INSTALLATION INSTRUCTIONS 110 WIRING BLOCK INSTALLATION ...

Report 1 Downloads 146 Views
Category 5e KMJ Snap-in Jack INSTALLATION PROCEDURE Made in the USA

1. Remove 50-60 mm (approx. 2-2.5 in.) of cable sheath and polyester tape taking care not to damage the conductor insulation. 2. Press the cable into the slot at the back of the jack; align the sheath to the base of the IDC blocks. 3. Initially insert Blue pair in IDC slots 5, 4 and Green (or Orange) pair in IDC slots 6, 3. 4. Ensuring that the twist in the wires is maintained up to the IDC slot, insert Brown pair in IDC slots 7, 8 and Orange (or Green) pair in IDC slots 1, 2. 5. When wires are correctly positioned, use the impact tool set to LOW to make final connection. 6. Snap completed jack into the faceplate. NOTE: Stuffer caps may be used in lieu of termination tool to seat contacts in IDC slots if termination tool is not available.

STEP 1

STEP 2

STEP 3

N1246

10550301 Rev C 4254

Hold the cable and jack between the thumb and forefinger, untwist each pair and terminate them in the order shown in the Termination Table on back.

Category 5e KMJ Snap-in Jack INSTALLATION PROCEDURE Made in the USA

1. Remove 50-60 mm (approx. 2-2.5 in.) of cable sheath and polyester tape taking care not to damage the conductor insulation. 2. Press the cable into the slot at the back of the jack; align the sheath to the base of the IDC blocks. 3. Initially insert Blue pair in IDC slots 5, 4 and Green (or Orange) pair in IDC slots 6, 3. 4. Ensuring that the twist in the wires is maintained up to the IDC slot, insert Brown pair in IDC slots 7, 8 and Orange (or Green) pair in IDC slots 1, 2. 5. When wires are correctly positioned, use the impact tool set to LOW to make final connection. 6. Snap completed jack into the faceplate. NOTE: Stuffer caps may be used in lieu of termination tool to seat contacts in IDC slots if termination tool is not available. 10550301 Rev C 4254

STEP 1

STEP 2 N1246

STEP 3

Hold the cable and jack between the thumb and forefinger, untwist each pair and terminate them in the order shown in the Termination Table on back.

Category 5e KMJ Snap-in Jack INSTALLATION PROCEDURE Made in the USA

TERMINATION TABLE Stuffer Caps

Category 5e Jack

Faceplate (Top)

Assembly rotated for improved visualization

WIRE COLOR

IDC REAR CONNECTOR TERMINAL

T568A

T568B

2

GREEN

ORANGE

1

WHITE / GREEN

WHITE / ORANGE

4

BLUE

BLUE

5

WHITE / BLUE

WHITE / BLUE

3

WHITE / ORANGE

WHITE / GREEN

6

ORANGE

GREEN

7

WHITE / BROWN

WHITE / BROWN

8

BROWN

BROWN

JACK TERMINAL LAYOUT (TOP VIEW)

BROWN

GREEN/ ORANGE

8

7 6

3

2

1 4

5

ORANGE/ GREEN

BLUE

NOTE: Installer MUST follow EIA/TIA 568 Installation Guidelines throughout the installation to Maintain Category 5e Compliance.

N1246

10550301 Rev C 4254

5290 Concourse Drive • Roanoke, VA 24019 USA Phone: 540-265-0690 • TOLL FREE 800-622-7711 Fax: 540-265-0724 • www.occfiber.com

Category 5e KMJ Snap-in Jack INSTALLATION PROCEDURE Made in the USA

TERMINATION TABLE Stuffer Caps

Category 5e Jack

Faceplate (Top) 10550301 Rev C 4254

Assembly rotated for improved visualization

WIRE COLOR

IDC REAR CONNECTOR TERMINAL

T568A

T568B

2

GREEN

ORANGE

1

WHITE / GREEN

WHITE / ORANGE

4

BLUE

BLUE

5

WHITE / BLUE

WHITE / BLUE

3

WHITE / ORANGE

WHITE / GREEN

6

ORANGE

GREEN

7

WHITE / BROWN

WHITE / BROWN

8

BROWN

BROWN

JACK TERMINAL LAYOUT (TOP VIEW)

BROWN

GREEN/ ORANGE

8

7 6

3

2

1 4

5

ORANGE/ GREEN

BLUE

NOTE: Installer MUST follow EIA/TIA 568 Installation Guidelines throughout the installation to Maintain Category 5e Compliance.

N1246

5290 Concourse Drive • Roanoke, VA 24019 USA Phone: 540-265-0690 • TOLL FREE 800-622-7711 Fax: 540-265-0724 • www.occfiber.com