This Contemplated Change Order forms part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. Work related to this Contemplated Change Order shall not proceed until written authorization is issued. Provide a detailed breakdown of the additional cost or savings including, material costs, labour times and rates, along with all applicable taxes, permits, licensing fees, bonding, and any additional costs as maybe affected by this change.
Description:
In response to RFI #001 - Existing Ductwork Conflict 1. Revise Cubby layout as per ASK-005 R1. The western duct is to be located in Cubby 251. Ensure access to the western duct is maintained in east and south walls with paint grade plywood access panel. Ensure that eastern duct enclosure aligns with edge of workstation desk. 2. Revise accent carpet layout and paint walls of eastern duct P-2 as per ASK-006 R1. 3. Revise gypsum ceiling and pot light locations for Cubbies as per ASK-007 R1. Change fixture south of eastern duct from a 2x4 fixture to a 2x2 fixture as per ASK-007 R1 and ECCN 03. 4. Revise Cubby Elevations as per ASK-008 R1. 5. Add Booth banquette section detail #4 and fabric specification as per ASK-008 R1. 6. Revise lighting and electrical as per attached ECCN 03. 7. Revise all Type S pendant lights in all Zones per attached ECCN 03.
Attachments:
ASK-005, ASK-006, ASK-007, ASK-008 ECCN 03 (2 pages) Requested by: Contractor Reason: Site Conditions End of CCO
10
11 ZONE B
ZONE A
B
4'-0"
5 A-801
1 ASK-008 6'-11"
2'-6"
6'-11"
6'-11"
W2a
W2a
6'-11"
6'-11"
W2a
W2a
W2a
2
2
1
3
250 Cubby
W2a 5'-3"
W2a
10'-11"
1
3
W2a
249 Cubby
2 W2a 3
3
W5a
ASK-008
W2a
200a Open Office
W2a
251 Cubby
W5a
10'-11"
2
12'-10"
8'-10"
W2a
W5a 4'-10"
4'-6"
1
ALIGN
W2a
6'-7"
200b Open Office
9'-6"
ASK-008
W5a W5a
7'-9"
ALIGN
5'-5"
W5a
KEYNOTES: 1
- ASK-005
2 3
seal
Install 4' x 4' plywood backing in wall to support wall mounted equipment. Center along length of wall, horizontal C.L. at 5'-0" A.F.F. Computer monitor Collaborative seating - supplied and installed by furniture consultant
project name
drawing title
Cubby Plan
McKesson T.I. - Phase 2 This drawing is the property of J. Robert Thibodeau Architecture + Design. A written approbal by J.R.T.A.D. is required priot to any use of this drawing. Contractors must verify all dimensions on site and immediately immediately inform the Architect of all errors and missions.
#:
Date:
Description:
Rev:
138 W 8th Avenue Vancouver (British Columbia) V5Y 1N2 t.778.330.1139 f.778.327.6844 www.goTAD.ca
project no.:
Vancouver Winnipeg Montréal
issued date:
date:
11/26/15
BC-1163
checked by:
Checker 11/26/15
scale:
drawn by:
1/4" = 1'-0" Author rev:
1
ASK-005
1 Cubby Plan ASK-005 Scale: 1/4" = 1'-0"
10
11 ZONE B
ZONE A
F-1
F-1
B
F-2
P-1
F-2
CPT-2 P-1
F-1
P-1
P-1
F-1
CPT-3 P-1
F-2
P-1
P-1
F-2
CPT-2 P-1
P-1
CPT-3
P-1
P-1
F-2
P-1
P-1
F-2
CPT-2
P-1
1'-1 3/4" 1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
P-1 P-1
P-1 P-2
251 Cubby
P-2 P-1
P-1
6'-0"
P-1
4'-6"
250 Cubby
P-1
5'-6"
P-1
249 Cubby
P-1
7'-9"
P-1
P-1
F-1
P-1 P-1
P-1
P-1
P-1
200a Open Office
CPT-3 7'-0"
P-1 P-3
9'-0"
P-1 P-2
P-1
P-2 P-1
P-1 P-1 P-2 P-1
P-2 P-1
200b Open Office
Plan - ASK-006
seal
project name
drawing title
Cubby Finish Plan
McKesson T.I. - Phase 2 This drawing is the property of J. Robert Thibodeau Architecture + Design. A written approbal by J.R.T.A.D. is required priot to any use of this drawing. Contractors must verify all dimensions on site and immediately immediately inform the Architect of all errors and missions.
