This  document  was  created  by  Regen  SW  in  Partnership  with  Invest  Northern   Ireland.  The  replicaCon  of  this  report  or  any  of  its  contents  without  the  prior   consent  of  Regen  SW  or  Invest  Northern  Ireland  is  prohibited.  To  use  any  part  of   this  document,  please  gain  consent  from  Regen  SW  Offshore  Renewables  team:  

November  12  

Nicholas  Kirsop-­‐Taylor  [email protected]     Johnny  Gowdy  [email protected]  

1  

Marine  Energy  Supply  Chain  Model       3 main threads:

• Technology Development • Commercial Deployment • Manufacturing

Supply  chain  knowledge   exchange

Potential Uses of Supply Chain Model Economic  /   Value  Analysis  

• Value     • Skills  

Main   AcCviCes  

• Assets   • CapabiliCes  

Core  AcCviCes  

Skills   Requirement     Analysis    

Asset  Register  /   Requirements  

• Type  of  Company     Sub  AcCviCes  

Codes  of   best  pracCce  

Capability/  Gap   Analysis    

Company  Database  

Within   Scope  of   Project    

• Company  name   • Address   • Contact  Details   • Website   • Type  of  company    

Please  visit  the  online  marine   company  database  here  :   hSp://www.regensw.co.uk/directory/  

2  

Commercial Deployment

Copyright Regen SW, Invest NI

3  

Technology Development Concept   TRL1-­‐2  

Concept  validaCon   TRL  3-­‐5  

Concept  model  is   created  

Concept  design  

Prototype   TRL  6-­‐7    

Prototype    device    is   fabricated  

DemonstraCon   TRL  8-­‐9  

DemonstraCon  device (s)  are    fabricated  

CommercialisaCon   Devices    are  producCon   manufactured   QMS  

Concept   engineering  

Fundamental   Engineering    &  design    

CAD  rendered  

Business  Plan  

Cost  model   Proof  of   concept   Legally  patent   concept  IP  

Engineering    &  design   improvement  

Engineering    &  design   opCmisaCon  

Sea  trials  in  grid  /non-­‐ grid  connected,  part/full   scale,  nursery  test  sites  

Single  (or  small  array)   deployments  at  grid   connected,  full  scale,   demonstraEon  sites    

Mooring  system   designed  &  tested    

Mooring  system   finalised  

Power  takeoff   designed  &  tested    

IntegraCon    of     Power  take-­‐off      

TesCng  in   simulated   environments   Computer  modelling   –  Matlab,  CFD,  ANSYS   Aqwa,  Paramarine   etc    

IntegraCon    of  Control  subsystem  

Secure Funding (relevant at all stages)

Early  array     interacEons     understood  

Scale  effects  are  accounted  for   Maximise  power   producEon  

Maximise  power   producEon   Power  export   designed  and  tested  

Grid  connecEon   designed  and  tested  

Market Analysis

O&M  &  HSE   protocols  are   designed  and  tested  

3rd Party Data Validation/ due diligence Copyright Regen SW, Invest NI

Power  export   integrated  

Engineering  &  design   opCmisaCon   Early  commercial   arrays    (10-­‐20  MW)  

O&M    &  HSE   protocols  are   finalised   Array  interacEons     accounted  for   Cost  reducEon  through:   • InnovaCon   • Economies  of  scale   • CumulaCve  learning  &   knowledge  sharing   • Supply  chain  opCmisaCon   • Falling  subsidy  support  

Grid  connecEon     finalised  

Grid  connecCon   opCmised    

Proof  of  technology,   warranCes  offered.   (post  TRL  9)  

Sell  into  global  export   markets  

Sales and Marketing

Subsidy Reduction

Concept  

Concept   ValidaEon    

Prototype  

DemonstraEon  

CommercialisaEon  

TRL    1-­‐2  

TRL  3-­‐5  

TRL  6-­‐7  

TRL  8-­‐9  

Investment  cost   £50-­‐100,000  

Investment  cost   £0.5-­‐2M  

Investment  cost   £10M  

Investment  cost   £20-­‐30M  

Scale  1:25-­‐100  

Scale  1:10-­‐25  

Scale  1:1-­‐10  

Scale  1:1-­‐1.25  

1:1  

3-­‐5MW  Early  arrays  

10-­‐20MW   commercial  arrays  

• DemonstraCon   leased  sites  

• Commercial  leased   sites  

• UniversiCes   • Inventors  

• Hydrodynamic  test   tank  faciliCes     • UniversiCes   • NaREC   • Component  test   faciliCes    

