1. 2X BLOCKING

1

5"

1. ROOF SHEATHING

3

NOTE: AVOID OPENING IN SHEAR WALLS

" MAX. NAIL EXPOSURE @

GAP.

2

5" 4

3 8

2.

12" MAX.

16

2

SHEAR WALL E.N. UNLESS STRAP IS PLACED ON TOP OF PLYWOOD.

D0087

SHEAR

TRANSFER

BLK'G. & E.N. IS REQ'D.

E.N.

FOR HOLES IN SHEAR WALLS GREATER THAN

9" SQ.. NO MORE THAN

TYPICAL BOUNDARY NAILING

ONE HOLE LARGER

" TO EDGE OF POST STUD & 3 " TO EDGE OF 8

MIN.

END NAIL TO EACH TRUSS.

3 8

THAN 9" SQ. IS ALLOWED IN EA.

PLYWOOD

EDGE NAIL ALONG STUD ON EACH SIDE OF OPENING

13

WALL PLYWD. SPLICE W/

" GAP

2X PRESSURE BLKG. W/ 16D'S TO GIRDER TRUSS & (3) 16D'S

EDGE NAIL TO BLK'G. TO MATCH

BEVELED ON TOP AS REQ'D.

1 8

USED TO CONNECT BLKG. TO TRUSS IN LIEU OF NAILING.

DO NOT OVER-CUT ANY FRAMING MEMBER.

1

TRUSS TOP CHORD UNDER ROOF SHEATHING WHEN NOT

2X FLAT BLKG. @ SHEAR

NOTE: A35 @ 24" O.C., CAN BE

ONE STUD BAY OR 16".

4. 2X BLK'G., LEDGER, R/R. OR

2X FLOATER

@ SHEAR TRUSS.

MAX. WIDTH OF OPENING TO BE

MEMBER.

4

2X SHAPED BLKG. (SEE 13/SN-2 FOR ALT.) W/ 16D'S @ 8" O.C.

W/ LENGTH LESS THAN 4'-0"

3. INCREASE NAILING TO 8D'S @ 3" O.C. ON NON-BEVELED

PER PLAN.

HORIZONTAL LINE IN SHEAR WALLS. STAGGER

STUD WIDTH

HOLES IF SUCH

2

CONDITION OCCURS. 3

2. PLYWOOD TREADS & RISERS

(MIN. 43 ").

FIELD FIX

3. 2 X 4 THRUST PLATE ANCHORED

FOUNDATION PLAN). SECURE STRINGER TO 2 X 4 PLATE W/ (3) 16D TOE NAILS.

4

5. PLYWOOD SUBFLOOR 6. APPROVED METAL HANGERS

5

4

12

CONT. RIM JOIST AT ALL

"

7

11. 6" MIN. @ NOTCH NO OVERCUT.

NOTE: BORED HOLES NOT PERMITTED

12. 2 X 6 LEDGER W/ (4) 16D'S PER

IN MORE THAN TWO CONSECUTIVE

D0002N

14

2. GUARDRAIL W/

5

SCREWS.

3.

1 2

3 8

EXTERIOR & BEARING WALLS

4"

2 X 4

1

2 X 6

23"

35"

2-2 X 4

21 "

21 "

2-2 X 6

35 16

"∅ LAG

2

"

38" MAX.

" DIA. RAIL SCREW W/

8

16

16

8

8

"

35 16

"

2 X 4

7 8

2 X 6

13 8

NONBEARING WALLS

"

1

"

7 16

1 2

DEPTH

4

2X FLOATER

2

7

TRIMMER & KING STUD PER PLAN.

TYP.

FRAMING

CROSS

SECTION

2

5

PARALLEL WALLS.

6. 2 X 4 @ 24" O.C. W/ (1) LTP4

2

TO EACH FLOOR MEMBER NOTE:

3

ALT. SIMP.

4

"Z" CLIP.

