Thermal Energy Efficiency Opportunities & Incentives

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Steam & Energy Management Systems

Overview Steam Systems & Energy Management Systems

Thermal (Natural Gas) Energy Efficiency Opportunities National Grid Incentives Overview Energy Efficiency Measure Examples 2

Steam Systems •Typical System

Exhaust Gas

Exhaust Gas Space & DHW

Inducer Fan

Heating

Blowdown

Steam Steam

Combustion Air

Vent

Vent

Inlet Fan

Blowdown

USDOE – Industrial Technologies Program – Improving Steam System Performance

3

Steam Systems System Incorrectly Operating vs. System Correctly Operating Correct or Submit “As Is”?

Opportunity vs. Incentive Eligible EEM Boiler Door Gaskets, Pipe Leaks, etc.

4

Steam Systems •Natural Gas Savings Opportunities

Exhaust Gas

Exhaust Gas Space & DHW

Inducer Fan

Heating

Blowdown

Steam Steam

Combustion Air

Vent

Vent

Inlet Fan

Blowdown

USDOE – Industrial Technologies Program – Improving Steam System Performance

5

Steam Systems •Natural Gas Savings Opportunities  Generation  High-Efficiency Boiler  Shell Insulation  Pre-Heat Combustion Air  Pre-Heat Feedwater  Decrease Pressure  Automate Blowdown  Blowdown Heat Recovery  Excess O2 Trim 6

Steam Systems •Natural Gas Savings Opportunities  Distribution  Steam Pipe Insulation  Turbine vs. PRVs  Control & Isolation Valve Insulation  Steam Traps

7

Steam Systems •Natural Gas Savings Opportunities  End-Use  Heat Exchanger Insulation  Steam Traps  Steam Pipe Insulation  Process Equipment (i.e., steam vats)  Pre-Heat Incoming Water/Fluid

8

Steam Systems •Natural Gas Savings Opportunities  Recovery  High-Pressure Condensate Flash Steam Re-Use  Condensate Pipe Insulation  Vent Steam Reduction & Heat Recovery  Steam Traps  Condensate & Deaerator Tanks Insulation

9

Steam Systems •Natural Gas Incentives  Generation

 Distribution

 End-Use

 Recovery

 High-Efficiency Boiler

 Steam Pipe Insulation

 Heat Exchanger Insulation

 Shell Insulation

 Turbine vs. PRV

 Steam Traps

 Pre-Heat Combustion Air

 Control & Isolation Valve Insulation

 Steam Pipe Insulation

 Pre-Heat Feedwater

 Steam Traps

 Process Equipment (i.e., steam vats)

 Vent Steam Reduction & Heat Recovery

 Pre-Heat Incoming Water/Fluid

 Steam Traps

 Decrease Pressure  Automate Blowdown  Blowdown Heat Recovery  Excess O2 Trim

 High-Pressure Condensate Flash Steam Re-Use  Condensate Pipe Insulation

 Condensate & Deaerator Tanks Insulation

•Custom or Prescriptive •Custom 10

Steam Systems •Natural Gas Incentives Overview - Custom Eligibility Pre-Requisites in both MA & RI…

Notable Differences between MA’s & RI’s NG Programs…

-SPB < Equip. Lifetime - BCR > 1.0

- Program Names - ≥ 300 kW -$1.50/Therm vs. $3.00/Therm - Dual-Fuel EEM Incentive

New Construction

Retrofit Incentive Eligibility ROT ~80% Lifetime > EEM’s SPB > 1.0 Y

11

Steam Systems •Natural Gas Incentives Overview - Prescriptive

New Traps New Traps & & Repair Kits Repair Kits

12

Steam Systems •Steam & Condensate Pipe Insulation Pipe Insulation Summary Capital Cost Annual Savings Payback (Years) Incentive Up to 50% of Capital Cost Up to $1.50/Therm (MA) Up to $3.00/Therm (RI) Down to 1.0 Years SPB Savings Unit Loss (Btu/H-Ft) Hours/Year K Lbs./Year (500 Ft.) Therms/Year (500 Ft.) Dollars/Year

Heating $15,000 $6,728 2.2 Heating $7,500 $13,456 $26,913 $8,272 Heating 396 3,500 714 8,971 $6,728

Process $15,000 $35,924 0.4 Process N/A N/A N/A N/A Process 881 8,400 3,815 47,899 $35,924

15

Steam Systems •Steam Pressure Reduction Steam Pressure Reduction Summary Capital Cost Annual Savings Payback (Years) Incentive Up to 50% of Capital Cost Up to $1.50/Therm (MA) Up to $3.00/Therm (RI) Down to 1.0 Years SPB Savings Unit Loss (Btu/H-HP) Hours/Year K Lbs./Year Therms/Year Dollars/Year

Heating N/A N/A N/A Heating N/A N/A N/A N/A Heating N/A N/A N/A N/A N/A

Process $20,000 $4,224 4.7 Process $10,000 $8,449 $16,898 $15,776 Process 518 8,400 449 5,633 $4,224