• FabTest   • EMEC   • Wave  Hub   • Single  devices   • OEM’s  

Copyright Regen SW, Invest NI

-­‐  

Commercial  Deployment   Development  &   Consent    

InstallaCon  

OperaCon  &   Maintenance  

Decommissioning    

Project  planning  

Site  preparaCon  

OperaCons    

Decommissioning    

Obtain   permissions  

InstallaCon   management   and  support  

Maintenance    

Removal  and   relocaCon    

Resource   characterisaCon   studies   Conduct  Project   technical  design    

Install   foundaCon/ reacCon   subsystem   Devices  

Environmental   surveys   Legal  and  public   relaCons   Financial   elements   IdenCfy     supporCng   infrastructure  

Electrical   connecCng  

Commissioning  

Cables  

Place  orders  

Copyright Regen SW, Invest NI

Disposal    

Commercial  deployment:     Development  and  Consent   Development  &   Consent  

Project  planning  

IniCal  feasibility   study  

Obtain   permissions  

Crown  Estate   lease    

Resource   characterisaCon   studies   Environmental   surveys  

Conduct  Project   technical  design    

Wave  &  Cdal    resource     assessment  &   modelling  

OperaCon  &   Maintenance  

InstallaCon  

MMO  license   Specialist  resource   assessment   equipment  

Geophysical  and   Geotechnical   survey  

Conduct  and   compile  EIA  

Benthic  organism   survey  

Pelagic  fish   survey  

Cetacean  and  sea   mammal  survey  

Contract   specialist  vessels  

 Onshore   environmental   survey  

 Coastal  process   survey  

Ornithological   survey  

Socioeconomic   impact  survey  

Contract  project   management  firms  

Conduct  FEED   study  

Electrical  connecCon   designed  and  built  

Ports  and  O&M   faciliCes  

Landward   infrastructure  

IdenCfy  and   develop  supply   chain  

Place  Orders  

Order  devices  &   foundaCons  

Order  subsea   hubs  

Order  cables  and   connectors  

Legal  and  Public   relaCons  

Meteorological   survey  

IniCal   environmental   scoping  

IdenCfy   supporCng   infrastructure  

Financial   elements  

Decommissioning    

Source  and  manage   project  finance   Legal  support    

Financial  management   and  due  diligence   Stakeholder  &  public   engagements  

Grid  connecCon   assessed    

Project  accountancy   NegoCate   contracts  

HSE    cerCficaCon   and  management    

Project  insurance   Manage  PR  &   Media  relaCons  

Copyright Regen SW, Invest NI

Pre  project   accreditaCon  

Commercial  deployment:  InstallaCon   Site   Development  &   Project  Consent  

OperaCon  &   Maintenance  

InstallaCon  

Site  preparaCon    

Conduct  drilling    

InstallaCon   management  and   support    

Provide  installaCon   project  management  

Install   foundaCon/ reacCon  system    

Conduct  Civil   Engineering  works      

Remotely  operated   vehicle  and  diver   support  services  

Sea  based  support   vessels  

Specialist  vessels  install   device  foundaCons  

Devices    

Mobilise  devices   from  ports  

Electrical   connecCng    

Install  offshore   substaCons  

Commissioning    

Decommissioning    

Device  or  array  is   connected  and   commissioned  

Vessels  tow,   transport  and   install  devices  

lay  export  and   array  cables  

Supplying  temporary   pontoons  

Device  and  cable   connecCons  made  

Handover  agreed   between  supplier  and   operator  

Copyright Regen SW, Invest NI

Management  of   installaCon  health   and  safety    

Commercial  Deployment:   OperaCon  and  maintenance   Site   Development  &   Project  Consent  

Contract  operaCon   technicians  

Accommodate  crew   and  technicians  

OperaCon  &   Maintenance  

InstallaCon  

Conduct  physical   device  inspecCons    

O&M  port  based   scheduled  &   unscheduled  O&M  

Monitor  device   performance  

OperaCon    

In-­‐situ  scheduled  &   unscheduled  O&M    

Contract  maintenance   work  boats  

Supply  HSE   equipment,   chandlery  and  store   spare  components  

Maintenance  

Copyright Regen SW, Invest NI

Decommissioning    

Commercial  Deployment:  Decommissioning   Site   Development  &   Project  Consent  