PERPENDICULAR

1

4

4. ROOF OR FLOOR FRAMING MEMBER. 5. 2 X 4 FLAT CONNECT TO

4

OFFSET EDGE SUPPORT 6

ALT. CONDITION

COMMON NAILS @ EA. END 6. PANEL EDGE WHERE 2X FLAT BLKG. IS NEEDED @ BLOCKED DIAPHRAGM. 7. DIAPHRAGM BOUNDARY & B.N. PER PLAN.

FRAMING MEMBER 14

7

8

HOLE SIZE

FRAMING MEMBER W/ (2) 10D

W/ MAX. 6" AWAY FROM 9

8. DISCONTINUOUS PANEL EDGE, EDGE NAILING PER PLAN.

10

3. JOIST DEPTH

TJI SIZE

UP TO 3" A

B

UP TO 5" A

B

13

& PROVIDE B.N. @ ALL EDGES. 16. TYP. APPROVED HANGERS USE

(3) 16D TOE NAILS IF LENGTH OF TAIL JOIST IS GREATER

THAN 6'-0".

17. TAIL JOIST/TRUSS PER PLAN 18. TYP. 2-BAYS OF BLKG. W/ 1 " O.C. CS16 W/ NAILS @ 216

250 1'-6" 2'-0" 3'-6" 5'-6" 6'-0" 8'-6"

-MAINTAIN MIN. 6" SPACING

14"

250 1'-0" 1'-0" 1'-0" 4'-0" 3'-6" 8'-0" 8'-6" 11'-0"

BTWN. NOTCHES/BORED HOLES

14"

350 1'-0" 1'-0" 2'-6" 5'-0" 5'-0" 9'-0" 9'-6"11'-6"

-FOR OTHER HOLE SIZES

A

1 8

NOTCH

&

HOLES

IN

CONDITION

NON-BEARING

WALL

SUPPORT 1.

1

D0018

PLAN VIEW

D0009

7

3

1 2

" THICK PLYWOOD SHT'G.

9

7

AS AN ALT. EXTEND ROOF

10

SHT'G. THROUGH FIREPLACE. 1 2

4

7

1 1

6

6

9

3

8. PLYWOOD FLOOR SHT'G.

4

CONT. THRU FIREPLACE.

"∅ X 321 " LONG LAG BOLTS @ 16" O.C. STAGG.. 12. 31 " X 31 " X 1 " STEEL 2 2 4 ANGLE FOR UP TO 8'-0" OPENING & 6" X 321 " X 38 " FOR UP TO 16'-0" OPENING. 11.

5 8

TO BE 4'-0". FOR HEIGHTS

2

ADEQUATE KICKERS TO

8

6

2

THR. WALL D0003

12 FIREPLACE CONN. TO FRAMING

D0004

8

2

2

4

3

10

8

3

1

D0008

4

2

2

1

5

(MAX. @ 24" O.C.) 3. 1X OVER 2X PLATE OR (2)

2X TOP PLATE WHEN TRUSS BOT. CHORD IS CAMBERED

4

6

4. 2X BLK'G. @ 24" O.C. W/ (2) 16D'S TO EACH MEMBER.

5. 2X MEMBER W/ (2) 16D TO BLK'G

6. 2 X 8 BRACING.

MIN. 4" ON SIDE

7. (2) 2X TOP PLATE. 8. (2) 16D'S @ 12" O.C.

OF VENEER. 10

11

9

7

11

3

CONNECTION 12

@ OPENING

MASONRY VENEER/CAVITY WALL

3

1. BOTTOM CHORD OF TRUSS 2. SIMP. STC @ EACH CONNECT.

PARALLEL

NOTE: ANGLE NEED TO EXTEND & BEAR

3

SECTION

1

1

PERPENDICULAR

(NOTE 6" IS VERT. DIMENSION OF ANGLE).

4

D0001N

2

VERTICAL. 10. BEAM OR HEADER PER PLAN

BRACE WALL TO ROOF.