#:
Date:
Description:
Rev:
138 W 8th Avenue Vancouver (British Columbia) V5Y 1N2 t.778.330.1139 f.778.327.6844 www.goTAD.ca
project no.:
Vancouver Winnipeg Montréal
issued date:
date:
11/27/15
BC-1163
checked by:
Checker 11/27/15
scale:
drawn by:
1/4" = 1'-0" Author rev:
1
ASK-006
1 Cubby Finish ASK-006 Scale: 1/4" = 1'-0"
P-1 P-2
10
11 ZONE B
ZONE A
B
EQ
EQ
EQ
7'-9"
6'-11" EQ
EQ
7'-9"
6'-11" EQ
8'-10"
EQ
7'-9"
EQ 7'-9"
4'-10"
EQ
3'-0"
250 Cubby 7'-9"
251 Cubby 7'-9"
5'-0"
7'-9"
43'-7"
4'-10" 5'-0"
200b Open Office
- ASK-007
seal
project name
drawing title
Cubby RCP
McKesson T.I. - Phase 2 This drawing is the property of J. Robert Thibodeau Architecture + Design. A written approbal by J.R.T.A.D. is required priot to any use of this drawing. Contractors must verify all dimensions on site and immediately immediately inform the Architect of all errors and missions.
#:
Date:
Description:
Rev:
138 W 8th Avenue Vancouver (British Columbia) V5Y 1N2 t.778.330.1139 f.778.327.6844 www.goTAD.ca
project no.:
Vancouver Winnipeg Montréal
issued date:
date:
11/27/15
BC-1163
checked by:
Checker 11/27/15
scale:
drawn by:
1/4" = 1'-0" Author rev:
1
ASK-007
1 Cubby RCP ASK-007 Scale: 1/4" = 1'-0"
200a Open Office
9'-4"
2'-6"
249 Cubby
3'-8"
7'-9"
EQ
7'-9"
EQ EQ
5 A-801
EQ
6'-11"
3'-0"
EQ
6'-11"
1'-2"
6'-11"
3'-0"
5'-3"
8"
2'-2"
2'-4"
1'-2"
9"
2'-3"
2'-2"
1'-2"
8"
2'-6"
3 A-800
2'-8"
1'-4"
2"
2'-5"
2'-7"
2'-6"
2'-4"
1'-5"
2'-4"
2'-10"
10"
6"
#:
1'-1"
1'-4"
1'-5"
11" 6"
F-1
8"
P-1
4 ASK-008
3"
4"
8"
1'-7"
6"
7"
2'-3"
1'-10"
11"
1'-5"
3'-1"
1'-4"
1'-9"
2'-1"
1'-10"
2'-3"
11"
2'-0"
1'-6"
1'-9"
2'-8"
5 A-801 8" 8"
P-1
Description: Rev:
This drawing is the property of J. Robert Thibodeau Architecture + Design. A written approbal by J.R.T.A.D. is required priot to any use of this drawing.
F-1 P-1
P-1
F-1
P-1
3'-5"
3'-11"
PL-1
PL-1
F-2
PL-1
F-2 4'-5"
F-1
3'-9"
P-1
4'-1"
F-1
F-2 4'-1"
P-1 4'-6"
Date:
revisions
PL-1
PL-1
Contractors must verify all dimensions on site and immediately immediately inform the Architect of all errors and missions.
4 ASK-008
client
PL-1 PL-1 project manager
2 A-800
B-1
B-1
B-1
B-1
B-1
B-1
mechanical/electrical engineer
1 Cubbies - North ASK-008 Scale: 1/2" = 1'-0"
2 Cubbies - East ASK-008 Scale: 1/2" = 1'-0"
- ASK-008
- ASK-008
Suite 180 - 200 Granville Street Vancouver BC Canada V6C 1S4 T 604.687.1800 www.integralgroup.com
3"
1'-6"
mechanical/electrical engineer
10'-6" EQ
EQ
12'-5" EQ
2'-4"
5'-0"
3/4" PLYWOOD BACKING 5'-0" 1'-6"
EQ
10'-6"
HIGH DENSITY FOAM BACKING FABRIC AS SCHEDULED WITH INTEGRATED NON-POROUS MOISTURE BARRIER
P-2
P-2 2"
P-3
SEAT WITH ELASTIC WEBBING COVERED WITH MINIMUM OF 2" MEDIUM OR FIRM DENSITY FOAM
6"
3'-6"
3 A-800
P-2
McKesson T.I. - Phase 2 Unit 130 - 10711 Cambie Road, Richmond BC
5 A-801
1'-6"
B-1
3 Cubbies - South ASK-008 Scale: 1/2" = 1'-0"
B-1
B-1
3/4" PLYWOOD LID, HPDL FINISH PL-1 3/4" PLYWOOD FRONT, HPDL FINISH PL-1 3/4" PLYWOOD BOTTOM, HPDL FINISH PL-1
3"
4"
3'-0"
2 A-800
2'-9"
3'-0"
2'-9"
3'-0"
2'-9"
1"
3/4" PLYWOOD BASE, HPDL FINISH PL-1
B-1
- ASK-008
4 Banquette Bench ASK-008 Scale: 1 1/2" = 1'-0"
architect
FABRIC TYPE LEGEND F-1
F-2
FABRIC - MOMENTUM - ODYSSEY - COLOUR: INK. FINISH: SOIL AND STAIN RESISTANT. DURABILITY: 200,000 DOUBLE RUBS. FLAME RESISTANCE: CA BULLETIN 117 2013; UFAC CLASS 1; NFPA 260 CLASS 1; ASTM E84. MAINTENANCE: WS - WATER-BASED CLEANING AGENTS OR FOAM. LIGHTFASTNESS: GRADE 4 AT 40 HOURS.
