PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 Existing 2ND Floor Slab and structure removed  Floor to be reconstructed at a higher level to meet the floor heights in the new Book Stack areas.

 Existing Vestibule demolished and to be reconstructed to meet current accessibility requirements

96 Pompton Avenue

Page

1

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 Existing stair finishes removed  New tread and riser covers to be provided.

 Roof structure exposed  This portion of the roof is to be demolished and a new, high roof to be constructed

96 Pompton Avenue

Page

2

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 Second Floor Stack Room demolition complete

 Phase 1 Steel in place

96 Pompton Avenue

Page

3

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 New Addition first floor slab in place

 Basement walls and elevator pit in place  Masons are working on building up the back-up masonry

96 Pompton Avenue

Page

4

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 Second Floor Stack room complete with demolition

 Second Floor Stack room complete with demolition

96 Pompton Avenue

Page

5

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 View to Main Room from Second Floor area

 Basement Meeting Room  Contractor to remove any wires not to be used in the new construction

96 Pompton Avenue

Page

6

2nd Floor Suite 200 o 973.484.4800

e

[email protected]

Verona, NJ 07044 f 201.706.7777

www.solutions-arch.com

PHASE II RENOVATIONS & ADDITION 17.104 – VERONA PUBLIC LIBRARY 10.03.17

 Basement New Addition  Plumbing rough-in complete

 Basement New Addition  View towards Elevator