6. HEADER PER PLAN

BLOCKING AT POSTS/TRIMMERS

REINFORCEMENT @ 12" O.C.

AS REQUIRED.

8

STUD OR BEAM BELOW.

#9 B.W. GAGE WIRE JOINT

7. CUT HOLE IN PLYWOOD ONLY

5

4. 4-16D'S, 2 @ TOP & 2 @

9. IN SEISMIC ZONE 3 & 4, ADD

1

GREATER THAN 4'-0", USE

5

JST.

& 2X SQUASH BLK'G. ADD

BOTTOM EACH SIDE.

6. SHEATHING WHERE OCCURS. 7. MORTAR BED. 8. 10D NAIL AT BEND IN ANCHOR

SIDES CENTERED @ JOINT

10. MAX. UNSUPPORTED HEIGHT

IN CONV.

3. "1" JOIST W/ FULL BEAR'G.

5

ANCHOR @ 12" O.C. VERTICAL & MAX. 24" O.C. HORIZONTAL.

9. FLOOR SYSTEM.

24". PROVIDE ADEQUATE FRAMING

STUD ABOVE.

6

5. 22 GAUGE X 7 " WIDE X 6" 8 LONG GALVANIZED CORRUGATED STEEL VENEER

DBL. TOP PLATE.

3

2. LOAD BEARING POST/

5. SOLID BLKG./POST, MULTI-

4. AIR SPACE WHERE REQ'D.

5

" THICK PLYWOOD ON 3

5. 2X LEDGER W/ 16D'S @ 6"

6

4

ARCHITECTURAL DRAWING AND MANUFACTURER FOR MORE INFORMATIONS.

2

O.C. & LTP4 @ 8" O.C. TO

1

HOLES

BEARING. ADD BLKG. AS NEEDED.

FILLERS AS NEEDED.

3. 4" MAX. BRICK VENEER. SEE

6. FIREPLACE FLUE.

&

1. SOLID RIM (2X, L.V.L. OR TIMBER STRAND) W/ FULL

WALL TRANSITION

O.C. TO LEDGER/TOP PLATE. 2

1A

2

1. FLASHING. 2. WOOD FRAME WALL.

1 " THICK PLYWOOD 2 SHT'G. NAILED DOWN @ 6"

1-JOIST

-T & G EDGE TO BE LOCATED OVER CONTINUOUS PANEL JOINT. -MAX. UNSUPPORTED SHEATHING TO BE

" ALL PLYWOOD E.N.

SHEAR WALL/WALL INTERSECTION

3. MIN.

3

MEMBERS W/ BOUNDARY NAILING

16 NOTCH

1 8

SHOULD FALL ON 2X FRAMING MEMBERS.

2. ROOF SYSTEM.

L1

2

D0014A

3

& EXTEND 4'-0" EACH WAY.

-PROVIDE MIN. 3 " EDGE DISTANCE @ 8 FRAMING MEMBER & 5 " TO EDGE OF 16 PLYWOOD DIAGHRAGM. -ALL DIAPHRAGM BOUNDARIES SHOULD BE FULLY SUPPORTED BY FRAMING

D0005N

CONDITION

4.

MEMBERS TO LIMIT SPAN.

LAYOUT

ALTERNATE

-DO NOT CUT HOLES LARGER

L2 2X L2 MIN.

BLOCK

4

-REFER TO MANUFCTURERS GUIDE-LINES IN 1-JOIST CATALOG.

TYPE, THICKNESS, SPACING, & NAIL SIZE.

17

PARALLEL

-A 11 " HOLE CAN BE CUT 2 ANYWHERE IN THE WEB.

-NAILS SHALL BE DRIVEN TIGHT BUT SHALL NOT FRACTURE SURFACE OF SHEATHING. -SEE GENERAL NOTES FOR PLYWOOD

16

SPAN ONLY

2

-MIN. SIZE OF SHEET SHALL BE 2' X 2'.

