Submittal #033816.006.1 03 38 16 - Unbonded Posttensioned Concrete (S) Project: 565 - M-Line 3230 McKinney Avenue Dallas, Texas 75204

ANDRES CONSTRUCTION SERVICES LLC 3710 Rawlins Street Suite 1510 Dallas, Texas 75219 Phone: (214) 521-2118  Fax: 214-521-4620

P1 PT Shop Drawings SPEC SECTION:

03 38 16 - Unbonded Post-tensioned Concrete (S) 

CREATED BY:

Sam  Denyer (Andres Construction Services)

STATUS: 

Open

DATE CREATED:

07/18/2016 

ISSUE DATE:

07/18/2016  

REVISION:

1

RESPONSIBLE CONTRACTOR:

Capform Incorporated

RECEIVED FROM:

Anthony  Lopez

RECEIVED DATE:   //

SUBMIT BY: 

05/23/2016  

FINAL DUE DATE: 07/25/2016

LOCATION: 

Level P1 

TYPE:

Shop Drawings

COST CODE: 

APPROVERS:

Michael Reyes (Good Fulton & Farrell Architects)

BALL IN COURT: Sam  Denyer (Andres Construction Services) DISTRIBUTION: Cliff  Wood (TRAMMELL CROW COMPANY) , Jeff Robinson (Raymond L. Goodson) , Stephen Miller (Andres Construction Services) , Jay Dreiling (Good Fulton & Farrell Architects) , Sam  Denyer (Andres Construction Services) , Al Castillo (Andres Construction Services) , Chandler Brooks (Andres Construction Services) , Conner Best (TRAMMELL CROW COMPANY) , Travis Andres (Andres Construction Services) DESCRIPTION: Level P1 Post-Tension Shop Drawings        ***REVISED PER ASI#08 and ASI#1***     PT-4.00 - Level P1/Garage Post-Tension Tendon Layout PT-4.01 - Level P1/Garage Uniform Tendon Support Layout PT-4.02 - Level P1/Garage Beam Profiles and Anchor Details PT-4.03 - Level P1/Garage Beam Profiles and Anchor Details PT-4.04 - Level P1/Garage Beam Profiles and Anchor Details PT-4.05 - Level P1/Garage Beam Profiles and Anchor Details PT-4.06 - Level P1/Garage Beam Profiles and Anchor Details PT-4.07 - Level P1/Garage Beam Profiles and Anchor Details ATTACHMENTS:

  SUBMITTAL WORKFLOW #

NAME

SUBMITTER/ APPROVER

SENT DATE

DUE DATE

7/18/2016

7/18/2016

Pending

7/25/2016

Pending



Sam  Denyer

Submitter 



Michael Reyes

Approver 

RETURNED RESPONSE DATE

ATTACHMENTS

COMMENTS

   

Project: M-Line Tower Date: 07/18/2016 Reviewed By: Sam Denyer BYSubmittal

#: 095-033816.006.1

rev.00 DATE

This submittal is subject to strict compliance with the plans and specifications. No deviations are permitted unless specifically authorized in writing. Andres Construction Services is not responsible for any discrepancies between this submittal and contract plans and specifications, ANDRES CONSTRUCTION SERVICES LLC Page 1 of 1 nor for any error in dimensions or quantities on this submittal.

COPIES TO

Printed On: 07/18/2016  01 :43 PM

07/19/16

JR

CORRECT PER RAMP SLOPES

OK AS SHOWN - GC SHALL PROVIDE BEAM SHEAR KEY AND 4-#6 x 6'-0" SHEAR DOWELS CENTERED ON JOINT

9" C.G.S. PER ASI #15 30x30 PER ASI #15

18" C.G.S. OK

9" C.G.S. PER ASI #15

9" C.G.S. PER ASI #15

Submittal #033816.006.0 03 38 16 - Unbonded Posttensioned Concrete (S) Project: 565 - M-Line 3230 McKinney Avenue Dallas, Texas 75204

ANDRES CONSTRUCTION SERVICES LLC 3710 Rawlins Street Suite 1510 Dallas, Texas 75219 Phone: (214) 521-2118  Fax: 214-521-4620

P1 PT Shop Drawings SPEC SECTION:

03 38 16 - Unbonded Post-tensioned Concrete (S) 

CREATED BY:

Sam  Denyer(Andres Construction Services)