Restore  seabed  to  original   state  

InstallaCon  

Decommissioning  vessels   and  crews  contracted  

OperaCon  &   Maintenance  

Decommissioning  sea   based    structures  

Electrical  components   and  cables   decommissioned  

Reusable  elements  are     removed  and  relocated  

Unwanted,  un-­‐recyclable     elements  disposed  of  

Copyright Regen SW, Invest NI

Unwanted,  reusable   elements  are  recycled  

Decommissioning    

Decommissioning    

Removal  and   relocaCon    

Disposal    

Manufacture   Hydrodynamic   Subsystem   Blades  -­‐   Hydrofoils  

ReacCon   Subsystem  

Gearbox  

FoundaCons   FoundaCon   structure  

Structural   Hydrodynamic   components  

Flow   augmenter   Oscillator   Low  head   turbines  

Moorings   Mooring   cables   Cable   fastenings   Gravity     anchor/base  

Control   Subsystem    

CondiCon/health   monitoring  system  

Device  Structure   Subsystem   Device   structural   protecCon  

Power   transmission   Cooling   systems  

Yaw  system  

AnC  fouling  coaCng/ corrosion  protecCon  

Pitch  system  

Seals  

Brakes  

Electrical   subsystem  

Device   operaCons  

Oils  and   lubricants   Power   conversion   Power   condiConing  

Small  engineering   parts  

LighCng  

Compressors  

Personal  access  &   safety    systems  

Copyright Regen SW, Invest NI

Offshore   substaCon  

Cables  

Cable   protecCon   Electrical   connecCons   Assembly  and   IntegraCon  

O&M   facilitaCon  

Hydraulics  

Switchgear  

Onshore   substaCon  

Array  and   export  cables   Fasteners  

Power    export  

Balance  of  Plant    

SubstaCons  

Device  housing  

SCADA  system  

Generator  

TransiCon   piece  

Point  absorber  

Hydraulic   aSenuator  

Bearings  

FloaCng   components  

Overtopping  

Submerged   pressure   differenCal  

Power  take  off   Subsystem  

Device   instrumentaCon  

11  

Company Classification System 1.0  Technology  developers   Tidal  energy  developers   Wave  energy  developers   Wave  and  Tidal  project  developers  

2.0  DemonstraCon  sites   3.0  Research  capabiliCes   UniversiCes   Research  and  InnovaCon  

4.0  Consultantcy  services   MulCdisciplinary  consultancies   Environmental  Consultancies   Renewable  Energy  Consultancies   Naval  architects  and  Design  Consultancies   Project  Management   Oceanographic  and  Geotechnical    Consultancies     Planning  Consultants     Business  Consultants  

5.0  Engineering  

7.0  Composites   Composite  design     Composite  manufacture  and  fabricaCon  

8.0  Marine  OperaCons  and  Subsea  Support   Marine  OperaCons,  contract  and  management  services  

InstallaCon   Subsea  operaCons  and  diving   Vessels,  workboats  and  work  barges   Offshore  operaConal  support     Marine  warranty  services  and  InspecCons  

9.0  Ports,  Port  operaCons  and  Land  based  support   Ports   Ships  chandlers  and  marine  supplies   Ship  repair  and  maintenance   Docking,  pontoons  and  craneage     LogisCcs,  transfers  and  stevedoring  

10.0  Skills  and  Training   Further  EducaCon  colleges  

Marine  Engineers  

Training  centres  and  providers  

Civil  and  construcCon  engineers  

11.0  Financial,  legal  and  support  services  

Electrical  engineers     Mechanical  engineers   Specialist  engineers   ConsulCng  engineers  

6.0  Manufacturing  and  Components  

Financial   Insurance   PR  and  CommunicaCons     Health  and  safety   Legal  

Manufacturing  and  FabricaCon   Raw  Materials  

Components   Electrical  and  electronics   Hydraulics   Measurement,  communicaCons  and  instrumentaCon   Cables   Original  equipment  manufacturers    

12