existing conditions

Report 4 Downloads 148 Views
NOTE: 1. UTILITY LOCATIONS AND SIZES ARE APPROXIMATE. CONTRACTOR TO WORK WITH STATE PARKS TO LOCATE UTILITIES. CONTRACTOR TO VERIFY SIZE AND TYPE OF UTILITY.

LEGEND E

E OHP

S

S

W

W

BURIED ELECTRIC POWER LINE OVERHEAD POWER LINE BURIED SEWER LINE BURIED WATER LINE WATER SPIGOT

100% Design Draw in Not Fo gs r Cons t r u Plo t D ction ate: 9/11/20 16

A

EXISTING CONDITIONS 0

60'

120'

Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER:

09/16

DRAFTER: Lon Franson

09/16

DRAFTER: Conna Rohbock

Eric Dixon

09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK EXISTING CONDITIONS

M1

NOTES: 1.

2.

LEGEND

TREES TO REMAIN WHERE POSSIBLE. OBTAIN APPROVAL FROM ENGINEER PRIOR TO REMOVAL OF ANY TREE.

BREAKUP CHIP SEAL BEFORE FILL PLACEMENT

BREAKUP CHIP SEAL PRIOR TO PLACEMENT OF FILL. NO PIECES GREATER THAN 6-INCHES IN ANY DIRECTION TO REMAIN.

3.

SALVAGE FOR REUSE ANY TABLES, GRILLS, AND FIRE PITS WITHIN THE FILL AREA.

4.

ALL CONCRETE AND DEBRIS WITHIN THE FILL AREA TO BE REMOVED AND MUST BE DISPOSED OF IN AN APPROVED LANDFILL.

5.

BOULDERS PLACED TO PROTECT UTILITIES OR OTHER IMPROVEMENTS TO BE SALVAGED AND REPLACED.

6.

SALVAGE BOULDERS IN DEMOLITION AREAS FOR REUSE TO MATCH EXISTING.

REMOVE GRASS PRIOR TO FILL PLACEMENT

ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 t o D N

DEMOLITION PLAN

B

0

60'

Plo

120'

t

Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER:

09/16

DRAFTER: Lon Franson

09/16

DRAFTER: Conna Rohbock

Eric Dixon

09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK DEMOLITION PLAN

M2

ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 t o N tD Plo

C

EARTHWORK PLAN 0

60'

120'

Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER:

09/16

DRAFTER: Lon Franson

09/16

DRAFTER: Conna Rohbock

Eric Dixon

09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK EARTHWORK PLAN

M3

100% Desig n Draw Not Fo ings r Con struct Plo t D ion ate : 9/11 /2

016

LEGEND ELECTRICAL PEDESTAL AND WATER SERVICE, ACTUAL LOCATION DETERMINED BY STATE PARKS

NOTES: 1. CONTRACTOR TO VERIFY PIPE SIZE AND TYPE BEFORE ORDERING MATERIALS. 2. ALL SPRINKLER SYSTEM CONNECTIONS TO CULINARY WATERLINE TO HAVE BACKFLOW PREVENTION, PER CODE. 3. PLACE 4 INCHES OF 3/4-INCH GRAVEL IN FILL AREA WHERE GRAVEL IS CURRENTLY LOCATED.

D

STATE PARK IMPROVEMENTS PLAN 0

15'

30'

60'

Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER:

09/16

DRAFTER: Lon Franson

09/16

DRAFTER: Conna Rohbock

Eric Dixon

09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK IMPROVEMENTS PLAN

M4

gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 : Not lot Date

STATE PARK IMPROVEMENTS PLAN

E

0

15'

30'

P

60'

Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16 09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK IMPROVEMENTS PLAN

M5

6240

6230 6" OF ROADBASE FOR ROAD/PARKING LOT, MATCH EXISTING

FINISHED SURFACE EXISTING ROAD EXISTING SURFACE

6230

6220 6" OF ROADBASE FOR 15' WIDE ROAD FINISHED SURFACE

EXISTING SURFACE

ZONE 2 FILL EXISTING PARKING LOT

6220

6210 ZONE 2 FILL EXISTING ROAD

6210

6200

6200

6190 0+00

1+00

2+00

3+00

4+00

5+00

6+00

0+00

1+00

CAMPING AREA PROFILE

F

0

40'

80'

0

Horizontal Scale 4'

8'

2+00

3+00

4+00

CAMPING AREA PROFILE

G

0

40'

80'

0

Horizontal Scale 4'

8'

gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 e: Dat N ot

Vertical Scale

Vertical Scale

Plo

NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16

Eric Dixon 09/16

PROJECT ENGINEER

SHEET

09/16

MILLSITE DAM REHABILITATION 09/16

t

STATE OF UTAH DIVISION OF WATER RESOURCES FERRON CANAL & RESERVOIR COMPANY

PROJECT MANAGER

5+00

EMERY

RE263

COUNTY

APPL. NO.