100 HP 125 psig → 100 psig

16

Steam Systems •Pre-Heat Boiler Feedwater

Pre-Heat Boiler Feedwater

200 HP 100% Firing Rate ~14 gpm 225 oF → 250 oF ~166,000 Btu/H

Summary Capital Cost Annual Savings Payback (Years) Incentive Up to 50% of Capital Cost Up to $1.50/Therm (MA) Up to $3.00/Therm (RI) Down to 1.0 Years SPB Savings Unit Heat Recovery (Btu/H) Hours/Year K Lbs./Year Therms/Year Dollars/Year

Heating N/A N/A N/A Heating N/A N/A N/A N/A Heating N/A N/A N/A N/A N/A

Process $25,000 $9,786 2.6 Process $12,500 $19,573 $39,146 $15,214 Process 120,000 8,400 1,039 13,049 $9,786

17

Steam Systems •Steam Traps Steam Traps Summary Capital Cost Annual Savings Payback (Years) Incentive Up to 50% of Capital Cost Up to $1.50/Therm (MA) Up to $3.00/Therm (RI) Down to 1.0 Years SPB Savings Unit Loss (Lbs./H) Hours/Year K Lbs./Year Therms/Year Dollars/Year

Steam Traps Heating $170 $112 1.5 Heating N/A N/A N/A N/A Heating 3.4 3,500 12 149 $112

Process $518 $1,495 0.3 Process N/A N/A N/A N/A Process 18.9 8,400 159 1,993 $1,495

Summary Capital Cost Annual Savings Payback (Years) Incentive Up to 50% of Capital Cost Up to $1.50/Therm (MA) Up to $3.00/Therm (RI) Down to 1.0 Years SPB Savings Unit Loss (Lbs./H) Hours/Year K Lbs./Year Therms/Year Dollars/Year

Heating $170 $112 1.5 Heating N/A N/A N/A N/A Heating 3.4 3,500 12 149 $112

Process $518 $1,495 0.3 Process N/A N/A N/A N/A Process 18.9 8,400 159 1,993 $1,495

Prescriptive MA - $25/Trap RI – Up to $75/Trap (RI – 100 Trap Max.)

Custom Survey - 100% by NGrid Repairs – 50% by Ngrid (RI – $10,000 Max./Y)

18

Steam Systems

19

EMSs •Natural Gas Savings Opportunities  AHU, RTU, Boiler, Pump, etc.  Start/Stop  Schedules (Master, Zones, Equipment, etc.)  Occupancy  Optimal

 Reset  Hot Water  Discharge Air Temperature

 Setback  Unoccupied  Standby

 Demand Control Ventilation  Boiler Staging & Loading  Warm Weather Shutdown/Lockout  Prevent Simultaneous Heating & Cooling 20

Steam Systems •Natural Gas Incentives Overview - Custom Eligibility Pre-Requisites in both MA & RI…

Notable Differences between MA’s & RI’s NG Programs…

-SPB < Equip. Lifetime - BCR > 1.0

- Program Names - ≥ 300 kW -$1.50/Therm vs. $3.00/Therm - Dual-Fuel EEM Incentive

New Construction

Retrofit Incentive Eligibility ROT ~80% Lifetime > EEM’s SPB > 1.0 Y

21

EMSs •Natural Gas Incentives Overview - Prescriptive

600

$3,

0 $90

0 ,80 $10

700 $2,

0 ,80 8 2 $

200 $7,

22

EMSs •Demand Control Ventilation Energy Efficiency Measure Snapshot ○ ○ ○ ○ ○

Demand Control Ventilation Air Handling Units, Roof-Top Units & Make-Up Air Units, Unit Ventilators Reduces the amount of outside air to be conditioned. Tracks space occupancy through CO2 sensors and adjusts outside/return air dampers. Energy Savings - Percentage the AHU's outside airflow can be reduced. ~50%

» » » »

Dampers with fixed position dampers set for maximum space occupancy. Good - Space Heating or Cooling. » Best - Both Space Heating & Cooling. Minimum Supply Fan rating of ~5,000 cfm and centralized returns. Variable Hourly and/or Daily Occupancy.

Favorable System/Equipment Characteristics

Financial Summary Equipment Size: 1 x AHU (Supply Fan ~9,000 cfm) Capital Cost: $4,667 Monetary Savings: Incentive - Electric: $667 Simple Payback: Incentive - NG: $2,350 Simple Payback:

$1,650 2.8 1.0

Incentive Program & Eligibility Large Commercial Retrofit or Commercial New Construction Program Natural Gas Incentive - Custom Application Up to 75% of Incremental Cost or Up to $1.50/Therm-Y (MA)/$3.00/Therm (RI) or Down to 1.0 Y SPB. Up to 50% of Total Cost or Up to $1.50/Therm-Y (MA)/$3.00/Therm (RI) or Down to 1.0 Y SPB.

Electric Incentive - Custom Application Up to 75% of Incremental Cost or ~$.25/kWh-Y (RI) or Down to 1.0 Year Simple Payback. Up to 50% of Total or ~$.19/kWh-Y (RI) or Down to 1.0 Year Simple Payback.

23

EMS Systems

25