The Portuguese Creek Mine Platinum and Gold

Report 30 Downloads 142 Views
The Portuguese Creek Mine Platinum and Gold Unlocking precious metals from volcanic rock.

Location: Geology: Rock Type:

South Central Idaho Super Volcano Basaltic Moonstone Rhyolite

Super Volcano History: Snake River Plane

Portuguese Creek Mine February 18, 2011

Comparative Mineral Occurrences:

Merenski Reef (Bushfeld) UG-2 Layer (Bushfeld) JM Reef Stillwater, Montana Kambalda, Australia Agnew, mineralized flow Lac des Isles Canada Portuguese Creek, Idaho (estimated)

Portuguese Creek Mine

Pt + Pd ppm 4.6 5.0 30.3 0.75 0.48 21.0 680

Sulfur % 0.55 0.02 0.43 8.1 13.0 0.2 0.2

Development Protocols for Portuguese Creek: Pre-Feasibility:    

   

Surface sampling (complete) Assay analysis on surface samples (positive) BLM land claim applications (complete) Stake claims / record claims with County (complete) State and Federal agencies filings (Complete) Claim fees filed and paid (Paid through 8-31-12) Number of Claims: 70 Land Area: 2 1/2 square miles

Portuguese Creek Mine

Development Protocols for Portuguese Creek: (continued)

Feasibility: 

Drill Core holes (complete)



Core holes analyzed through reliable and repeatable analytical method (complete)



Internal and external valuations (complete)

Independent lab validations and verification of precious metals (complete) •



Tons in drilling grid: 50 million reserve tons



Pilot tested halide leach process (completed twice: 2004/05, 2009) Portuguese Creek Mine

Development / Pilot Plant / Operations: Eco-friendly commercial process (no cyanide):    

Halogen Leach Recycle of all solutions / No discharge Tailings have no hazardous metals or minerals State and Federally Permitted / DEQ/ MSHA

Collection method:  

Ion Exchange Resins Bulk Sample permits submitted (complete) 

2600 tons ready to process

Tons processed through piloting: 120 Metals recovered: Platinum / Gold / Rhodium / Rubidium Portuguese Creek Mine

Development / Pilot Plant / Operations: Operational Pilot Plant Proven Economics: Metal Recovered onto Resins:  Platinum  Gold  Rhodium  Rubidium Mineralogical Rare Earth Elements Found:  Cerium Rubidium  Lanthanum Neodymium  Yttrium Niobium Portuguese Creek Mine

Market for Precious Metals: 

No significant production of Platinum, Palladium or Rhodium in the USA’s lower 48



Ninety-seven percent of these metals are produced from Russia or South Africa

Sales of Metals:   

Direct to refiner Sale to end users Open market sales once refined

Portuguese Creek Mine

Technology: 

Halide Leaching = 150+ years old   



Newly developed and modified Primary 95% ingredient = Sodium Chloride (table Salt) Non Selective  Solublize’s all metals not just gold or silver

Metal absorption from Halide Leach with Ion Exchange Resins •

• •

Dow Chemical and others have developed resins specific to the halide leach. They absorb precious metals out of a halide solution. Resins are readily available Refiners can refine them Portuguese Creek Mine -

Funding Need: 

2,600 Tons Per Year  $3,000,000 - $5,000,000



1000 Ton per day operations  $50 million



2000 Ton per day operations  $100 million



5000 Ton per day operations  $250 million



Mine Life at 1000 tons per day = 150 years Mine Life at 2000 tons per day = 75 years Mine Life at 5000 tons per day = 30 years

 

Portuguese Creek Mine -

Portuguese Creek Partnership LLLP: State of Incorporation: Colorado Place of Business: Corporate Office – Colorado Mining Operations, Mining Claims / Permitted Plant and Facility on 9 acres – Idaho

Portuguese Creek Mine

Corporate Structure: 

Portuguese Creek Management LLC  Operator of the Portuguese Creek Partners LLLP assets  3% Non-diluted interest in PCP LLLP



Portuguese Creek Partners LLLP  Equity Unit Holders as Limited Liability Limited Partners    



9 LLLP Unit Holders

Claim and assets owner Building Guarantor Line of Credit Guarantor

Resources Opportunity Corporation  Operator of Mine  Developed Technology, Halide leach, Assay methods  State, Local and MSHA Permit Holder for plant operations

Portuguese Creek Mine -

Team Members: 

James Dascalos   

Managing General Partner / Portuguese Creek Management LLC President / Resources Opportunity Corp, (ROCI) Investment Banking 18 years  

   



Commercial Real Estate Development / Frawley Ranch Development President Restaurant ownership Corporate Governance / Boards and Management / Sox Training Red Rocks Community College Foundation Board Vice President / Former Club Board President / Former Broker Dealer Director, manager

Whit Allen 

DOE Government Renewable Energy Lobbyist 

  



Private and Public Money Raises Specialty – M&A – Private Placement Funding

Advisor to Top Washington Lobbying Firms for CleanTech and renewable energy Companies and technology

Strategic market and product and business planning and development worldwide Corporate Governance / Board and Management positions Master's degree (International MBA) from the Thunderbird School of Global Management / Bachelor of Science degree in Electrical Engineering from Texas A&M University.

Alex Duncan Agricultural Commodities Grain Trader / Broker 25 years -

World wide exporter / importer of grains Hedge and derivative Trader / Northern Sales Company 13 years University of Manitoba with a degree in Economics.

Portuguese Creek Mine -

Board of Advisors: 

Dr. John Trefny 

 



Former President Colorado School of Mines 9 years  Professor of Physics and Head of the Department of Physics Colorado Board of Education Chair Undergraduate education at Fordham University and his Ph.D. In Physics from Rutgers University

Yani Roditis 

Mine Engineer 28 Years   





Barrick Gold Corp / Chili, Argentina Gabriel Resources / Toronto / Romania Taranga Resources / Toronto /

Two Master of Science degrees from the University of Arizona, as well as a Bachelor of Science degree from the National Technical University in Athens, Greece.

Paul Gates  Mine Engineer 25 Years 



Vice President Operations ROCI  Pincock Allen and Holt Engineering  Newmont Gold Corp / Indonesia  Phelps Dodge Corp / Arizona Mr. Gates has a MBA from Western New Mexico University, and a BS in Mining Engineering from Montana College of Mineral Science and Technology in Butte Montana.

Portuguese Creek Partnership Contact Information: 

James Dascalos Managing General Partner

Mailing Address: 6614 Stuart Court Arvada, Colorado 80003 Tel. 303-650-2762 Cell: 303-618-9621

Email. [email protected] Website: www.portuguesecreekmine.com

Plant Address: Portuguese Creek Partners LLLP. 1992 E. 1775 So. Gooding, Idaho 83330 Portuguese Creek Mine -

Forward Looking Statements: The information contained herein is a supplement to additional confidential information of the Portuguese Creek Partnership. No reproduction or distribution of information is permitted without the written consent of the Partnership. The financial forecasts described herein are forward-looking statements that assume that a full production facility will someday be built, including matters of opinion or strategies regarding the future and the Partnerships reserve estimate. Readers should not place undue reliance on forward-looking statements. which are assumptions and estimates subject to various risks and uncertainties. The Partnerships actual results could differ materially from those discussed in such forward-looking statements.

Portuguese Creek Mine -