U
Permeable block paving inside flush conservation kerb detail see landscape drawings
Y X
refer to landscape architect's drawings for external materials and planting details
E-01
C refer to landscape architect's drawings for external materials and planting details
Block B SVP B-01
RWP 5
RWP 2
3
2
RWP 6
2
FG
SVP B-10
FG
Fire Cabinet
1
RWP 22
RWP 21
13 12 11
6
10
7
9
Shell & Core Provision Location Indicative SS G-10
Post
RWP 19
RWP 20
Service riser
6
Office 5
AOV
SVP C-??
Single 1 No. spaces
15
14
13
12
11
10
9
Post
Post
Shell & Core Provision Location Indicative
14
8
2
3
4
5
6
7
16 x 169 = 2,700
5
15
SS C-02
8
9
10
11
12
13
14
15
2 No.
Office 1
le ng o. i S N 2
SVP B-04 SVP B-03
SVP A-11
E-04
8
SS G-02
SVP A-??
SS A-11
SS A-08
SS A-09A SVP A-09
SVP A-08
FG
FG
SVP C-04 SVP B-08B
Doubles 38 No. spaces
Shell & Core Provision Location Indicative
SS G-03
SVP B-08 SS B-08
SS Shell & Core Provision Location Indicative
SS B-10
Shell & Core Provision Location Indicative SS B-07B SVP B-??
SS G-05
SVP C-03
SVP C-08
SVP C-08A
21
7
SVP C-11
RWP 11
SS C-08
Shell & Core Provision Location Indicative
SS C-11
8
SVP C-11A
SVP C-07
SVP C-05
Switch
SS C-05
Shell & Core Provision Location Indicative
23
Shell & Core Provision Location Indicative SS G-09
Shell & Core Provision Location Indicative
Y
Office 2 BCWS PUMPS
BOILERS
Plant
13 CONTROLS
13 Refer to UKPN drawings for substation details and louvre and door spec
LTHW SECONDARY PUMPS & PHE'S
THERMAL STORE
PU
Water meter kiosk. Located to miss openings in wall / not fixed to the wall as not ours
15
RWP 3
14
1,997
RWP 4
12
RWP 13
FG
BT
15
11 RWP 14
Gas Meter
14
10
FLUE
FG
RWP 15
Plant room louvre and door spec TBC
RWP 16
E-02
RWP 8
RWP 7
RWP 17
RWP 18
NOTE: SVP & FG to be confirmed by M&E
Fire rated doors to be provided at rear to limit risk of external fire spread
Party wall detail and position to be finalised pending more detailed survey information
B
C
D
V
N
A
P
Q
R
S
T
U
W
0
B
C
X
22
Sub
Potential dividing wall by fit-out contractor
CW STORAGE TANK
11 12
Office 3
RWP 12
Office 4
SVP B-12 SS B-12
Potential dividing wall by fit-out contractor
LTHW PRIMARY PUMPS
3 E-0
10
SVP C-06 SS B-07 SVP B-07
FG
A 9
SS A-09B
SS A-10 SVP A-10
22
SS G-07
SVP B-05
SS G-04
SVP C-??
SS G-08
Doubles 34 No. spaces
FG
Bike Store E-05
9
4 No.
2 No.
Doubles 48 No. spaces
Bike Store
Shell & Core Provision Location Indicative
SVP A-07
Bike
Bike
SVP A-04
Bike Store E-06
SVP A-05 SS A-05
SVP C-10 FG
E-07
3 No.
7
5
SVP C-02
8
SS A-03 SVP A-03
4
Fire Cabinet
16 x 169 = 2,700
Bike
Bike
3
A RO
Fire Cabinet
7
6
5
4
3
2
1
6
2
4 No. spaces
SS G-01
4
SS G-11 1
Shell & Core Provision Location Indicative
SVP A-01
3
RWP 10
RWP 9
SVP B-11
SVP A-12
5
SS B-02 FG
FG
FG
4
Commercial Bin Store
SS B-01
SS A-02
1
vent duct
RWP 1
Block C
SVP B-02
16 x 169 = 2,700
SVP A-02
Access arrangements and gate positions to be confirmed with fire brigade
Site V OUT
D
Block A
1
03.10.16 HA 04.10.16 HA 19.10.16 HA
W
Flush conservation kerb detail
B
A
N
M
Flush conservation kerb detail
Site IN
21.09.16 GG
Permeable block paving
C and gate positions to Access arrangements
A
14.09.16 HA
E-08
B
HA GG HA HA HA GG
AM SH RE G
AP LA CE
Revision:
D
E
F
G
H
J
K
L
M
1
2
3
4
5m
10m
N
FOR COMMENT
r gp
Proposed Ground Floor Plan (General Arrangment)
Architects · Project Managers · Quantity Surveyors 74 Wells Street London, W1T 3QQ Tel: 020 3137 2197, Fax: 0116 204 5801 email:
[email protected], www.rg-p.co.uk
Project:
Client:
NOTE: Drainage and RWP strategy tbc by M&E consultant Structural column layout to be finalised by Struc Eng
Sheet title:
Ref:
Gresham Road, Brixton
Taylor Wimpey South Thames
Proposed Ground Floor Plan GA
L4188
011L
Scale:
1:100 @ A0
KEY SVP's / Stub Stacks pipes
Date:
11.05.2016
SVP's / Stub Stacks pipes above RWP - Rain Water Pipes RWP - Rain Water Pipes above
Drawn:
Checked:
HA/GG
-
Stub Stacks for future provision Floor Gully Dry Riser Outlet connection
All dimensions to be checked on site. Do not scale off drawing. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.