UNION GAS PIPELINE PROJECT NOTICE OF PROJECT COMMENCEMENT AND PREFERRED ROUTE Guelph Reinforcement Project To ensure the continued reliable, safe delivery of natural gas and serve an increased demand in the City of Guelph and surrounding area, Union Gas Limited (Union Gas) is proposing to construct a new natural gas pipeline. The proposed pipeline is approximately 4.0 kilometres in length and would begin at the existing Union Gas station located on Wellington Road 34, approximately 400 metres east of Wellington Road 35 in the Township of Puslinch, and end at the existing Union Gas station located on Forestell Road, approximately 400 metres east of Wellington Road 35 in the City of Guelph. The Preferred Route is located entirely within municipal road allowances and specifically, along the east side of Wellington Road 35. ad
d
$ $
oa
et
R
W es d oa r
St re
y al tb M To C it w ns y o fG hi p of uel Pu ph sl in ch
ay
6
C
on
ce s
20 N
ro a d
orth
Side
si
on
R
oa
d
7
Legend Study Area
10 N orth
_ ^
Preferred Route Cre
oy le
34
Expressway / Highway
Ab e Road
rf
Ro a d
^ Existing Station ek _
401
Waterbody Municipal Boundary
Ro a
H
ay ighw
Watercourse
gt on
ek
in Well
Cr e
w
road
ad 4
gton Wellin
0
2
2 km
ro a d
Mill Cre ek
Notes
o u th 20 S
ad n Ro essio Co n c
1
S i de
d 35
Iris h
ig h
Side
n Ro essio Co n c
n
C
d
ll reste
County Of Wellington
R
H
_ ^
Road
or do
la i
La i
dR
S pee
rd leva ou
est
R rd oad
Ro a
ad W
ney
Fo
Cree on
Do w
Ro Laird
H an l
kB
Trail Pione er
iver
t
r
en a La
G
¯ (
ne
a Ro
Se
Nisk
1. Coordinate System: NAD 1983 UTM Zone 17N 2. Base features produced under license with the Ontario Ministry of Natural Resources and Forestry © Queen's Printer for Ontario, 2016.
In 2008, Union Gas initiated plans to expand its existing Guelph Line natural gas pipeline system by constructing a new 12-inch (323.9-millimeters) diameter steel natural gas pipeline. An Environmental Report (ER) was completed which identified a Preferred Route for the pipeline along Wellington Road 35. To meet the customer demand for natural gas at the time, the pipeline was installed up to an end point on Wellington Road 34. Union Gas is now proposing to complete the remaining section of pipeline between Wellington Road 34 and Forestell Road. Union Gas has retained Stantec Consulting Ltd. (Stantec) to review the previously completed Environmental Report and address potential changes that may have occurred, and to meet the intent of the Ontario Energy Board’s (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario, 6th Edition (2011). The Environmental Report will accompany Union Gas’ application to the OEB, whose review and approval is needed before this project can proceed. If approved by the OEB, construction is targeted for spring 2017. If you have questions or comments regarding the project, please contact: Steve Thurtell, M.Sc., P.Ag., CISEC Stantec Consulting Ltd. Senior Project Manager Phone: (519) 780-8108