Malone XtraLight Trailer - Malone Auto Racks

Report 12 Downloads 114 Views
MPG525G

Malone XtraLight Trailer TM

Model MPG525G Assembly Instructions

Take a few moments and read through these instructions to familiarize yourself with the step by step assembly process before you begin turning wrenches. Unpack and sort the components into groups as shown in the following pages. Then assemble each group in order. Lets get started !! Required Tools: • • • • • •

(2) 3/4” wrenches Large flat blade screw driver Razor knife Wire stripping tool Lug wrench Electrical tape

• • • • •

(2) 9/16” wrenches (a deep socket is recommended) (1) 7/16” wrench Pliers Electrical connector crimping tool Small hammer

Visit us at maloneautoracks.com for more fine products and accessories. [email protected] 800-295-0042 ext 206

1

MPG525G

Group 1: Frame Components

Bag 11430

Group 2: Axle / Spring Components

2

Bag 11432

[email protected] 800-295-0042 ext 206

MPG525G

Group 3: Lighting Components

Group 4: Fender Components

Bag 11431

Group 5: Coupler Components

Bag 11494

[email protected] 800-295-0042 ext 206

3

MPG525G

Group 6: Load Bar Components

Bag 11433

FRAME ASSEMBLY (Group 1) 1. First we will build the 2 piece tongue. The middle of the tongue has symmetrical holes for the joining plates. The forward end of the tongue has holes for the coupler. 2. Get the wiring harness out of the light kit. Un-kink the last 6 feet of the 20 foot harness. Un-kink the entire 4 foot harness. Wrap the 2 ends of the long harness together with electrical tape.

3. Stand the front tongue section on end with the coupler holes up. Push a wire protection grommet into the wiring harness hole as shown. 4. Pass the entire harness through the grommet and out the top of the tongue as shown. 4

[email protected] 800-295-0042 ext 206

5. Stretch out the white wire on the connector and leave 2-3 inches more green/brown/yellow wire outside the grommet as shown. (This length of harness will be the connector to your tow vehicle). Tie a knot in the wire so it can’t slip back inside.

MPG525G

6. Make sure there are no tangles, then feed the taped harness tip down through the tongue. Carefully pull all the wire out the bottom. Set the front tongue section aside.

7. Stand the rear tongue section up on end with the joining holes down. Feed the short harness into the wiring harness hole in the side of the tongue and down and out the bottom. 8. Lay the tongue halves end to end with the joint ends together. 9. Make sure there are no tangles in the harness. Start a spiral wrap of electrical tape about 4” from the end of the short harness. 10. Lay-in the end of the long harnesses alongside and continue wrapping for about 2”-3”. 11. Taking careful notice that there may be a sharp edge on the inside of the hole, gently feed the harness into the tongue while pulling the short harness back out bringing the long harness with it. 12. Once you have pulled the tape joint and the end of the long harness outside of the hole, untape the short harness and set it aside. 13. Slip a wire protection grommet over the wire and snap it into the hole. Then continue pulling the harness out. [email protected] 800-295-0042 ext 206

5

MPG525G 14. Being careful not to pinch the wiring harness, square the tongue half ends together and install the joining plates on each side. (Note the rear tongue section is symmetrical so it works fine either way. It has no top and bottom.) Fully tighten the 1/2” bolts with two 3/4” wrenches. NOTE: We begin assembling the frame upside down, later we will flip it over to complete the assembly. 15. Layout the frame components as shown, “upside down”. (a) The spring bracket mounting holes in the side rails must face up. (b) The tongue mounting holes in the middle of the front two cross members must face up. (c) The MALONE decal is on the rear cross member and must be upside down. (d) The mid-cross member must face the same way as the rear cross member. (e) Spring hangers with shackle bolt holes to the front, slippers to the back. (f) Carriage bolts to mount cross members to rails. (g) Regular bolts to mount spring hanger brackets.

a

a

e

d

c

b

d

a

b e a

g

f

16. Install all 12 carriage bolts, finger tighten only. Install all 8 spring hanger bolts with the nuts inside the frame. Fully tighten the rear spring hangers. Finger tighten the front spring hangers.

6

[email protected] 800-295-0042 ext 206

17. Lay the tongue onto the frame, with the MALONE logo upside down. Support the end of the tongue so it lays nearly flat on the front and mid cross members.

MPG525G

18. Install the long 1/2” bolt through the front cross member, (washer under the bolt head), nut inside the cross member and finger tighten. Install the short 1/2” bolt inside the end of the tongue, (washer under the bolt head), nut inside the cross member and finger tighten. 19. Fully tighten all 12 carriage bolts. Then fully tighten the two 1/2” tongue mounting bolts.

SPRING AND AXLE ASSEMBLY (Group 2) 1. Set the envelope containing the manufacturer’s certificate of origin (MCO) and VIN labels aside in a safe place. 2. Find the side of the axle with the spring centering holes. These holes mate with the spring center stud.

