steelhead townhouses

Report 0 Downloads 72 Views
121 Lawrence Street, Eugene, OR 97401 | p: 541.342.5777 f: 541.342.6128 | www.2-form.com

HEARTFELT GUESTHOUSE 116 St. Joseph Place Springfield, OR 97477

ADDENDUM #1

Date Issued: 2 March 2018

THIS ADDENDUM MODIFIES THE BIDDING DOCUMENTS FOR THE ABOVE PROJECT TO THE EXTENT INDICATED HEREIN AND ALL PORTIONS OF THE DOCUMENTS NOT SPECIFICALLY AFFECTED BY THIS AMENDMENT SHALL REMAIN IN FULL FORCE AND EFFECT. ALL ADDENDUM ITEMS SHALL BE ADDED TO AND FORM A PART OF THE BIDDING DOCUMENTS.

DIVISION 0 1.

Geotechnical Report • Clarification: Site preparation to follow wet weather recommendations detailed in the Geotechnical Report provided in the project manual

2.

Specification Section 00 0120 Bid Instructions & Special Provisions • Add 1, D, i: Heartfelt Construction Schedule 1

CIVIL 1.

Reference Attached Drawings EC1.0, EC1.1, EC2.0, EC3.0: • Supplemental information regarding erosion control

2.

Reference Attached Drawing C100 rev1 • Replace C100 with C100 rev1. Sheet index has been updated to include new sheet C202

3.

Reference Attached Drawing C200 rev1 • Replace sheet C200 with C200 rev1. Two stepping stone paths have been replaced with standard sidewalks

4.

Reference Attached Drawing C202 • Add new sheet C202 to set. This sheet details the ramp at the SW corner of the intersections of St. Joseph Place and Riverbend Drive. • Reference Attached Drawing C300 rev1 • Replace sheet C300 with C300 rev1. Perforated pipes have been added beneath each playground surface. A waterline label has been fixed.

5.

one people + one environment = 2 form architecture

121 Lawrence Street, Eugene, OR 97401 | p: 541.342.5777 f: 541.342.6128 | www.2-form.com

LANDSCAPE 1. Specification Section 32-90-10 • Add 2.03, F, 1: Approved Substitution: Lane Forest Products Barnyard Compost 2. Reference Attached Documents AD1-L1 and AD1-L2 • Supplemental information from the tree felling decision. AD1-L1 describes the requirements for tree felling, and AD1-L2 indicates which trees are to be removed. 3. Reference Attached Drawing L2.0 rev1 • Two stepping stone paths have been replaced with standard sidewalks 4. Reference Attached Drawing AD1-L3 • Replace detail 6/L6.0 with the revised detail provided on AD1-L3

ARCHITECTURAL 1.

Reference Attached Drawing G001 rev1 • Replace sheet G001 with G001 rev1 • Sheet list has been updated to reflect new sheet C202

2.

Reference Attached Drawing A101 rev1, A601 rev1, AD1-A1 • Replace sheet A101 with A101 rev1 • Door 117 has been deleted, door 117 A has been added • Replace sheet A601 with A601 rev1 • Door type N has been added. Door schedule has been updated to reflect deletion of door 117 and addition of door 117A • Add hardware set 22.0 per attached drawing AD1-A1

3. Equipment Schedule, sheet A602 • Add “O.F.O.I” to E14 Front Load Washer • Add “O.F.O.I” to E15 Gas Dryer 4. Specification Section 08-52-00 Wood Windows • Add 2.3, H: Interior Finish: Field Finished, Interior Wood Polyurethane Varnish • Provide alternate bid for: Interior Finish: Factory Finish Clear Seal 5. Roof Plan Sheet A105 Key Notes • Revise Key Note 1 to read “Polycarbonate roofing over steel trellis” 6. Specification Section 08-45-13 Structured Polycarbonate-Panel Assemblies • Add 2.2, B, 4: Approved Substitution: Duo-Gard Series 3100 Polycarbonate Roof System with 16mm panels 7.

Reference Attached Drawing AD1-A2 • Sheet A602: At Exterior Finish: EX-1, Add text: “Pattern: Fleming bond, refer to drawing AD1-A2”

one people + one environment = 2 form architecture

121 Lawrence Street, Eugene, OR 97401 | p: 541.342.5777 f: 541.342.6128 | www.2-form.com

8.

Specification Sheet 099000 • Add text 3.10 Exterior Clear Finish Schedule • A. Accoya Wood Siding • 1. Clear Finish over Stain: One coat • 2. Basis of Design: Sansin “SDF Topcoat”

STRUCTURAL 1.

Reference Attached Drawing S201 rev1 • Replace S201 with attached S201 Rev 1. Revisions address City of Springfield plan review comments #3 (clarified shearwall ID’s at Rm 109), #4 (removed references to unused HD1, HD3,& SW3), and #5 (re-arranged room type callouts to avoid overlapping detail callouts). Architectural dimensions were also added, and drafting notations were adjusted to read more clearly.

2.

Reference Attached Drawing S202 rev1 • Replace S202 with attached S202 rev1. Revisions address City of Springfield comment #5, and drafting notations were adjusted to read more clearly.

3.

Reference Attached Drawing S302 rev1 • Replace S302 with attached S302 rev1. Revisions added details 18 through 21, and drafting notations were adjusted to read more clearly.

MECHANICAL 1.

Drawing M501 • Add note to Heat Recovery Outdoor Unit Schedule, fan coil schedule, and ERV schedule: “Provide with BACnet capability”

2.

Specification Section 23-81-29 Variable Refrigerant Flow HVAC Systems • Add Trane ProSpace VRF as an approved manufacturer. Must coordinate with electrical and all other trades. Ensure proper equipment clearances are met and access for maintenance is available through the access doors provided. Ensure proper clearance to other trades equipment are met. Provide with Bacnet capability

ELECTRICAL 1. Detail/E001 Power Riser Diagram • Clarification: Primary power conduits and utility transformer vault by utility. Secondary power conduit and wires by contractor. Coordinate installation details with serving utility. 2. Reference Attached Drawing AD1-E1 • Revised Electrical Room equipment and device layouts on sheets E101, E201, and E301 3. Reference Attached Drawing E004 Rev1 • Sheet E004 to be replaced with E004 Rev1 4. Sheet E201 •

At Doors E109, E112, W109, W112, provide additional recessed Type “X” fixture mounted adjacent to door at +12” AFF.

one people + one environment = 2 form architecture

121 Lawrence Street, Eugene, OR 97401 | p: 541.342.5777 f: 541.342.6128 | www.2-form.com

5. Sheet E301 •

In all Guest Suites, provide low frequency audible fire alarm notification device.

6. SPECIFICATION 26-05-33-3.1.B • Provide alternate bid for MC Cable in lieu of conduit where allowed by Code. NMC Cable is NOT ALLOWED.

ADDENDUM DRAWING ATTACHMENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23.

EC1.0 EC1.1 EC2.0 EC3.0 C100 rev1 C200 rev1 C202 C300 rev1 AD1-L1 AD1-L2 L2.0 rev1 AD1-L3 G001 rev1 A101 rev1 A601 rev1 AD1-A1 AD1-A2 S201 rev 1 S202 rev1 S302 rev1 E004 rev1 AD1 – E1 Heartfelt Construction Schedule 1

END ADDENDUM #1

one people + one environment = 2 form architecture