PROFILES

M6

6240

EXISTING SURFACE 6230 3" OF ASPHALT (BY OTHERS) FINISHED SURFACE 50'-10"

6220

6" OF ROADBASE ZONE 2 FILL

ZONE 2 FILL BOAT RAMP EXTENSION @ ~13:1 SLOPE

6210

6200 0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

PARKING AREA PROFILE

H

0

40'

80'

0

Horizontal Scale 4'

8'

gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 e: Dat N ot

Vertical Scale

Plo

NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16

Eric Dixon 09/16

PROJECT ENGINEER

STATE OF UTAH DIVISION OF WATER RESOURCES

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

09/16

t

EMERY

RE263

COUNTY

APPL. NO.

PROFILES

M7

6230

6240

3" OF ASPHALT (BY OTHERS) 6" OF ROADBASE EXISTING SURFACE

FINISHED SURFACE

6220

6230

6" ROADBASE FOR ROADS 15' WIDE

ZONE 2 FILL EXISTING SURFACE

FINISHED SURFACE 6210

ZONE 2 FILL

6220

PLACE 1' OF SAND FROM BORROW AREA 6A

6200

6210

6190

6200 0+00

1+00

2+00

J

3+00

0+00

4+00

1+00

2+00

PARKING AREA PROFILE 0

40'

80'

0

Horizontal Scale 4'

8'

EXISTING ROADS

3+00

K

Vertical Scale

4+00

5+00

BEACH AREA PROFILE 0

40'

80'

0

Horizontal Scale 4'

8'

gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 e: Dat N ot

Vertical Scale

Plo

NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

06/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\M1M2_State Park PV Mod

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16

Eric Dixon 09/16

PROJECT ENGINEER

SHEET

09/16

MILLSITE DAM REHABILITATION 09/16

t

STATE OF UTAH DIVISION OF WATER RESOURCES FERRON CANAL & RESERVOIR COMPANY

PROJECT MANAGER

6+00

EMERY

RE263

COUNTY

APPL. NO.

PROFILES

M8

16

gs win a r D ign ruction s e % D Const /2016 100 For ate: 9/11 t o D N lo t

4" THICK, 4000 PSI CONCRETE PAD

NEW PILOT ROCK FA-30, 30" DIAMETER, 9" TALL CAMPFIRE RING

P

10'

6" x 6", 8-GAUGE WELDED WIRE MESH

NOTE: CONSULT WITH STATE PARKS REGARDING PAD ORIENTATION AND FIREPIT LOCATION FOR EACH CAMPSITE.

L

SALVAGED ELECTRICAL PEDESTAL, RAISED 2 FEET

CAMPSITE CONCRETE PAD Not To Scale

NEW WOODFORD MODEL Y2-4 YARD HYDRANT WITH VACUUM BREAKER

SALVAGED PICNIC TABLE NEW PILOT ROCK FA-30, 30" DIAMETER, 9" TALL CAMPFIRE RING

FILL AROUND TREE

L M9

4" OF 3 4" GRAVEL WHERE GRAVEL IS CURRENTLY LOCATED

CAMPSITE CONCRETE PAD

PLACE SALVAGED BOULDER

NEW ROAD (PAVEMENT BY OTHERS)

4' MIN.

3'

NEW ROAD (PAVEMENT BY OTHERS)

APPROX. 2' OF FILL

6" OF ROADBASE EXISTING GROUND

ZONE 2 FILL

6" ROADBASE UNDER CONCRETE

6" OF ROADBASE

EXISTING CONDUIT PLACE 2 FT³ OF GRAVEL AROUND DRAIN

M NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

TYPICAL CAMPSITE WITH SERVICE Not To Scale

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\State Park Details

NEW 4" C900 PVC PIPELINE

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16 09/16

PROJECT ENGINEER

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

EMERY

RE263

COUNTY

APPL. NO.

STATE PARK CAMPSITE DETAILS

M9

56' P M10

CREATE SHALLOW SWALE TO DIRECT RUNOFF AROUND PAVILLION

R M10 4'

4'

7'

6" x 6" 8 GAUGE WELDED WIRE MESH

3'

11'-11"

21'-11"

24'

14'-4"

INSTALL SALVAGED GRILLS

6" x 6" 8-GAUGE WELDED WIRE MESH THROUGHOUT CONC. PAD

P M10

CXT PRECAST VAULT TOILET R M10

20'

3'

3'

INSTALL FIRE RING 20'-4"

gs win a r D ign ruction s e 6 ns t %D 100 For Co 9/11/201 : Not lot Date

4'

12'

PAVILLION CONCRETE PAD

N

Q

Not To Scale

VAULT TOILET PLAN Not To Scale

P

24' ELEVATION 6223.0 INSTALL POSTS & ANCHORS PER MANUFACTURER'S RECOMMENDATIONS

1'-7"

4"

MATCH THICKNESS OF RESTROOM SLAB

4"

4"

MATCH THICKNESS OF RESTROOM SLAB

ELEV. 6224.0

6" x 6" x8-GAUGE WELDED WIRE MESH 6" MINIMUM ROADBASE

4' INSTALL ANCHOR BOLTS PER MANUFACTURER RECOMMENDATIONS

P

PAVILLION SECTION

R

Not To Scale NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

DATE

INITS.