4. Run each nut down UNTIL IT NEARLY TOUCHES THE PLATE ONLY! DON’T FULLY TIGHTEN NOW!! You may need to wiggle the springs to fit them into the spring brackets in the next step. [email protected] 800-295-0042 ext 206

7

MPG525G 5. Lift the axle/spring assembly to the trailer frame and slide the slipper spring ends into the slipper spring brackets. Then let the spring eyes down into the front hangers.

6. Install the shackle bolts with the nuts to the inside and tighten until firm. Do not over tighten which would bend the spring hanger in and pinch the spring. 7. Fully tighten the 4 front spring hanger mounting bolts. 8. Fully and evenly tighten the 8 axle U-bolts. 9. Install the wheels on the hubs with valve stems facing out and install and finger tighten the lug nuts. 10. Lift the trailer at one rear corner and roll it over onto the tires. ALWAYS BEND FROM YOUR KNEES WHEN LIFTING. IF THE TRAILER IS TOO HEAVY FOR YOU TO FLIP SAFELY RECRUIT SOME FRIENDS TO ASSIST YOU. 11. Tighten the lug nuts firmly, to 75 to 85 foot pounds of torque. 8

[email protected] 800-295-0042 ext 206

•Yellow = left turn / left brake •Green = right turn / right brake •White = ground ATTENTION MPG460XT

CUSTOMER ADDENDUM TO LIGHTING AND WIRING PROCEDURE

12. Route the wires to the rear along the frame. LISTED BELOW ARE THE PROPER STEPS TO INSTALL THE WIRING - ExitCAME the frameWITH via the slotted hole TRAILER under the lampLIGHT bracket. KIT. THAT YOUR - Use wire clips to secure the wires. Bring the wires to the tail lamps, add 10 inches more LIGHTS to serve as extra for PREWIRED service work, andAS cut there. Coil the extra. YOUR ARElength NOT PICTURED AND REQUIRE

THESE MINOR STEPS.

FOLLOW THE REST OF THE ISTRUCTIONS TO COMPLETE YOUR 1. Attach the tail lamp brackets to TRAILER. FEEL TO CONTACT MALONE WITH ANY the frame PLEASE as shown using 3/8” FREE x 1” carriage head bolts and nuts. No QUESTIONS washers 13. Stripare 1/2”needed. of insulation off the ends of all 4 tail light wires.

-2.Slightly twist the the license exposed copper Sandwich plate mounting strands to stiffen them. bracket between the leftSlightly!! side lamp and the SIDE AMBER LIGHT Not too much as the strands of copleft side tail lamp bracket. Attach the tail SEEper PAGE 9 stiffer straight lightare using thewhen nuts more provided with the lamp and willmount need the right stiffness the kit. you Then sideinlamp. next step. To make inserting the brown wire easier, insert the end of a paper clip into the small lower hole.

2a. 1A Insert a brown wire included in the wiring kit into the rear of the amber side lamps as shown.

14. There are holes in the back side of each lamp marked by wire color. 3. Use the 3 holes just above the 2A

-spring Identify whichto hole is forthe amber bracket mount which color wire. Then side lamps. Put the stud through carefully push theand twisted the forward hole the wire wire straight into the through the rear hole.corTuck the wire responding hole. You will so the lamp sits flush on the frame. feel wirehole slideisunder the Thethe middle unused. wire gripper inside the lamp as you push the wire into it. Once the wire is pushed in it 13will not come back out. Tug gently to check for a good connection. Repeat on the other side.

[email protected] 800-295-0042 ext 206

PLEASE SEE REVERSE SIDE FOR TAILLIGHTS

16

[email protected] 800-295-0042 ext 206

- Exit the frame via the slotted hole under the lamp bracket. - Use wire clips to secure the wires. Bring the wires to the tail lamps, add 10 inches TAILLIGHTS MPG460XT more to serve as extra length for service work, and cut there. Coil the extra. SEE PAGE 10 12. Route the wires to the rear along the frame. - Exit the frame via the slotted hole under the lamp bracket. - Use wire clips to secure the wires. Bring the wires to the tail lamps, add 10 inches more to serve as extra length for service work, and cut there. Coil the extra. 3A 13. Strip 1/2” of insulation off the ends of all 4 tail light wires. - Slightly twist the exposed copper strands to stiffen them. Slightly!! Not too much as the strands of copper are stiffer when more straight and Strip you will need the stiffness in the 13. 1/2” of insulation off the next step. ends of all 4 tail light wires. - Slightly twist the exposed copper strands to stiffen them. Slightly!! Not too much as the strands of copper are stiffer when more straight and willare need theinstiffness the of each lamp marked by wire color. 4A 14. you There holes the backinside next step. - Identify which hole is for which color wire. Then carefully push the twisted wire straight into the corresponding hole. You will feel wire slide under theback side of each lamp marked by wire color. 14. the There are holes in the wire gripper inside the lamp as you push thehole wireisinto - Identify which for it. Once the wire is pushed which color wire. Then in it will not come out. Tug carefully pushback the twisted gently to check a corgood wire straight intofor the connection. Repeat on the responding hole. You will other side. feel the wire slide under the

wire gripper inside the lamp as you push the wire into it. Once the wire is pushed in it will not come back out. Tug gently to check for a good 16 connection. Repeat on the other side.

