Submittal #7.0 09 6340 - Stone Flooring HITT Contracting Inc. 2900 Fairview Park Drive Falls Church, Virginia 22042 Phone: (703) 846-9000 Fax: (703) 846-9110
Project: 60533 - 1401 K Street 1401 K Street Northwest Washington, District of Columbia 20005
TRANSMITTAL
LTT -1 & LTT-2 Elevator Floor Sample SPEC SECTION:
09 6340 - Stone Flooring
CREATED BY:
Fidel Hernandez(HITT Contracting Inc. - HQ)
STATUS:
Submitted
DATE CREATED:
03/10/2016
ISSUE DATE:
03/10/2016
REVISION:
0
RESPONSIBLE CONTRACTOR:
RECEIVED FROM:
RECEIVED DATE: //
SUBMIT BY:
FINAL DUE DATE: 03/24/2016
LOCATION:
TYPE:
COST CODE:
APPROVERS:
Chris Wiley (Beyer Blinder Belle Architects & Planners, LLP)
BALL IN COURT: Chris Wiley (Beyer Blinder Belle Architects & Planne) DISTRIBUTION: Chris Wiley (Beyer Blinder Belle Architects & Planner), Charlie Smiroldo (First Potomac Management, LLC), Fidel Hernandez (HITT Contracting Inc. - HQ), Jennie Gwin (Beyer Blinder Belle Architects & Planner), Jennifer Ferrigno (First Potomac Management, LLC), Ricky Dolly (HITT Contracting Inc. - HQ), Todd Daniel (HITT Contracting Inc. - HQ) DESCRIPTION: ATTACHMENTS: WIN_20160309_104009.JPG WIN_20160309_103957.JPG
SUBMITTAL WORKFLOW NAME
Chris Wiley
SENT DATE
RETURNED DATE
3/10/2016
RESPONSE
ATTACHMENTS
COMMENTS
Pending
No exception taken. BBB/CEW
BY
HITT Contracting Inc.
DATE
COPIES TO
Page 1 of 2
Printed On: 03/10/2016 09:01 AM
2900 Fairview Park Drive HITT Contracting Inc. Falls Church, Virginia 22042
SUBMITTAL COVER SHEET 1401 K Street
Owner:
General Contractor: HITT Contracting
Designer:
Subcontractor:
MEP Engineer:
Interior Designer:
Structural Engineer:
Submittal
Rev.
Description
Submitted For:
7
0
LTT -1 & LTT-2 Elevator Floor Sample
Review & Approval
General Contractor's Approval:
Engineer's Approval:
Architect's Approval:
Consultant's Approval:
PROJECT # 6206.00 ✔ A B C
HITT CONTRACTING INC 1401 K STREET
REVIEWED
REVIEWED AS CORRECTED
REVISE AND RESUBMIT
REJECTED
FOR INFORMATION ONLY
Reviewed in accordance with AIA 201 and the Contract Documents. This submittal is in full compliance with the Construction Documents except as explicitly noted.
BY: Fidel Hernandez
DATE: 2/25/2016
SUBMITTAL #
DESCRIPTION
7 LTT -1 & LTT-2 Elevator Floor Sample
3307 M STREET, NW, SUITE 301 WASHINGTON, DC 20007 202 333 8000 SHOP DWG FILE #
SUBM.
REVIEWED BY
DATE RETURNED
SPEC #
Chris Wiley
096340
7
0
3/25/2016
SUBMITTAL REVIEWED FOR DESIGN AND GENERAL ARRANGEMENT ONLY AND IS SUBJECT TO CONTRACT DOCUMENTS. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE WITH ALL TRADES AND TO CHECK QUANTITIES & DIMENSIONS AGAINST FIELD CONDITIONS. CONTRACTORS SHALL ALSO REMAIN RESPONSIBLE FOR FABRICATION PROCESSES AND
DESCRIPTION FABRICATION, MANUFACTURE OR CONSTRUCTION MAY PROCEED, PROVIDING SUBMITTAL COMPLIES WITH CONTRACT DOCUMENTS. FABRICATION, MANUFACTURE OR CONSTRUCTION MAY PROCEED PROVIDING SUBMITTAL COMPLIES WITH ARCHITECT’S NOTATIONS AND CONTRACT DOCUMENTS. IF, FOR ANY REASON, CONTRACTOR CANNOT COMPLY WITH THE NOTATIONS, CONTRACTOR SHALL RESUBMIT. FABRICATION, MANUFACTURE OR CONSTRUCTION MAY NOT PROCEED. SUBMITTAL DOES NOT COMPLY WITH THE CONTRACT DOCUMENTS. RESUBMIT.
CONTRACTOR NOTE: ACTION CHECKED ABOVE DOES NOT AUTHORIZE CHANGES TO CONTRACT SUM OR CONTRACT TIMES UNLESS STATED IN SEPARATE LETTER OR CONSTRUCTION CHANGE AUTHORIZATION.