John Street RFP Responses Design Presentation Design Presentation
April 2013 April 2013
a t t n
JOHN STREET DEVELOPMENT SITE
B
B
o
k
l
y
n
MAIN STREET B
r
i
d
EMPIRE FULTON FERRY
g
OPEN
e
t
t Water Stree
Jay Street
Empire Stores
e Plymouth Stre
treet Washington S
Tobacco Warehouse
Main Street
OPEN
BROOKLYN BRIDGE PLAZA
e
o
g
r
d r i
BROOKLYN BRIDGE PARK
JOHN STREET
York Street
DUMBO
B25
F
PIER 1
OPEN Pier 1 Development Sites
Old QE
Fu
B
lto
nS
tre
et
B69
Squibb Park & Bridge
High Street
A C
Heights Columbia
omenade
2 3
BROOKLYN HEIGHTS
Brooklyn
PIER 3
PIER 4
A C
Clark Street
Heights P r
Furman
Street
R I V E R
PIER 2
E A S T
High Street
DOWNTOWN BROOKLYN
Interim Greenway
Montagu
e Street
PIER 5
MONTA GUE ST COMME RCIAL C ORRID
R
OR
OPEN
Court Street
2 3 Borough Hall
Joraleman Street
4 5
PIER 6 Pier 6 Development Sites
OPEN
Columbia
Street
B63
Atlantic
Avenue
ATLAN T
IC AVE
COBBLE HILL
COMM
ERCIAL
CORR
IDOR
John Street site description • Located on vacant lot just east of Manhattan Bridge Located on vacant lot just east of Manhattan Bridge • Site is 130’ by 74’ with footprint of 9,600 sq. ft. • Development controls: D l t t l o
Up to 130 residential units comprising 101,000 sq. ft. of residential space
o
Ground floor retail and up to 110 parking spaces
o
Maximum height of 130 ft.
John Street Park Illustrative Plan Illustrative Plan
John Street development site
10 Jay Street (Existing)
RFP goals • Enliven northern entrance of the Park • Create a high-quality, visually appealing residential development • Seamlessly integrate with the Park and surrounding community • Generate revenue to support the maintenance and operation of the Park • Achieve LEED certification
J h St John Streett RFP Ti Timeline li • November 05, 2012:
Received feedback from Committee on Design/Const.
• December 17, 2012:
Release of Request for Proposals (RFP)
• January 23, 2013:
Information session and site visit (90 attendees)
• March 11, 2013:
Submissions due (11 proposals received)
• May 28, 2013:
Presentation to the CAC
• June 28, 2013:
Design feedback provided by CAC
• Summer 2013:
Select winning respondent
Team 1 Brooklyn Bridge Park John Street RFP
2
PROJECT DESCRIPTION
View facing West
f
View facing South
GYM
RETAIL
1,150 SF
MECHANICAL 680 SF
RESIDENTIAL LOBBY 520 SF
RESTAURANT TERRACE 1,000 SF
RETAIL
CAR HOIST
CAFE 915 SF
ENTRANCE
SCALE: 3/32” = 1’-0”
Ground floor plan
View facing east
Team 2 Brooklyn Bridge Park John Street RFP
View facing east
View facing east
“CASSETTE” 3 BR
“CASSETTE” 1 BR
RETAIL DINING
OPEN TO BELOW
RETAIL MEZZANINE
OPEN TO BELOW
LOBBY PARKING RETAIL
LOBBY (+7’ / At Grade)
PODIUM (+13’ / From Sea Level)
Mezzanine (+21’)
Ground floor plan
View facing northwest
View facing west
View facing east
Team 3 Brooklyn Bridge Park John Street RFP
View facing southwest
View facing east
Ground floor plan 0'
20'
View facing north
Team 4 Brooklyn Bridge Park John Street RFP
View facing southeast
View facing east
Ground floor plan
View facing south
Team 5 Brooklyn Bridge Park John Street RFP
View facing south
View facing northwest
South facade detail
East facade detail
Ground floor plan
Team 6 Brooklyn Bridge Park John Street RFP
View facing southeast
View facing northwest
Facade joint detail
Ground floor plan
View facing south
Team 7 Brooklyn Bridge Park John Street RFP
View facing south
View facing east
PARK SERVICES BIKES
RETAIL
LEASING & MGMT RESIDENTIAL LOBBY (+5')
BLDG SERVICES BLDG SERVICES
SERVICES REFUSE
RETAIL
POP UP RETAIL FARM SHOP
RA M UP P
JOHN STREET
Ground floor plan
PEARL STREET
MAIL
View facing northeast
Team 8 Brooklyn Bridge Park John Street RFP
View facing northeast
GGP-TA John Street LLC
RiverPark
Facade detail
Terrace
:12 R amp 1
Retail
Mechanical/ Storage
Shed
Retail Service
Pets
Mail
Lobby RESIDENTIAL UNITS COMMON SPACE AMENITIES RETAIL TERRACE SUPPORT/MECHANICAL