16

[email protected] 800-295-0042 ext 206

[email protected] 800-295-0042 ext 206

LIGHT ASSEMBLY (Group 3)

MPG525G

REFERENCE: Trailer Wiring Color Code •Brown = running lights •Yellow = driver turn / driver brake •Green = passenger turn / passenger brake •White = ground 1. Sandwich the license plate mounting bracket between the driver side lamp and the frame. Use the nuts provided with the lamp kit. 2. Install side marker lights at the 2 holes in the front of the side rails. One hole for the bolt, one hole for the wire. Use the nuts provided with the lamp kit. 3. Check that the wiring harness outside the tongue grommet at the coupler is still full length and did not pull into the tongue. 4. Route the GREEN/BROWN wire along the passenger’s side of the frame. Route the YELLOW/BROWN wire along the driver’s side. Install wire clips beside the tongue and clip the wires. 5. Route each harness around the corner to the side marker light. Note where you will connect the side marker wire. Lift the harness on top of the frame. Pierce the knife tip between the wires, PULL only about 1/2” of wire past the blade, then use your fingers to pull 2-3 inches of wire apart. 6. Press the brown wire into the quick connector as shown. Then insert the wire from the side marker light fully into the 2nd opening. Use pliers to squeeze the conductor blade down and through the insulation. The blade cuts through the insulation and connects the wires inside. Flip the cover to lock the connector. Repeat on the other side again using the brown wire. [email protected] 800-295-0042 ext 206

9

MPG525G 7. Route the wires to the rear, through the middle cross member and along the frame. Install wire clips to secure the wires between the cross members. 8. Route the harness around the corner and allow the same length harness as the length of the tail light wires. Triple check that the wires are routed where you want them. Cut the harness. 9. Using your fingers, separate about 1” of the ends of the harness. Strip about 3/8” of insulation off each wire to allow length for wrapping around the stiff tail light wire. 10. Hold the color matching harness and tail light wires together with the end of the stripped insulation even with each other, then wrap the harness wire clockwise around the tail lamp wire completely covering it. 11. Screw a wire nut down over each until firm. Then tuck the wire into a frame clip as shown.

FENDER ASSEMBLY (Group 4) 1. Loosely install fender mounting brackets as shown so they can move to fit the fender. Use hex bolts with the nuts inside the frame. 2. Install and fully tighten fender. Use screws and nuts, nuts inside fender. 3. Fully tighten fender mounting brackets.

10

[email protected] 800-295-0042 ext 206

COUPLER ASSEMBLY (Group 5)

MPG525G

1. Installing the ground wire ring connector. Strip 3/8” of insulation off the white ground wire and crimp on the ring connector as shown. 2. Assemble the tongue skid to the safety chains with a 3/8” x 1-1/2” bolt as shown. Use washers above and below the chain ends. 3. Place the skid and chain assembly under the tongue and insert the bolt up through the skid bolt hole on the bottom of the tongue. 4. Slip the ring terminal over the bolt and install the nylon lock nut finger tight. 5. Check that the rear end of the skid is in its hole on the bottom of the tongue. Tighten the BOLT while holding the nut stationary. This way the ring terminal remains straight. 6. Install the coupler onto the tongue. Then tighten until the coupler firmly grips the tongue. Don’t over tighten and crush the coupler.

LOAD BAR ASSEMBLY (Group 6) 1. Slip a pair of load bar brackets over each load bar as shown with mounting holes to the middle and install the carriage bolts finger tight only. Rippled side of load bars go up.

[email protected] 800-295-0042 ext 206

11

MPG525G 2. Use a small hammer or block of wood to install the end plugs into both ends of all four load bar support tubes. 3. Install the load bar support tubes onto the outer most pair of holes in the front and rear cross member and fully tighten. 4. Install the load bars and brackets onto the load bar supports. Center the load bars and fully tighten all load bar bolts. 5. Use a small hammer or block of wood to install the end caps onto the load bars.

Apply the TIRE AND LOADING Decal and the VIN Decal as shown below onto the driver side of the frame. Be sure to clean the frame before applying the decals.

Your XtraLight TM Trailer is now complete and ready to register and title ! Contact your local DMV office for specific procedures in your State.

Visit us at maloneautoracks.com for more fine products and accessories. 12

[email protected] 800-295-0042 ext 206