Nashville Electric Service

Report 8 Downloads 188 Views
Nashville Electric Service •

Specification – 33-506R3



Description: Steel Arms

Scope……………………………………………………………..

Page 2

Drawings…………………………………………………………. Page 2 Arms…………………………………….………………………… Page 2 Shipping………………………………..………………………… Page 2 Delivery………………………………..…………………………. Page 2 Basis of Payment………………………………………………..

Page 3

Approvals…………………………….…………………………... Page 3 Revision History…………………………………………………. Page 3

The Electric Power Board of the Metropolitan Government of Nashville and Davidson County

Specification 33-506R3

1.0 SCOPE 1.1

This specification covers the design, fabrication, and delivery of tubular steel arms for the support of 1351.5 AAC Columbine and 795 ACSR Coot conductors with 69kV and 23.9kV insulating devices.

2.0 DRAWINGS 2.1

The following Nashville Electric Service (NES) drawings are attached and made a part of this specification:

2.2

Drawing

Description

LSK-1116

Arm dimensions.

3.0 ARMS 3.1

Arm dimensions are specified on latest version of LSK-1116. Through holes shall be drilled as specified on Nashville Electric Service Drawing. Arm must be constructed from cold formed structural steel tubing in accordance with ASTM specification A500 Grade B. Arm must be hot dipped galvanized to ASTM Specification A-123 after fabrication.

3.2

Arm shall be constructed from rectangular structural steel tubing with an outside dimension of four inches by six inches and a minimum wall thickness of 0.250 inch. Minimum yield stress of the tube must be 46,000 pounds per square inch. Minimum tensile stress must be 58,000 pounds per square inch.

4.0 SHIPPING 4.1

All parts of the arm structure shall be shipped disassembled.

5.0 DELIVERY 5.1

Specify in the proposal the minimum number of calendar days required for delivery of the arms after the award of the contract.

5.2

All arms shall be delivered and unloaded as stated in the invitation to bid.

2

Specification 33-506R3

6.0 BASIS OF PAYMENT 6.1

Payment will be made and proposals shall be submitted on the basis of a total price for arms with attachments. Bidders are to include an itemized list of the weight and cost for arm with bolts listed separately for Accounting purposes.

7.0 APPROVALS

Nashville Electric Service Approval Signatures Revision No.

Prepared By:

Supervisor

Manager

Vice President

12-21-00

---

---

Nick Thompson

Paul Allen/ CharlesAllen Bradley

8.0

Revision #

Procurement

REVISION HISTORY

Date revised

Changes Made

1 2

Engineers with input to revisions FAF BKC

4-27-99 9-5-00

Original Issue General Revision

3

HAL

12/21/00

Reference latest revision of LSK-116 dwg

3

Recommend Documents