Town Center Core

Report 0 Downloads 80 Views
Morrisville, NC

Town Center Core Development Partner Submissions

Meeting Agenda • Developer Outreach Process • Developer Submissions – Armada Hoffler – Castle Development Partners – Greystar • Proposal Comparisons • Next Steps

Developer Outreach Process

Request for Proposal Timeline RFP Approved

RFP’s Due

Town Council Review of Proposals

Development Agreement

RFP Approved Developer Outreach Developer Proposal Review Developer Selection Memorandum of Understanding/Negotiation Development Agreement

August 2017

Fall 2017

November 30th

January 2018

Summer 2018

DFI RFP Outreach• 55 Development Firms contacted to gauge interest in project – Firms identified for regional experience, expertise in mixed-use development and quality of work – Outreach conducted through emails, phone conversations and conferences – 30 firms expressed interest in learning more about project

• 4 Site Visits conducted with interested development firms – Site walks, tour of project area, discussion of future phases of Town Center Core

• 3 Proposals submitted by qualified development teams

Developer Submissions

RFP Evaluation Criteria • Qualifications and Experience of Development Team • Quality of the Proposed Design Concept –

Ability to incorporate Required Design Elements



Ability to incorporate Preferred Design Elements

• Quality of the Concept to Align with Public Interests • Financial Benefits to the Town • Capacity of Development Team to execute project • Quality of proposals to align with stated public participation terms –

Sell land at Fair Market Value



Master lease the ground floor of parking in deck

• Submission of all elements asked within the RFP Disclaimer: Received proposals are non-binding and do not represent the final design or development program. Those items would be finalized during development agreement.

Armada Hoffler Properties

Armada Hoffler- Development Team Team Member

Mixed-Use Experience

PPP Partnered w/ Experience Developer

Developer- Armada Hoffler Properties





N/A

Architect- Built Form Architecture







General Contractor- Armada Hoffler Construction







Relevant Project

Description

Virginia Beach, VA Town Center

PPP Town Center with over 3M SF of development

4525 Main St.- Virginia Beach, VA

286 Residential Units/ 23k SF retail/ 950 space parking deck

Whetstone- Durham, NC

204 Residential Unit project/ Structured Parking

Armada Hoffler- Design Concept Program Elements Residential Units

172 Units

Commercial Space

20,000SF

Structured Parking

358 Spaces

Surface Parking

51 Spaces

Site

3.5 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.



Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

10

Armada Hoffler- Public Interests Public Interests

Does Concept Achieve this Interest?

Does Concept Plan fit into larger Town Center Core Vision?

Yes

Does Plan create a vibrant, walkable downtown environment?

Yes

Does plan preserve Morrisville’s historic core?

Yes

Does proposal minimize public investment?

(next slide)

Notes

Armada Hoffler- Financial Analysis Investment

Amount

Total Project

$37,000,000

Site Acquisition

$760,000

Parking Strategy

Notes $190,000/Acre Town assumes cost recovery lease of portion of parking deck from AH*

* Number of spaces and length of lease to be determined with more analysis if selected. DFI estimates the cost recovery rate for the parking structure at approximately $140/space/month.

Armada Hoffler- Developer Capacity Capacity Financial Capacity

Ability

Notes 

Defaults

None

Disclosures

None

Begin Construction (Date)

Mid 2019

Armada Hoffler- Other Y/N Original Submission Package include all required elements?

Yes

Submission package arranged in cohesive manner?

Yes

Does development team ask for options for future phases?

Yes

Notes

Right of first refusal on future development tracts.

Armada Hoffler- Rendering

Castle Development Partners

Castle Development Partners- Development Team Team Member

Mixed-Use Experience

Developer- Castle Development Partners Architect- Fugleberg Koch, PLLC

PPP Experience

Partnered w/ Developer

None stated in proposal

Low-Income Housing Tax Credit (LIHTC) Deals Only

N/A







General Contractor- Summit Contractors

Relevant Projects

Description

Arden Place- Charlottesville, VA

212 residential unit project

Beacon on 5th- Charlottesville, VA

241 residential unit project

Adams Crossing- Waldorf, MD

213 residential unit project

Castle Development Partners- Design Concept Program Elements Residential Units

283 Units

Commercial Space

35,000 SF

Structured Parking

351 Spaces

Surface Parking

164 Spaces

Site

6 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.



Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

18

Castle Development Partners- Public Interests Public Interests

Does Concept Achieve this Interest?

Does Concept Plan fit into larger Town Center Core Vision?

Yes

Does Plan create a vibrant, walkable downtown environment?

Yes

Does plan preserve Morrisville’s historic core?

Yes

Does proposal minimize public investment?

(next slide)

Notes

Plan includes a clubhouse along Carolina Street that could be flex retail space

Castle Development Partners- Financial Analysis Investment

Amount

Total Project

$42,300,000

Site Acquisition

$685,000

Parking Strategy

Notes $114,000/Acre Town lease parking spaces in the deck for $50/space/month*

* Castle willing to negotiate with Town on number of spaces and length of lease. ** DFI estimates a cost recovery rate for the parking deck of approximately $140/space/month

Castle Development Partners- Developer Capacity Capacity Financial Capacity

Ability

Notes 

Defaults

None

Disclosures

None

Begin Construction (Date)

Q1 2019

18-20 month construction period

Castle Development Partners- Other Y/N

Notes

Original Submission Package include all required elements?

