Traffic Study Glenn Cook Sr. VP Paul Dorr Dir. Eng. Design
TTG Project Involvement • • • • • • • •
TTG Began working on Project April 2016 Assisting w/ Loading / Truck Simulations Assisting w/ Site Design Assisting w/ Internal Garage Traffic Vehicle Counts Pedestrian Counts Traffic Study Intersection Designs
Traffic Study • • • • •
Existing Traffic Background Traffic Total Traffic AM Peak = 7:30-8:30 PM Peak = 5:15-6:15 Site Traffic AM = 47 In / 12 Out PM = 70 In / 94 Out
• •
Prepared a Model Study Total Traffic Improvement Options
Delay Info:
Existing Paved Lot Info • •
Existing Lot contains Approximately 49 Painted Spaces with Co-Op Loading area. Passenger vehicles including delivery trucks access the paved lot midway between signals.
Proposed Garage Info • •
Proposed underground garage contains 70 Parking Spaces. Garage access is located along western side.
Improvement Alternatives
Improvement Alternatives
Improvement Alternatives
Improvement Alternatives
Improvement Alternatives
Intersection Improvement
Proposed Traffic Signal Phasing Phase 1 – NB Sycamore Avenue Phase 2 – SB Carroll Avenue Phase 3 – EB to NB Sycamore Avenue Phase 4 – EB & WB Ethan Allen Avenue
P E D S
Proposed Traffic Signal Phasing Phase 1 – NB Sycamore Avenue Phase 2 – SB Carroll Avenue Phase 3 – EB to NB Sycamore Avenue Phase 4 – EB & WB Ethan Allen Avenue
RETURN P E D S
Proposed Traffic Signal Phasing Phase 1 – NB Sycamore Avenue Phase 2 – SB Carroll Avenue Phase 3 – EB to NB Sycamore Avenue Phase 4 – EB & WB Ethan Allen Avenue
RETURN P E D S
Proposed Traffic Signal Phasing Phase 1 – NB Sycamore Avenue Phase 2 – SB Carroll Avenue Phase 3 – EB to NB Carroll Avenue Phase 4 – EB & WB Ethan Allen Avenue
RETURN P E D S
Proposed Traffic Signal Phasing
RETURN P E D S
Phase 1 – NB Sycamore Avenue Phase 2 – SB Carroll Avenue Phase 3 – EB to NB Carroll Avenue Phase 4 – EB & WB Ethan Allen Avenue
EB to NB Carroll Ave must Yield to WB.
Existing Truck Deliveries
Co-Op Existing Loading
Loading Area
Profile View
Loading Area
Loading Area
Profile View
Truck Handout
13 min. 3.5 miles
(Please Circle Back - Map) Left onto Piney Branch Rd. MD 320
Left onto Philadelphia Ave. MD 410
Left onto Flower Ave. MD 787
North Carroll Ave. MD 195
Capital Bike Share Station Re-location
Existing Site Access 1. Existing Site 49 parking spaces 2. All Existing Truck Deliveries
Proposed Site Access 1. 2. 3.
Existing Site 49 parking spaces All Existing Truck Deliveries Plus all movements for Auto Clinic
Proposed Site Access 1. 2. 3. 4.
Proposed Site 72 parking spaces (23 more). No more trucks crossing pedestrian paths. Reduced number of vehicle movements. Trucks do not cross truck path in loading lane.
Bus Stop Locations