Modulating Boilers - Laars

Report 7 Downloads 261 Views
VARI-PRIMETM Installation Kit

Document 7025B

VARI-PRIMETM Installation Kit for

NEOTHERM LC ®

Modulating Boilers Model NTH. Sizes 1000-1700 MBTU/h FOR YOUR SAFETY: This procedure must be performed by a professional service technician, qualified in hot water boiler installation. Improper connections could create an electrical hazard, which could cause serious injury, property damage, or death. VARI-PRIME : A  variable pump control that, when used with a variable speed pump, maintains a user-chosen temperature rise between the inlet and outlet of the boiler. TM

GENERAL PCB OPERATION: 1. The desired Delta T can be set to any of the following values by moving or adding jumpers to the (JP2) terminal on the control: See Figure 2. 15 deg F/8 deg C 20 deg F/10 deg C 25 deg F/13 deg C 30 deg F/ 16 deg C By adding a second jumper, one on “15 deg F” and one on “20 deg F”, it is possible to achieve 35 deg F /19 deg C. By adding a second jumper, one on “15 deg F” and one on “25 deg F”, it is possible to achieve 40 deg F/22 deg C. 2. As shipped, the VARI-PRIME has a jumper on the (JP4) terminal, to operate a 0-10 VDC output. If a 4-20 mA output is needed, move the jumper to the (JP5) terminal. 3. VARI-PRIME can operate in °F or °C. A jumper on the (JP1) terminal has set the default to °F. Remove that jumper for °C. 4 If Main Gas valve is “OFF” AND a call for heat is “TRUE” then the PCB overrides the PID control and runs the pump output at 100% (10 VDC, or 20 mA). 5. Once the Main Gas valve is energized the PCB will maintain pump output at 100% for 60 seconds to allow the system to stabilize. Once the 60 second timer has expired, the PCB will then run the pump output speed based on the jumper setpoint. 6. When “T-T” is satisfied, the PCB will run pump at 100% output for the duration of the pump overrun time. 7. The VARI-PRIME PCB has a low end cap to prevent nuisance low flow trips. The cap is factory programmed to 2 VDC. 8. Factory settings are: Degrees - Fahrenheit Output Signal - 0 -10VDC

INSTALLATION INSTRUCTIONS

H2352500B

P.I.D. CONTROL ADJUSTMENT: With Variable Speed Pumping, the boiler control P.I.D. needs to be adjusted. •  These settings are found in your NeoTherm controls under: Advanced Setup>CH Config>CH Config It is recommended to start with: P = 20 I =15 D = Factory set-point Depending on pump sizing and application requirements; these P.I.D. settings may need to be used to fine-tune boiler performance. •  Once you have adjusted the P.I.D. contols, then disconnect power source from boiler. •  Remove front panels from boiler. •  Pull the sliding panel control straight outward, as shown.

Photo 1

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 800.900.9276 • Fax 800.559.1583 (Customer Advisors) Headquarters: 20 Industrial Way, Rochester, NHService, 03867 Service • 603.335.6300 • Fax 603.335.3355 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 (Applications Engineering) 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

pg 1 of 6

•  Mount the Vari-Prime control box at the top left corner of the control panel as shown in Photo 1 and Figure 1. Pre-drilled holes mark the mounting location.

Pre-drilled holes

Figure 1

Power Connections:

1000 MBTU/h

and

1700 MBTU/h

•  Connect the Blue wire anywhere on the 24V+ boiler Terminal Block (TB3).

H2352500B

•  Connect the Yellow wire anywhere on the 24V Neutral boiler Terminal Block (TB4).

Photo 2

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

pg 2 of 6

1000 MBTU/h •  Connect the White wire to the boiler pump connections on boiler Terminal Block (TB5) across from the other white wire at location 4A.

8

7

6

5

4

3

2

1

8

7

6

5

4

•  Connect the Black wire to the other boiler pump connection on boiler Terminal Block (TB5) at location 3A.

Photo 3

1700 MBTU/h All NeoTherm LC 1700 units include a dry contact that requires an alternate power source. •  Land the field 120V supply onto the #4A boiler pump connection on the boiler terminal block (TB5). •  Connect the Black Vari-Prime wire to the other boiler pump connection on boiler Terminal Block (TB5) at location 3A. •  Connect the white VARI-PRIME wire, the field 120V supply neutral wire, and the customer supplied 120VAC pump relay neutral wires all together. (See wiring diagram on last page).