OPENING IN DIAPHRAGM

1 3

THAN 11 " IN CANTILEVER.

D1 2X D2 MIN. D2

7

6

MANUFACTURER SPEC.

B

" MIN.

VENT

4

AND JOIST TYPE, SEE

TYP.

NOTES: -STAGGERED JOINTS AS SHOWN

18

4

117 "

9. CONT. PANEL EDGE W/ BLKG. (IF BLOCKED DIAPHRAGM),

OPENING W/ DBL. STRUCT'L. MEMBERS/BEAM (PER PLAN)

16" MIN.

SHEATHING

B

MAX.

1

-PER CONV. FLOOR SYSTEM NOTCHED & BORED HOLES TO

BLOCKED @ ALL EDGES. 11. FIELD NAILING PER PLAN 12. FRAMING MEMBERS 13. 1 " GAP U.N.O. 8 14. DIRECTION OF FACE GRAIN PERPENDICULAR TO SUPPORT 15. BLOCK OUT EDGES OF THE

10

15

A

3

BE @ OUTER

8

6

OF JOIST DEPTH MAX OF JOIST DEPTH WITHIN LOCATION SHOWN

150 1'-0" 1'-6" 3'-0" 4'-6" 5'-0" 8'-0"

8

10. 24" MIN. UNLESS FULLY

12

B

TYP.

SHOULD BE STAGGERED MIN.

1 6 1 4

117 "

EDGE NAILING PER PLAN.

11

A

2"∅

4

TYPICAL

NAILS SPACE @ 2" O.C. SHOULD

NOTES:

UP TO 7" UP TO 10"

SKIP A35'S @ VENT BLK'G.

41 "

7. 16D'S @ 4" O.C. STAGGERED

6

NOTE: 1

OF 4'-0" (2-A35'S PER ADJACENT BLK'S).

6. EDGE NAILING

IS REQUIRED.

3

5"

STAGGERED.

3

USE FILLER AS REQUIRED

5

CL

TOGETHER W/ 16D'S @ 16" O.C.

WHEN I-JOIST SYSTEM IS USED.

@ 12" O.C. FOR VENT SPACING

2"±

2

5. 6.

2

5. NAIL CORNER & MULTI-STUDS

-"1"-JOIST BLK'G. MAY BE USED

-FOR PARTITION LENGTH LESS

1

A35 @ 16" O.C. FOR VENT

SPACING OF 6'-0" (3-A35'S PER ADJACENT BLK'S), AND

±221 "

4. POST AT END OF SHEAR PANEL PER PLAN.

4. PIPE OR CONDUIT

OF JOIST DEPTH MAX.

2. 2" CLEAR TO EDGE OF JOIST

3. 2 X 4 W/ NAILS TO BE MATCHED W/ EDGE NAILING

3

5

1 3

SOLID PORTION (MAX 6" O.C.).

3. PLYWOOD SHEAR PANEL PER PLAN.

SPANS OVER 1 THE LENGTH 2 OF THE JOISTS.

11

D0006N

EDGE NAILING TO FALL ON

2. CORNER STUDS OR POST PER PLAN.

-FOR PARALLEL CONDITION, BLK'G. MAY BE OMITTED IF

CONDITION

THRU PLATE FRAM'G

EACH END TO TOP & SILL PLATES.

2"±

15 PIPING

O.C. U.N.O. W/ (2) 16D END NAILS OR (4) 8D TOE NAILS

5

UNDER THE LENGTH OF THE JOIST: OR A DBL. JOIST IS ALIGNED UNDER A WALL WHICH

PENETRATION.

1

D0014

1. TYPICAL 2X STUDS AT 16"

1

1 2

-USE SIMPSON NS AS NEEDED

6

FRAMING ELEVATION

A SINGLE JOIST IS ALIGNED UNDER A WALL WHICH SPANS

STAGGERED @ E/S OF PLATES.

