The Lodge at Takoma Junction Revised Proposal The Lodge at ...

Report 13 Downloads 89 Views
The Lodge at Takoma Junction by The Ability Project Summary of Revisions to Original Proposal Revisions have been proposed in response to community input and to demonstrate flexibility and responsiveness to City and community input. These changes are intended as a next step in an inclusive and collaborative process, not as a final proposal. • Lower overall density to reduce traffic. • Residential and preschool uses deleted. • Proposed uses limited to Ability Project and TPSS Coop • Sharing Takoma Junction lot, plus Turner property. • Community open space at corner of Carroll and Sycamore Aves. • Parking provided for expanded Coop PLUS surrounding businesses. • Specific plan for continuity of Coop operations throughout construction • Innovative use of Columbia Ave. lot (“R‐60 lot”) for Anacostia Watershed protection and environmental education

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Community Open Space

Proposal limited to 2 users plus community  functions Renovated Turner building could  accommodate TPSS Coop, or  Ability Project New structure could accommodate TPSS Coop, or Ability Project

R‐60 Lot Reserved for Community and  Environmental Education

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Community Open Space – expanded to corner

“Learning Grove will  feature Bay protection  and educational exhibits The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Parking could be ‐ one level at surface, plus ‐ one level under ground, or ‐one level above‐grade deck

Parking expansion to  accommodate local  businesses

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Phasing Plan demonstrates Coop can remain in operation – Including truck dock – throughout construction  The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Phase 1 – build new parking deck

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Phase 2 – Construct new  building for Coop or Ability Project

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

New community open space

Phase 3 – Occupy new building, construct and open final parking and community open space

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

Anacostia Watershed Protection

The Lodge at Takoma Junction Revised Proposal November 2015 The Ability Project

TPSS/Ability Project redevelopment includes  construction of storm water  retention/treatment of multiple properties  from Fire Station to/including Carroll,  Sycamore and Columbia Aves.