3

2

1

Photo 4

1000 MBTU/h

H2352500B

•  Locate the Brown wire coming from the top gas valve. Trace the wire to the spade connection with the Blue/White wire. Unplug the connectors and insert the Blue wire and connectors from the Vari-Prime unit. •  Locate the Brown wire coming from the bottom gas valve. Trace the wire to the spade connection with the Blue/White wire. Unplug the connectors and insert the Blue/Red wire and connectors from the Vari-Prime unit.

Photo 5

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

pg 3 of 6

1700 MBTU/h •  Locate the Blue and Black wires coming from the top gas valve. Trace the wires to the spade connection with the blue/white wire. Unplug the connectors and insert the blue wire and connectors from the Vari-Prime unit. •  Locate the Blue and Black wires coming from the bottom gas valve. Trace thse wires to the spade connection with the Blue/White wire. Unplug the connectors and insert the Blue/Red wire and connectors from the Vari-Prime unit.

Photo 6

1000 MBTU/h

and

1700 MBTU/h

Field Connections: •  Remove Vari-Prime Cover. •  Remove the Vari-Prime control box from the packaging and familiarize yourself with each connection point.

TB2 TB5 TB4

4 3 2 1

4 3 2 1

+24V -24V

JP3 JP1 7&8 = F 1&2 = SPARE JUMPER

4-20MA(-) 0-10VDC(+) 0-10VDC(-)

JP5

1 2 3

JP4 TB6

2 4 6 8

Figure 2

2 4 6 8

Jumpers

1 3 5 7

TB1

1 2 3 4 1 3 5 7

PCB DIGITIZED P/N E2345200

4-20MA(+)

TB3

4 3 2 1

R14 C12 R13 C11

LED1

Terminal Blocks

N/O COM N/C

JP2 1&2 = (Delta T) 15 DEG F / 8 DEG C 3&4 = (Delta T) 20 DEG F / 10 DEG C 5&6 = (Delta T) 25 DEG F / 13 DEG C 7&8 = (Delta T) 30 DEG F / 16 DEG C

H2352500B

10K OUTLET SENSOR 10K INLET SENSOR

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

pg 4 of 6

1000 MBTU/h

and

1700 MBTU/h

Field Connections: (continued) •  Using the two (2) supplied thermistor cables, connect one Shielded cable to the 1 and 2 landing points on terminal block (TB2) of the Vari-Prime board. Important: This wire will be run to the OUTLET sensor. •  Connect the other Shielded cable to the 3 and 4 landing points on terminal block (TB2) of the Vari-Prime board. Important: This wire will be run to the INLET sensor.

•  Connect one end of the VFD signal wire to the VFD on the chosen pump as instructed in pump manual. Connect the other end to the 3 and 4 landing points on terminal block (TB3). Important: #3 landing point is for 0-10 VDC (+) and #4 is for 0-10 VDC(-).

H2352500B

•  Tap two ¼” NPT threaded holes into water pipes for the sensors. One in the supply pipe and the other in the return. Both sensors need to be inserted into the pipe no more than 12” away from the outside of the boiler jacket. These two sensors will be the Delta T. (Note: Delta T is the difference between supply and return water temperatures) The amount of Delta T is chosen on Vari-Prime terminal block (JP2). Install the Sensors.