138 W 8th Avenue Vancouver (British Columbia) V5Y 1N2 t.778.330.1139 f.778.327.6844 www.goTAD.ca Vancouver Winnipeg Montréal
seal
FABRIC - MOMENTUM - ODYSSEY - COLOUR: LIVELY. FINISH: SOIL AND STAIN RESISTANT. DURABILITY: 200,000 DOUBLE RUBS. FLAME RESISTANCE: CA BULLETIN 117 2013; UFAC CLASS 1; NFPA 260 CLASS 1; ASTM E84. MAINTENANCE: WS - WATER-BASED CLEANING AGENTS OR FOAM. LIGHTFASTNESS: GRADE 4 AT 40 HOURS.
project number
BC-1163
drawing title
Cubby Elevations
date scale
sheet number
11/27/15
As indicated drawn by Author checked by Checker
ASK-008 R: 1
MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 www.mmm.ca
NOTICE OF CHANGE # 03 Date: To:
Tel #: File #:
Julia Baker
From:
Cameron Ballard
For Your
Information
(YY.MM.DD)
Fax #:
Thibodeau Architecture
Attn:
15.12.18
ECCN#03
E-Mail: Transmitted by: Review
Comments
E-Mail
As Requested
Page 1 of 2 As Discussed
Distribution
This is not an authorization for extra work. Contractor is to prepare an estimate of the change to the amount of the contract and submit it to the Engineer as soon as possible. Unless authorized by Change Order, if work proceeds, it is at Contractor’s own risk.
RE:
McKesson Phase 2 TI
Reason for change: Architectural changes to Cubby Rooms. Overview of Changes: - Delete one (1) booth at the West side of Cubby 249. - Add one (1) booth at North wall of Cubby Rooms. New booth to be typical power and lighting layout as adjacent booths. - Change one 2’x4’ fixture to 2’x2’ in Open Office area to accommodate mechanical ducts. - Revise ceiling at East side of Cubby 254 to extend drywall further east. Update pot light layout to suit revised ceiling. Description of Changes: Zone A: Lighting: -
Change one light type A to type D. Light to be changed is middle fixture the Westmost row of the Open Office Area closest to the Cubby Room 251. Revise locations of four (4) type E1 pot lights East of Cubby Room 251 to be spaced 4’10” East to West and 3’0” North to South in a rectangular layout centered on the revised drywall ceiling.
Zone B: Lighting: -
Revise location of one (1) type E1 pot light west of Cubby 249 to the new booth along North wall of the Cubby Rooms.
n:\2015\5015785-110 mckesson ti phase 2\electrical\engineering\construction\change orders\eccn 03 - cubby room changes\5015785 eccn 03 (dec 18, 2015).doc
MMM Group Limited
Page 2
Power: -
Delete rough-in for data/tel outlet on West wall of Cubby 249 Add one (1) duplex receptacle in the new booth along North wall of the Cubby Rooms. Revise location of one (1) rough-in data/tel outlet on the West wall of Cubby 249 to the new booth along North wall of the Cubby Rooms.
All Zones: Type S light to be Tech Lighting Soraa Piper Pendant 700 MP Series with 3000k, 8W LED, 48 degree distribution, 0-10V dimming, stem mounted Satin Nickel pedant. Provide all required transformers and wiring for connection to line voltage.
CC:
Per:
Cameron Ballard. EIT MMM Group Limited
n:\2015\5015785-110 mckesson ti phase 2\electrical\engineering\construction\change orders\eccn 03 - cubby room changes\5015785 eccn 03 (dec 18, 2015).doc