PENETRATION. USE MIN. 2"

TYPICAL

AND @ 16" O.C. UNDER

4. 2X JOISTS OR "1"-JOIST

1

6

16D NAILS EA. SIDE UNDER PERPENDICULAR WALLS

NOTCH OR END OF PLATE

" DIA. BOLTS CAPACITY 8

2. ROOF OR FLOOR SHEATHING

P.T.D.F. SILL PLATE

5. MIN. 2 X 6 SOLID BLK'G. W/ (2)

1. 2X STUDS 2. SILL PLATE 3. S.P.N. PER PLAN

EACH PLATE CUT W/ (6)

50OF TOP PLATE WIDTH, USE SIMPSON ST6224,

1.

U.N.O.

D0013

NOTE: -IF NOTCH OR HOLE EXCEEDS

1. PANEL JOINT

PER PLAN ON OUTSIDE FACE OF SHEAR PANEL

OPENING @ EITHER

3

1

INSTALL POST ANCHOR

3" 8

SIDE EXCEED 5'-0" O.C.

THAN 8'-0" NO BLK'G.

" GAP

@ 6" O.C.

STUD WALL

SIMP. HDC WHEN

7- LOCATE ANCHOR BOLT 5" MIN. 9" MAX. AWAY FROM

3

IN WITHDRAWL IS 313 #/IN.

1 8

KING STUD W/ 16D'S

WHERE OCCURS

OR GREATER

5- TOP PLATES/SILL PLATES

3"

D0027N

PER PLAN ATTACHED

1 " 2

HD8A OR HTT22 WHERE OCCURS

4- PIPE WHERE OCCURS

5

M=20 (8") (38")/12=506 1B-IN P=506/1.5=338# 3

HANDRAIL/GUARD RAIL

PANEL. TRIMMER OR POST

10

8D'S @ EACH SIDE.

F=20 PLF

ALT. CONDITION

FLUSH WITH SHEAR

1" 8

OPENING=8'-0"

MAX. HEIGHT=38"

11

SHEAR WALL NAILING HEADS SHOULD BE

2X FLOATER.

3- SIMPSON CS16 X 14" LONG METAL STRAP, TYPICAL @

3

7

3" 4

MATCH SHEAR WALL E.N.

SEE FOUNDATION PLAN NOTES.

6- ANCHOR BOLTS PER PLANS

3" 4

W/ 16D'S SPACED TO

GREATER THAN 8'-0"

ICBO APPROVED "SHOT PINS @

"

23 16

TOP PLATE, STRAP E/S OF PLATE W/ ITEM #3 BELOW

5

2

ATACH TO KING STUD

4

4

1 1"

REQUIRED.

TRIMMER IF OPENING IS

SEE FOUNDATION PLAN FOR SIZE & SPACING.

2- 13 " MAX. IF BORED HOLE 4 EXCEED 13 " IN 2 X 4 TOP 4 PLATE OR 23 " IN 2 X 6

4

2

10

WHEN PLYWD SHT'G. IS NAILED TO TRIMMER,

STAGGERED E.N. IS

@ 6" O.C. USE DBL.

MUD SILL W/ ANCHOR BOLTS

"

NOTE:

3" 8

1- NOTCH IN PLATE

6 10

NON-SHEAR WALLS. (MAX. HEIGHT-14').

3" 8

VERT. SPLICES WHERE

2X TRIMMER W/ KING STUD ATTACHED W/ 16D'S

2

DE PT H

11. SHIM AS REQUIRED

ALT. CONNECTION

9 21 "

EXTERIOR & BEARING WALLS

PLATE STAGG. @ 16" O.C. 10. MSTA21 CENTERED @ SHT'G. NAIL ALL HOLES

5

STUD SIZE

21 "

7 16

3" MAX.

