Total Waste

2015/16 26,638 tonnes

Total Waste

2000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16

2005/06 45,189 tonnes 2006/07 35,310 tonnes

50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0

 14,000

tonnes per annum IN  Redruth 55 tonnes OUT  Geraldine 21 tonnes OUT  Temuka 10 tonnes OUT  Commercial ?? tonnes OUT



Site Waste Redruth 85% Geraldine 5% Temuka 7.5% P. Point 2.5%

Redruth site – 18,000 transactions per annum

INCOMING - TONNES  Kerbside 4,900  Transfer station 400  Commercial 200

 MOU

with WTL

 Timber

diversion

 Produces

industrial

charcoal  Enables waste sort trials

 Stormwater  Leachate

 Capping  For

both new cells and remediation of closed landfill areas