Installation Of - Amazon Simple Storage Service (S3)

Report 8 Downloads 92 Views
• Founder of OSHA Safety  Partnership • Safety performance far  exceeds industry average • Safe work environments Safe work environments • Exclusive training and  tools • Safe and productive  teams Regular site visits by • Regular site visits by  safety managers

• Strategic approach • Flexible solutions • Multi‐phase support 

• • • • • •

Engineering / Design Construction Repair Testing M i t Maintenance Emergency response

• • • •

Compressor stations Meter stations Pump stations p Interconnects

Gathering systems Pipeline replacement Pipeline replacement Feasibility studies Engineering and design I t ll ti Installation Expansion Modification Bellhole excavation Interstate and  intrastate continuity intrastate continuity • Right of way restoration • Emergency services • • • • • • • • •

• Gas distribution mains – High‐ and low‐pressure  conversions – Hot/wet tapping and  line stopping – Live gas tie‐ins Live gas tie‐ins • Meter and regular  replacements  • Appliance re‐lights Appliance re‐lights • Joint trench – Electric – Telecommunications • Maintenance • Emergency response • Riser installation Riser installation

• Pipeline inspection, maintenance and repair • Annual maintenance programs

• Pipeline retrofit • Anomaly excavation A l ti • Inspection and documentation • Repair and replacement

• Cathodic protection • Pipeline recoating Pipeline recoating • Linear anodes

• Hydro test support • External Corrosion Direct Assessment (ECDA)

• Industry pioneer Industry pioneer • One of largest HDD contractors in the world • Relied on by: – Pipeline companies Pi li i – Utilities  – Engineering firms – Owners • Owns and operates more than 50 drilling rigs of  all sizes all sizes

Installation Of • Pipeline  – Up to 60 inches  in diameter • Conduit • Cable • Remediation wells

Continuously Bores Up to 8,000 Feet