Section 2 - Fire Column to be encase in fire rated wall board to satisfy regulations. Any disturbed fire resistant elements are to be made good in a manner that is in compliance with the required performance for that element.

North

Building Warrant Notes Engineering services installations shall be in accordance with the Building Standards (Scotland) Regulations Oct 2010. Building classified as ’Type 1’ in accordance with Part 0.4.1 of the Building Regulations. Building overall height approx.6.7m Section 1 - Structure See seperate drawings and calculations.

54

Section 3 - Enviroment All new windows to be provided with trickle vents. Eaves and roof space to be naturally vented using uPVC vent tiles at min 2000mm c/c. All U-Values to be in compliance with Part 6.2. See seperate sheet for U-Value calculations. Superm arket

Downtakings All existing walls are plumb, free from cracks, bulges and other distortions and defects. All demolition work to conform to BS 6187: 1982 and the HASAW etc Act: 1974. Prior to the removal of any loadbearing or supporting walls, the existing structure must be adequately propped and must remain so until all the alteration work is complete and cured.

62

nk Ta

58 60

54 56

28

26

2

4

2

2

68

67

57

3720 2096

2096

26 28

External Door: Painted timber door, to match existing lower level entry door. New patio door as per specialist design - please find attached manufacture's details from Sidey Glazing.

UP

1 50001-4

988

Ceiling Height 2600mm

Wall to achieve max U-value of 0.18W/m2k. See attached manufacture's U-Value calculations for details.

37 38

Ceiling Height 2600mm

17

1622

19

3720

Bedroom

4

2860 3854

External Walls: Roughcast render finish on External Cavity wall, to match existing construction in colour and finish. New build external wall to be constructed from external rendered leaf of 140mm medium dence concrete blockwork, 25mm vented cavity, 100mm Celotex CG4000 Insulation and inner leaf of 100mm internal blockwork, finished internally with a 12.5mm British Gypsum plasterboard sheet (installed on dabs) and paint finish. (U-value achieved = 0.18W/m2k.) 58

4020

4020

14 m² 149.8 SF

2710

956

Dotted line indicates line of vent in external wall, and duct path under existing staircase from new extractor hood.

4 Bedroom

UP

1

1500

1500

3750

2620

2920

2920

4100 2860

2700

60

3854

72

956

Smoke Alarm Location

1

SD

3

Ceiling Height 2600mm

Concrete strip foundations,. Trenches to be free of all builders' debris and soil. All soft spots dug out and filled in a lean mix concrete well tamped down. Backfill on completion. All Foundations to be as per S.E. drawings.

25

Ceiling Height 2600mm

26

Dotted line indicates line of new install cooker extract hood.

9 m² 101.0 SF

Lobby

BALVAIRD PLACE

7 Corridor

2700

119

Foundations:

Ceiling Height 2600mm Ceiling Height 2600mm

115 117

Shelte r

3170

107 109

76

Ceiling Height 2400mm

103 105

87 89

84

Current Level 1 Kitchen relocated down to new Level 0 as shown, gas supply to be redirected to suit.

83 85

62

9 m² 97.6 SF

Dining Room

79 81

74

11 m² 116.8 SF

Kitchen

1

3 Bedroom

3

5 Bedroom

Dotted line indicates line of new pipework to existing S.V.P. To be installed to manufacurers recommendations

Ceiling Height 2600mm

23

Ceiling Height 2600mm

Bathroom

24

Current Location of S.V.P. This is also to be used to service kitchen in new location.

78

4 m² 43.6 SF

Plumbing Installation 3.7.1Sanitary pipe work to be installed and constructed in accordance with BS EN 12056-2:2000. Safe working practices should be observed at all times. Building Control to be informed in writing prior to commencing works. All demolition to BS 6187 and the Health & Safety AT Work Act 1974. All work to the satisfaction of local authority regulations. Main contractor to ensure all adequate propping and shoring. DPCs to be provided to all window and door openings. DPCs within perimeter walls to be minimum 150mm above ground level. All timbers to be pressure impregnated with preservative. All drainage to be to the satisfaction of the local authority inspector. Do not scale any drawing. Contractor to verify all dimensions and levels on site.