No

Missing renderings, team structure, financial capacity and had several discrepancies in package

Submission package arranged in cohesive manner?

No

Missing elements and plan was illegible

Does development team ask for options for future phases?

Yes

Right of first refusal on future residential sites

Castle Development Partners- Rendering

Greystar Development Group

Greystar- Development Team Team Member

Mixed-Use Experience

PPP Partnered w/ Experience Developer

Developer- Greystar Development Group





N/A

Architect- Cline Design







General Contractor- Greystar Dev. Construction







Relevant Projects

Description

Elan City Center- Raleigh, NC

213 Residential Unit project/ Structured Parking

Overture Crabtree- Raleigh, NC

203 Residential Unit project/ Structured Parking

Elan Midtown- Charleston, SC

200 Res. Units/ 7,000 SF retail project/ Structured parking

Elan Station R- Atlanta, GA

285 Res. Units/ 16,000 SF retail/ Structured Parking

Greystar- Design Concept Program Elements Residential Units

305 Units

Commercial Space

-

Structured Parking

348 Spaces

Surface Parking

194 Spaces

Site

5.4 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.

-

Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

26

Greystar- Public Interests Public Interests

Does Concept Achieve this interest?

Notes

Does Concept Plan fit into larger Town Center Core Vision?

Yes

Plan doesn’t incorporate commercial space but identifies future commercial development pad.

Does Plan create a vibrant, walkable downtown environment?

No

The plan does not incorporate commercial space into the program

Does plan preserve Morrisville’s historic core?

Yes

Does proposal minimize public investment?

(next slide)

Greystar- Financial Analysis Investment

Amount

Total Project

$48.5M

Site Acquisition

$1,228,537

Parking Strategy

Notes $225,000/Acre Town reimburses Greystar for full cost of deck during construction estimated by Greystar at $7.5M.* Town gets access to 70 spaces in deck**

* This is an infeasible deal structure ** With $7.5M loan, 3% Interest, 20 year amortization, the Town would pay approx. $600 per public space/month in debt service.

Greystar- Developer Capacity Capacity Financial Capacity

Ability

Notes 

Defaults

None

Disclosures

None

Begin Construction (Date)

3/2019

Units delivered in Q3 2020

Greystar- Other Y/N

Notes

Original Submission Package include all required elements?

No

Missing renderings

Submission package arranged in cohesive manner?

Yes

Does development team ask for options for future phases?

Yes

Option to purchase future blocks after completion of Phase I

Greystar

Proposal Comparison

Proposal Comparison- Team Experience Armada Hoffler

Castle DP

Greystar

Mixed-Use Experience



No mixed-use development experience



Public Private Partnership Experience



LIHTC deals only



Team Structure Experience







Proposal Comparison- Program Metrics Armada Hoffler

Castle DP

Greystar

Site

3.5 Acres

6 Acres

5.4 Acres

Residential Units

172 Units

283 Units

305 Units

Commercial Space

20k SF

35k SF

-**

Structured Parking

358*

351

348

51

164

199

Surface Parking (within site)

*Armada Hoffler stated they may decrease the size of the deck based on shared parking opportunities. AH would complete this study during due diligence period if selected. ** Greystar did not include any commercial space in the development program but identified a commercial pad along Carolina St. as a future phase.

Proposal Comparison- Public Interests Armada Hoffler

Castle DP

Greystar

Does Concept fit into Larger town Center Core vision?







Does Plan create a vibrant, walkable downtown environment?





No commercial space

Does Plan preserve Morrisville’s historic core?







Town enters into cost recovery lease for set # of spaces

Town leases parking at $50/space/month

Town assumes full cost of deck

Does proposal minimize public investment?

Proposal Comparison- Financials Armada Hoffler Total Project Cost Acquisition Price per Acre Parking Strategy

Castle DP

Greystar

$37M

$42.3M

$48.5M

$190k/acre

$114k/acre

$225k/acre

Town lease a set number of spaces in parking deck for $50/space/month

Town reimburses Greystar for full parking deck costs estimated by Greystar at $7.5M

Town lease a portion of parking deck at cost-recovery rate*

* Number of spaces and length of lease to be determined with more analysis if selected. DFI estimates the cost recovery rate for the parking structure at approximately $140/space/month.

Proposal Summary Matrix Developer

Team Experience

Design Public Minimize Concept Interests Public Costs

Armada Hoffler

Mixed Use and PPP Experience

6/6 Required and preferred design elements

3/3 Public Interests

TBD with lease terms for parking deck

Ability to secure financing and begin project in timely manner

Castle

No Mixed Use and only LIHTC PPP experience

6/6 Required and Preferred design elements

3/3 Public Interests

TBD with lease terms for parking deck

Ability to secure financing and begin project in timely manner

Greystar

Mixed Use and PPP Experience

5/6 Required and Preferred design elements*

2/3 Public Interests*

Town assumes full cost of deck upfront

Ability to secure financing and begin project in timely manner

* Due to lack of commercial space in proposed program.

Developer Capacity

Next Steps • Town Council review proposals on January 9th • Town Council work session on January 16th • Town Council resolution for preferred developer on January 23rd