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

pg 5 of 6

C

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

B

pg 6 of 6

A

TB2

FLOaTING TermINaL BLOCK ITem e2346400 ON Ca0099

See NOTe 4

#2

#3

F

BL

BL #10

THermISTOr

543 2 1

NN NN N

YeL #7

BL/r #13

F

m BL/r #12

BL/W

USe HeaT SHrINK TUBe (PrOVIDeD) TO PrOTeCT WIreS Here 2X

m

4 3 2 1 24VaC TB2 POWer TB1 (-) (+) LeD1 1 2

DeTaIL C TYPICaL THermISTOr CONNeCTION

FemaLe PINS 39-000039

mOLeX CONNeCTOr

See NOTe 4

1/4" NPT

BL #11

BK

PrImarY GaS VaLVe

PrImarY GaS VaLVe

OUTLeT TemP SeNSOr 10K THermISTOr

BLUe 1/4" Fem

BL

Y #4

reD 1/4" maLe

Y #5

F

TB3 4-20ma(+) 1

Y #6

BL #11

Br

BLUe 1/4" Fem

N/O 1

CrImP SPLICe

E23450

Y #4 Y #6 Y #5 BL/WH #1 YeL #8

P/N LaarS-e2345000 COm 2 (OPTIONaL) N/C 3 PCB eNCLOSUre TB6

BL #10

m

BL/W

F

m BL/r #12

BLUe 1/4" Fem

8

NeU

BLr BLr BLr TB3 TB5-3 TB5-4

7

1 3 5

Cr1

F BL #11

BL #10

m

BL/r #13

F

m

BL/r #12

CONFIGUraTION

DeTaIL C TYPICaL SINGLe BUrNer BOILer

5

VarI PrIme

G

W

BK

Y

BL/W

VarI PrIme

W

BK

W

BK

DeTaIL e TYPICaL LaarS 220/240VaC POWereD BOILer PUmP

TO CUSTOmer 120VaC { PUmP reLaY

FIeLD WIreD

24V NEUTRAL

24V+

DeTaIL D TYPICaL LaarS 120VaC POWereD BOILer PUmP

BOILer PUmP

FIeLD WIreD

Y

BL/W

DeTaIL F

FIeLD 120V SUPPLY

CUSTOmer SUPPLIeD 120 VaC PUmP reLaY W

HOT

NEUTRAL

W

1 2 3 4 5 6 7 8

B

a

1 2 3 4 5 6 7 8

B

BOILer TB5

a

BOILer TB5

1 2 3 4 5 6 7 8

B

3

FOr 220/240VaC VFD PUmPS THe CUSTOmer WILL USe LaarS 120VaC FrOm BOILer TB5-3&4 TO eNerGIZe a COIL ON CUSTOmer reLaY TO CLOSe CONTaCTS FOr 220/240VaC SUPPLIeD BY CUSTOmer

FOr 120VaC VFD PUmPS THe CUSTOmer WILL WIre DIreCTLY TO BOILer TB5-3&4 aS Per INSTrUCTIONS NOTeD IN maNUaL

a

BOILer TB5

BK

VarI PrIme

NeOTHerm 1700 mBTU/H UNITS

4

NeOTHerm 1000 mBTU/H UNITS

reD 1/4" maLe

24V NEUTRAL

24V+

NeOTHerm NT 285-850

See DeTaIL D Or DeTaIL e

FIeLD WIre #14

(CUSTOmer) BOILer PUmP

reD 1/4" maLe

NeU +24VaC +120

BLr TB4

DK BLU/YeL

0-10VDC/ 4-20ma

aNaLOG INPUT

VFD (CUSTOmer)

BL/r #13

Br

BL/W

DeTaIL B TYPICaL TWO BUrNer BOILer CONFIGUraTION

6

NeOTHerm NT 1000

4 3 2 1 4 3 2 1 4-20ma(-) 2 TB5 TB4 0-10V (+) 3 PCB 0-10V (-) 4 DIJITIZeD

DK BL/YeL #9

TO PCB TB4-4

INLeT TemP SeNSOr 10K THermISTOr

2NDarY 2NDarY GaS VaLVe GaS VaLVe

TO PCB TB4-2

BK

PrImarY GaS VaLVe BL #11

BL/W

SeCONDarY GaS VaLVe

DeTaIL a TYPICaL TWO BUrNer BOILer CONFIGUraTION

HONeYWeLL J5-2 (PrI)

Bl/r #13

PrImarY GaS VaLVe

NeOTHerm NT 1700

HONeYWeLL J5-2 (SeC)

PrImarY GaS VaLVe TO PCB TB4-4

2NDarY 2NDarY GaS VaLVe GaS VaLVe TO PCB TB4-2

D

www.Laars.com PCB TB1-2 (+24V)

GaS VaLVe

7

TO PCB TB4-4

8

TO PCB TB4-2

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE PROPRIETARY TO LAARS HEATING SYSTEMS CO. AND SHALL NOT BE REPRODUCED, TRANSFERRED TO OTHER DOCUMENTS, USED OR DISCLOSED TO OTHERS FOR MANUFACTURING OR ANY OTHER PURPOSE EXCEPT AS SPECIFICALLY AUTHORIZED IN WRITING BY LAARS HEATING SYSTEMS CO.

Customer Service and Product Support: 800.900.9276 • Fax 800.559.1583 Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355 1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

5.

4.

3.

2.

1.

N