STATUS: 

Open

DATE CREATED:

05/23/2016 

ISSUE DATE:

05/23/2016 

REVISION:

0

RESPONSIBLE CONTRACTOR:

Capform Incorporated

RECEIVED FROM:

Anthony  Lopez

RECEIVED DATE:   05/20/2016

SUBMIT BY: 

05/23/2016 

FINAL DUE DATE: 06/06/2016

LOCATION: 

Level P1 

TYPE:

Shop Drawings

COST CODE: 

APPROVERS:

Michael Reyes (Good Fulton & Farrell Architects)

BALL IN COURT: Sam  Denyer (Andres Construction Services) DISTRIBUTION: Cliff  Wood (TRAMMELL CROW COMPANY), Jeff Robinson (Raymond L. Goodson), Stephen Miller (Andres Construction Services) , Jay Dreiling (Good Fulton & Farrell Architects), Sam  Denyer (Andres Construction Services), Al Castillo (Andres Construction Services) , Chandler Brooks (Andres Construction Services), Conner Best (TRAMMELL CROW COMPANY), Travis Andres (Andres Construction Services) DESCRIPTION: Level P1 Post-Tension Shop Drawings     PT-4.00 - Level P1/Garage Post-Tension Tendon Layout PT-4.01 - Level P1/Garage Uniform Tendon Support Layout PT-4.02 - Level P1/Garage Beam Profiles and Anchor Details PT-4.03 - Level P1/Garage Beam Profiles and Anchor Details PT-4.04 - Level P1/Garage Beam Profiles and Anchor Details PT-4.05 - Level P1/Garage Beam Profiles and Anchor Details PT-4.06 - Level P1/Garage Beam Profiles and Anchor Details PT-4.07 - Level P1/Garage Beam Profiles and Anchor Details ATTACHMENTS:

  SUBMITTAL WORKFLOW #

NAME

SUBMITTER/ APPROVER

SENT DATE

DUE DATE

RETURNED RESPONSE DATE



Sam  Denyer

Submitter 

5/23/2016

Pending



Michael Reyes

Approver 

6/6/2016

Pending

ATTACHMENTS

COMMENTS

   

Project: M-LINE TOWER Date: 05/23/2016 Reviewed By: Sam Denyer

rev.00

Submittal #: 087-033816.006 This submittal is subject to strict compliance with the plans and specifications. No deviations are permitted unless specifically authorized in writing. Andres Construction Services is not responsible for any discrepancies between this submittal and contract plans and specifications, nor for any error in dimensions or quantities on this submittal.

BY

ANDRES CONSTRUCTION SERVICES LLC

DATE

Page 1 of 1

COPIES TO

Printed On: 05/23/2016 09:20 AM

06/08/16

JR

PARTIAL REVISE AND RESUBMIT: RESUBMIT STAIR 1 FRAMING WITH REVISIONS PER ASI #08 AND #10.

Submittal No.

033816.006 - P1 PT Shop Dwg

No exception taken By: Make corrections noted Date: Submit specified item Revise and resubmit Rejected Not reviewed by GFF ■ See consultants action stamp

M.I.R. 06/09/16

“Checking is only for general conformance with the design concept of the work and general compliance with the information given in the Contract Documents. Any action hereon by Architect is subject to contractor’s duties and responsibilities as noted in the Contract Documents and in AIA Document B101 current as of date of action, except to the extent of conflict with the Contract Documents in which case they govern.”

GFF, INC. 2808 FAIRMOUNT STREET, SUITE 300 DALLAS, TEXAS 75201 (214)303-1500 (214)303-1512 www.gff.com

KEEP C.J. CONT, DO NOT STEP. EXTEND TENDONS OVER PG32 @ MID DEPTH TO C.J.

OK - SEE 06/S6.01 FOR SIM CONDITION

REVISE AND RE-SUBMIT PER ASI REVISIONS. SEE SUBMITTAL STAMP NOTES OK

VERIFY SLAB TENDON CGS PER ASI #08 REVISIONS

14 1/4" CGS REF ASI #8

CORRECT PER RAMP SLOPES

REF ASI #8

REF ASI #8

GC VERIFY ADD'L RQMNTS AT POUR STRIP PER 07/S6.05

14" CGS PER SCHED

OK - SEE 06/S6.01 FOR SIM CONDITION

REF ASI #8