June 5, 2017 Presented by: Deb Galardi

Report 4 Downloads 62 Views
June 5, 2017

Presented by: Deb Galardi



SDC Component/Costs



SDC Schedule



Summary of Findings

2

Reimbursement Fee • Costs of existing or in-process facilities • Related to available capacity • Exclusive of grants & contributions

Improvement Fee • Projects included on an adopted list • Related to capacity for growth

Compliance Costs • SDC methodology development • Master planning

3 3

Description Supply Pump & Storage Delivery Upper Elevation Infrastructure Planning Other

Combined Cost $8,935,378 $5,164,396 $11,149,091 $5,589,999 $291,830 $207,661

Unit Cost 1 $2,308,883 $1,334,469 $2,880,902 $1,444,444 $75,408 $53,659

Total

$31,338,356

$8,097,766

1

Cost divided by 3.9 mgd

2

Unit cost X 0.000605 mgd

SDC per EDU 2 Potable Nonpotable $1,396 $1,396 $807 $0 $1,742 $1,742 $873 $0 $46 $46 $32 $32 $4,896

$3,216

EDU = Equivalent Dwelling Unit

4 4

Meter Size 3/4" 1" 1 1/4 1 1/2" 2" 3" 4" 6" 8"

Potable SDC $4,896 $8,323 $12,240 $16,157 $25,949 $48,961 $81,765 $161,572 $259,494

Nonpotable SDC $3,216 $5,467 $8,040 $10,613 $17,044 $32,159 $53,706 $106,125 $170,443

Factor 3/4" 1.0 1.7 2.5 3.3 5.3 10.0 16.7 33.0 53.0

5 5

 Revised fee of $4,896 for a ¾” meter is $1,352 less than the current SDC (for potable) – Revised project list excludes new water treatment plant and large storage reservoirs

 A new SDC of $3,216 per EDU proposed for non-potable system – Excludes pumping, storage and upper elevation costs 6

7