McBean Stadium Renovation Status as of July 2017

Exterior Vision

Interior Vision

Proposed Elements at Buildout

Completed to Date • Phase 1 – Field renovation – Backstop netting – Dugout expansion

• Phase 2A – ADA path of travel, parking lot renovation – Landscape berm

Proposed Phase 2B

Proposed Phase 3

Proposed Phase 4

Proposed Phase 5

Potential Costs PHASE 2B: Approximately $420,000 • New dugouts • Temporary covered picnic areas on left and right field lines • Temporary fencing PHASE 3 Approximately $3.8 Million • Replacement center grandstand with concession beneath and press box above • Replacement left and right side grandstands with restrooms beneath • New entry plaza with donor pavers • New donor wall PHASE 4 Approximately $2.5 Million • New left and right side grandstands above dugouts • New permanent cover for picnic areas on left and right field lines • New dual access restrooms on left and right side of entry • New permanent ornamental fencing and gates • New entry element and gates PHASE 5 Approximately $420,000 • New locker room building on left side • Re-worked outfield fence

Next Steps • • • • • • •