EACH STUD. 9. H2.5 FROM STUD TO SILL

5

8

NOTCH DEPTH

1

STUD W/ (3) 16D'S. 8. 2 X 8 BLKG. W/ (4) 16D'S TO

4

3

1

MIN. 3X POST AT

REFER TO PLANS FOR OTHER CONDITIONS.

STUD NOTCHING/BORING LIMITS

" DIA. X 221 " LONG LAG

APPROVED WASHER BY MANUF. 6. FLOOR SYSTEM 7. H2.5 OR SCAB JOIST TO

4

ON ADJOING PANEL EDGES @ 3X POST.

1" 2

DOUBLE SILL IF

SCREW W/ WASHER THROUGH 3 8

STAGGERED NAILING

ALL EXTERIOR WALLS. (MAX. HEIGHT=10').

NONBEARING WALLS

DRYWALL. 4. 2X STUD 5.

SIMPSON ST6236.

D0007

1. BALUSTER PER ARCHITECT. 1

HEADER PER PLAN,

MIN. 2 X 4 STUDS @ 16" O.C. AT

BORED HOLES

STAIR DETAILS

4"

SN2

DOUBLE STUDS

STUD SIZE

MAX.

TYP. LTP4 EACH

MIN. 2 X 4 STUDS @ 24" O.C. AT

3

TOP PLATE.

SIDE

INTERIOR NON-BEARING AND

STUD @ WALL CONDITION.

2 SN2

WALLS. (MAX. HEIGHT=10').

1

10. DBL. JOIST OR BLOCKING 4

2 SN2

MIN. 2 X 4 STUDS @ 16" O.C. AT INTERIOR BEARING, AND SHEAR

D MIN.

3

8" O.C.

2

11 SN2

IF NOT CONT. USE

9. CONT. 2X PLATE W/ 16D'S @ 10

RIM JOIST PER PLAN.

BEARING POINTS.

4

8. SIMP. THA213 TRUSS HANGER

1

SCHEDULE

2

9

PER SHEAR WALL

SOLID RIM JOIST PER PLAN

2

7. DBL. JOIST OR HEADER

5 8

SHEAR WALL.

±31 "

8

WALL

PROVIDE SOLID BLOCKING OR

4. HOLE EDGE DISTANCE MIN.

WALL & PER TABLE @

SOLE PLATE NAILING

WITH FLOOR E.N. SECURE W/ (2) 16'D'S E/S.

3. SILL PLATE

1 3

4. PER ARCHITECTURAL

MIN. 12" LONG @ MAX. 48" O.C.

2. STUD 1

@ 8" O.C. @ NON-SHEAR

CRIPPLE

2"

11

SOLE PLATE NAILING

3 " 4

7

9

TYP.

1

S.W.

1. NOTCH DEPTH & BORED HOLE SEE TABLE BELOW.

OUTER

5

IN

BLK'G. (2X, 1-JOIST)

OF SPAN ONLY

WALL ANCHOR NOTES ON

6

OPENING

O.C. U.N.O. PLANS.

D

W/ SHOT PINS @ 24" O.C. W/ 2" DIA. WASHERS. (SEE INTERIOR

7

FOR

OR LTP4 @ 48"

3"

2

SIMPSON A35/A35F

SN2

D0026

1. 2 X 12 STRINGERS @ 16" O.C.

800.700.3305

3

ROOF TRUSS

E.N.

NAILS @ 2 1 " O.C.

ALT. CONDITION

5

ALT. CONNECTION

1

9. TYP. EDGE NAILING. 10. 2X CEILING JOIST OR BOTTOM CHORD OF TRUSS.

11. 2X BLK'G. X 12" LONG @ ±6'-0" O.C. NAILED TO TOP PLATE

W/ (3) 16D'S.

FRM'G. TO NON-BEARING WALLS

D0019

3

PAPER TO CAD

12" MAX.

Q-CAD

1

ROOF SHEATHING

2. SIMP. CS16 X 48" LONG W/