MUIRT ON

6 Bathroom

Ceiling Height 2600mm

17

WC, WHB, & bath to be connected to existing SVP by means of a saniflo system. all pipes and fittings to be installed to manufacturers recommendations

Ceiling Height 2600mm

19

Living Room Ceiling Height 2600mm

13 14

86

BW(20)003

88

16 m² 176.7 SF

BALHOUSIE STRE ET

8 m² 84.9 SF

3

35

2 Living Room

52

CARNEGIE PLACE

1 Kitchen

Load bearing Wall removed between Level 0 and Level 1. Beam fitted at u/s of Level 1 floor, supported from nibs either side and to create downstand - Nib and support detail to be as per Structural Engineer drawing 500001-7. New beam arrangement creates downstand with clear headheight of at least 2200mm from FFL.

50

El Sub Sta

Current External door and window removed, replaced by new lintel and patio doors, details as per Structural Engineer drawing 500001-6.

4270

All electrical installations to be in accordance with Part 4.5.1 and inline with BS 7671 :2001 as amended. 4.5.2 Circuits designed to operate at or below low voltages (50 Volts AC or 120 Volts DC) should be protected against direct and indirect contact with any other circuit operating higher than at extra low voltage. 4.8.5 Outlets and controls for electrical fixtures and systems to be positioned at least 350mm away from internal corners, projecting walls or other similar obstruction. Outlets and controls for electrical fixtures and systems to be positioned not more than 1.2m above floor level unless the need for a higher level can be demonstrated. Light switches to be positioned at a height of between 900mm and 1200mm. Standard switched unswitched socket outlets to be positioned at a height of at least 400mm above the floor level and at least 150mm above a worktop, fixture or other obstruction. Where socket outlets are concealed separate switching should be provided in an accessible position.

33

1370

37

2700

1370

Superm arket

1360

Ceiling Height 2600mm

33 35

3

1326 1060

BW(20)007

Lobby

4

4932

BW(20)003

new tilt / turn window unit with double glazing to achieve a min 1.4 W/M2K to be provided with proprietary rubber gaskets with full extent of window opening and trickle vents. cill height to be 850mm, however existing brick wall provides min 900mm barrier.

1

Level 0 - current

2

1 : 50

Dashed line indicates service from Level 01 Gas Boiler, To be taken in ceiling void and used to service heaters in new extension and in Level 00 corridor.

Level 0 - proposed 1 : 50

1200

1378

External Window: Timber windows, frames painted while as per existing on both levels. Please find attached manufacture's details. 4 BW(20)007

All new glazing meets required U-value of 1.4W/m2k, as stated in the Building Regulations for extensions to existing properties. Lintels: Masonary to be built / tied back, cut and made good to relevant health and safety recommendations. Lintels to be installed to the manufacture's instructions / recommendations and in accordance with the Structural Engineers details.

Scale 1:50

5m

Status: Rev A: 20.03.11

BUILDING WARRANT Details amended to follow comments received from Building Control and details received from Structural Engineer

Mr and Mrs Grant 6 - 8 Carnegie Place, Perth

PC Cills: Robslee type pre-cast cill for paint finish to match existing. DPC sweated to all unexposed faces. Floor: Carpetted finish to 65mm Sand / Cement Screed, Separating layer of Grade B1F of polythene sheet (not less than 125 micron / 500 guage) ontop of 125mm Celotex FF40000, on 1200 Gauge DPM. 100mm Concrete Floor Slab below, set on layer of 150mm sand and hardcore. (Uvalue achieved = 0.15W/m2k). Floor to achieve max U-value of 0.15W/m2k. See attached manufacture's U-Value calculations for details. Roof: 12.5mm British Gypsum wall board on 50x50mm battens for decoration to Client's requirements, laid flat. 140mm Kingspan Thermapitch TP10 between 195x45mm rafters kept clear of underside of sarking board by 50mm to allow natural ventilation. Marley Roof tile laid over Roofshield roof sheeting on timber sarking board. Timber facias and soffits. (Rafters laid at 400mm to achieve U-value of 0.18W/m2k - 600mm max as noted on S.E. drawings.) Roof laid at a pitch of 23deg to follow manufacture's guidelines.

0

37

Roof to achieve max U-value of 0.18W/m2k. See attached manufacture's U-Value calculations for details. RWP Goods: Grey rainwater goods to RAL colour match existing. Marley 68mm Circular downpipes and Deepflow semi-elliptical gutter to new extension, as per attached manufacture's information. Air Tightness All perimeter joints to door and window openings to be fully caulked and sealed in accordance with manufacturer’s printed guidance and accepted good practice to minimise air infiltration in the external envelope.

Level 0 Plan - Current and Proposed Project number Date

2011 - 01 Jan 11

Drawn by Checked by

BW(20)001 Scale

rg sig

A As indicated