Water system - City of Port Orford

Report 9 Downloads 85 Views
City of Port Orford Water Supply Expansion Phase I – Distribution System Phase II – Hubbard Creek Impoundment

City of Port Orford Water Supply Expansion Presented by: City of Port Orford SHN Consulting Engineers & Geologists, Inc.

Water Supply Expansion Project 

Acknowledgements: Oregon Infrastructure Finance Authority (Community Development Block Grant).  Technical Assistance Grant  Oregon Water Resources Department  USDA Rural Utilities Services – TA Grant  Rural Community Assistance Corporation  City of Port Orford City Council 

Water Supply Status 

2005 Water Master Plan Shortage of Raw Water Supply  Alternatives to Expand Source 

N. Fork Reservoir Expansion  New (additional) North Fork Reservoir  Garrison Lake  Do Nothing 

Water Loss (Yr 2000 @ 22%)  Water Loss (Yr 2010 @ 57%) 

Opinion of Probable Cost 

Phase 1--Distribution System 



Phase 2--Reservoir 



$ 13,145,000 $ 3,829,000

Application in to USDA RUS for ARRA Funding for $ 14,000,000

*Based

on Preliminary Engineering Report

Distribution Phase 1

Phase I Water Distribution System Improvements

Water distribution system leaks

Distribution system piping System

consists of 15 miles of water lines 12 miles of Asbestos Cement pipe 3 miles a mix of PVC and other pipe Oldest located (so far) is from 1926 Most was installed in the 1950s and 1960s

6

Distribution system pump stations

pump stations, necessary due to terrain Portions of system less than 20 psi No capacity to allow additional connections to some of the pump stations No fire flow in higher elevation areas Age of pump stations causing maintenance problems (parts availability, reliability etc.)

Types of System Failures

Phase 2 Reservoir Expansion

Water Supply Status 

2010 Situation Critical Shortage of Raw Water Supply  Alternatives to Expand Source 

N. Fork Reservoir Expansion  New (additional) North Fork Reservoir  Garrison Lake  Do Nothing 

Water Loss (Yr 2009 52% - Yr 2010 @ 57%)  Less Than Average Year – Requires Conservation 

N. Fork Hubbard Creek Reservoir

N. Fork Hubbard Creek Reservoir

Water Supply Status 

2010 Situation Critical Shortage of Raw Water Supply  Distribution System is Failing  Continue Leak Detection and Repair  Water Loss (Yr 2010 @ 57%)  PER/EA – Evaluation of Expanding Source 

Replacing Distribution System  Expansion of N. Fork Reservoir 



Funding Applications

Water Consumption Practices

Recommendations 

Reduce Water Losses to Less than 10% 





Replace Distribution System

Implement Conservation During Drought (15% Reduction in Water Usage) Expand Existing Impoundment 59 acre-feet (19.4 Million Gallons)  38 foot Dam Height 



Release Minimum Stream Flow - 0.14 cfs

Phase II – Expanded Reservoir

Proposed Earthen Dam

Section of Proposed Dam & Intake

Section of Proposed Dam and Primary Spillway

Current Water Rates 2010 Base rate, incl. first 2000 gallons $27.08 2001-5000 gallons $6.49 5001-10000 gallons $8.49 10001-20000 gallons $9.49 20001 + gallons $10.49

Water bill calculation Usage 4400 gallons Base rate $27.08 2400 gallons @ 6.49/M $15.58 Total bill this customer $42.66

Wastewater Rates Base Rate (no gallons included) Usage rate per thousand gallons

$37.08 $6.13

Wastewater Bill Calculation Usage 4400 gallons Base Rate Usage (at $6.13/thousand gallons) Total for this customer

$37.08 $26.97 $64.05

“Average Customer” water and waste water bill Average customer 4400 gallons of water/wastewater per month. Water Bill Wastewater Bill

$42.66 $64.05

Total bill for “average” customer $106.71

Water system operating budget Personal Services Materials and Services(O & M) Annual debt service Total Costs to operate water system FY2010 revenue (charge for water) Net loss for FY2010

$183,760 $109,631 $72,450 $365,841 $342,368

Water system total usage 667 utility accounts Average use per account 4400 gallons/ month Average amount of water sold/month 2,488,814 2010 total data Total water treated for the year 67,493,004 Total water sold for the year 29,865,768

Total water fund revenue 667 connections @ $27.08 2400 gallons X 6.49/M X 667 Total revenue generated

$216,748 $124,702 $341,450

Water system (only) debt Water system debt principal $348,495 Water system debt interest $67, 529 Debt total for water only $416,024

Distribution system (phase 1) funding package Grant funds

CDBG $1.895 M USDA $1.250 M

Loan funds

SDW USDA

$6.0 M $4.0 M

Total package

$13.145 M

Payment and interest calculations $4,000,000 loan amount, 3.5% interest, 40 years $6,000,000 loan amount, 1% interest, 30 years Rate based payback Payment is 419,797.81 per year, or approximately $52.45 per customer per month. Total water (only) bill for this scenario is $94.45 Property Tax based payback General Obligation, 100,000,000 assessed value $4.1980 per thousand of assessed value

Payment based on $6M General Obligation bond and $4M Revenue Bond General Obligation bond $2.3249 per thousand of assessed value. Revenue Bond requires rate increase of $23.40 per month per customer.

COUNCIL DECISION REQUIRED: If the vote for either the general obligation bond fails, or the revenue bond fails, the project cannot be completed. Both MUST pass in order for the funding package to be viable.

This ends the presentation