MATC OREM CONSTRUCTION QUANTITIES \ 254 South 600 East, Suite 104 Salt Lake City, Utah 84102
Abbreviations:
Date: March 28, 2017
B&B
Ball & Burlap
Cal CT CY Gal LF LS SF
Caliper Count Cubic Yards Gallon Linear Feet Lump Sum Square Feet
General Notes: The quantities shown on this proposal are based upon the landscape plans dated 1/27/2017. This bid schedule is provided for estimating purposes only. Contractor shall be responsible for providing their own estimates and quantities based on the most current construction drawings.
Mobilization MATERIAL GRASS SOD 8" of Top Soil ROCK TO MATCH EXISTING 12" of Top soil 12" CONCRETE CURBING
LS SF DEPTH (ft) TOTAL QTY Unit 32,503 N/A 32503 SF 32,503 0.667 803 CY 3,702 0.333 46 CY 3,702 1 138 CY 124 LF 124 LF