Town Center Core

Report 1 Downloads 152 Views
Morrisville, NC

Town Center Core Development Partner Submissions

January 9, 2018

Meeting Agenda • Developer Outreach Process • Developer Submissions – Armada Hoffler – Castle Development Partners – Greystar • Proposal Comparisons • Next Steps

Developer Outreach Process

Request for Proposal Timeline RFP’s Due

RFP Approved

Town Council Review of Proposals

Development Agreement

RFP Approved Developer Outreach Developer Proposal Review Developer Selection Memorandum of Understanding/Negotiation Development Agreement

August 2017

Fall 2017

November 30th

January 2018

Summer 2018

DFI RFP Outreach• 55 Development Firms contacted to gauge interest in project – Firms identified for regional experience, expertise in mixed-use development and quality of work – Outreach conducted through emails, phone conversations and conferences – 30 firms expressed interest in learning more about project

• 4 Site Visits conducted with interested development firms – Site walks, tour of project area, discussion of future phases of Town Center Core

• 3 Proposals submitted by qualified development teams

Developer Submissions

RFP Evaluation Criteria • Qualifications and Experience of Development Team • Quality of the Proposed Design Concept

• • • •



Ability to incorporate Required Design Elements



Ability to incorporate Preferred Design Elements

Quality of the Concept to Align with Public Interests Financial Benefits to the Town Capacity of Development Team to execute project Quality of proposals to align with stated public participation terms –

Sell land at Fair Market Value



Master lease the ground floor of parking in deck

• Submission of all elements asked within the RFP Disclaimer: Received proposals are non-binding and do not represent the final design or development program. Those items would be finalized during development agreement.

Armada Hoffler Properties

Armada Hoffler- Design Concept Program Elements Residential Units

172 Units

Commercial Space

20,000SF

Structured Parking

358 Spaces

Surface Parking

51 Spaces

Site

3.5 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.



Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

9

Castle Development Partners

Castle Development Partners- Design Concept Program Elements Residential Units

283 Units

Commercial Space

35,000 SF

Structured Parking

351 Spaces

Surface Parking

164 Spaces

Site

6 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.



Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

11

Greystar Development Group

Greystar- Design Concept Program Elements Residential Units

305 Units

Commercial Space

-

Structured Parking

348 Spaces

Surface Parking

194 Spaces

Site

5.4 Acres

Library in SW corner



Library Parking needs for met



Multi-Family anchors private use



Foxglove Dr. Ext. in current align.



Commercial use along Carolina St.

-

Visual Screening of Parking Deck



Required Design Elements Preferred Design Elements

13

Proposal Comparison

Proposal Comparison- Team Experience Armada Hoffler

Castle DP

Greystar

Mixed-Use Experience



No mixed-use development experience



Public Private Partnership Experience



LIHTC deals only



Team Structure Experience







Proposal Comparison- Program Metrics Armada Hoffler

Castle DP

Greystar

Site

3.5 Acres

6 Acres

5.4 Acres

Residential Units

172 Units

283 Units

305 Units

Commercial Space

20k SF

35k SF

-**

Structured Parking

358*

351

348

51

164

199

Surface Parking (within site)

*Armada Hoffler stated they may decrease the size of the deck based on shared parking opportunities. AH would complete this study during due diligence period if selected. ** Greystar did not include any commercial space in the development program but identified a commercial pad along Carolina St. as a future phase.

Proposal Comparison- Public Interests Armada Hoffler

Castle DP

Greystar

Does Concept fit into Larger town Center Core vision?







Does Plan create a vibrant, walkable downtown environment?





No commercial space*

Does Plan preserve Morrisville’s historic core?







Town enters into cost recovery lease for set # of spaces

Town leases parking at $50/space/month

Town assumes full cost of deck

Does proposal minimize public investment?

*Vibrancy and walkability was based on the establishment of a retail corridor and incorporation of ground floor retail along that corridor.

Proposal Comparison- Financials Armada Hoffler Total Project Cost Acquisition Price per Acre Parking Strategy

Castle DP

Greystar

$37M

$42.3M

$48.5M

$190k/acre

$114k/acre

$225k/acre

Town lease a set number of spaces in parking deck for $50/space/month

Town reimburses Greystar for full parking deck costs estimated by Greystar at $7.5M

Town lease a portion of parking deck at cost-recovery rate*

* Number of spaces and length of lease to be determined with more analysis if selected. DFI estimates the cost recovery rate for the parking structure at approximately $140/space/month.

Proposal Summary Matrix Developer

Team Experience

Design Public Minimize Concept Interests Public Costs

Armada Hoffler

Mixed Use and PPP Experience

6/6 Required and preferred design elements

3/3 Public Interests

TBD with lease terms for parking deck

Ability to secure financing and begin project in timely manner

Castle

No Mixed Use and only LIHTC PPP experience

6/6 Required and Preferred design elements

3/3 Public Interests

TBD with lease terms for parking deck

Ability to secure financing and begin project in timely manner

Greystar

Mixed Use and PPP Experience

5/6 Required and Preferred design elements*

2/3 Public Interests*

Town assumes full cost of deck upfront

Ability to secure financing and begin project in timely manner

* Due to lack of commercial space in proposed program.

Developer Capacity

Next Steps • Town Council work session on January 16th • Town Council resolution for preferred developer on January 23rd • MOU spring 2018 • Development Agreement summer 2018

Questions