6" MINIMUM ROADBASE

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: Layne Jensen

09/16

APPROVED

Matt Call

DATE

09/16

CHIEF ENGINEER

FILE PATH & NAME

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\State Park Details

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: DRAFTER: Lon Franson DRAFTER: Conna Rohbock

Eric Dixon 09/16 09/16

PROJECT ENGINEER

Not To Scale

STATE OF UTAH DIVISION OF WATER RESOURCES

SHEET

FERRON CANAL & RESERVOIR COMPANY 09/16

MILLSITE DAM REHABILITATION

PROJECT MANAGER

Eric Dixon

VAULT TOILET SECTION

09/16

EMERY

RE263

COUNTY

APPL. NO.

MISCELLANEOUS PARK DETAILS

M10

6"

T M11

6" x 6" CONCRETE CURBS WITH #4 REBAR

#4 REBAR @ 12" O.C. EACH WAY

45'

7'

T M11

S

t

4' MIN. COVER

ZONE 2 FILL COMPACTED TO 95% MAX. ASTM D698

U

Not To Scale

NO.

STATE OF UTAH NATURAL RESOURCES Division of Water Resources

PIPE O.D. PLUS 24" MIN.

BOAT RAMP CONNECTION

DATE

INITS.

REVISIONS

WARNING

0

1 2

SCALE: AS SHOWN

DATE

DESIGNER: F. Last

09/16

\\Franson\Projects\UT\Eastern\Millsite Reservoir Drafting Assist\Drawings\Miscellaneous\State Park Details

2" x 6" CONCRETE WEDGE ANCHOR AT 60" O.C. (NUT WELDED AFTER TIGHTENING)

1. STAFF GAUGE TO BE BOLTED TO WESTERN SIDE OF BOAT RAMP. 2. STAFF GAUGE TO EXTEND FROM ELEVATION 6220.5 TO 6150.0 OR LOWEST POINT POSSIBLE. 3. WELD BEAD AT 1-FOOT VERTICAL ELEVATION AS SURVEYED. 4. INCLUDE MEAN SEA LEVEL ABOVE WELDED BEAD LINE AND LOCAL DATUM BELOW. LOCAL DATUM IS MEAN SEA LEVEL MINUS 5160 FEET.

IF THIS BAR DOES NOT MEASURE 0.5" THEN DRAWING IS NOT TO SCALE

DESIGNER: F. Last

09/16

DRAFTER: L. Franson

09/16

DRAFTER: F. Last

V

Not To Scale

APPROVED

F. Last

DATE

09/16

E. Dixon

PROJECT ENGINEER

STATE OF UTAH DIVISION OF WATER RESOURCES

09/16

MILLSITE DAM REHABILITATION 09/16

BOAT RAMP STAFF GAUGE Not To Scale

SHEET

FERRON CANAL & RESERVOIR COMPANY

PROJECT MANAGER

E. Dixon 09/16

6217 1057

TRENCH UNDER ASPHALT

CHIEF ENGINEER

FILE PATH & NAME

x 6" STEEL PLATE

1

12" MIN.

COMPACTED NATIVE SOIL

T

6218 1058

2"

NOTES:

3 4" MINUS COMPACTED TO 95% ASTM D698

6"

6" MINIMUM COMPACTED ROADBASE

1

ROADBASE COMPACTED TO 95% ASTM D698

EXISTING CONCRETE RAMP

6219 1059

PIPE O.D.

4" MIN.

6" MIN. ROADBASE IN PAVED AREAS

6" MIN.

DOWEL 4 INCHES INTO EXISTING CONCRETE. ANCHOR REBAR WITH ENGINEER APPROVED EPOXY. MINIMUM SPLICE LENGTH OF 24 INCHES. ROUGH FINISH TO MATCH EXISTING BOAT RAMP SURFACE NEW CONCRETE RAMP (4,000 PSI)

ELEVATION NUMBERS WITH LEGIBLE WELD BEAD (WELDED AT 1 FOOT VERTICAL INTERVALS)

PLACE TACK OIL BEFORE PLACING NEW ASPHALT (by others)

ASPHALT BY OTHERS (MATCH EXISTING ASPHALT THICKNESS)

6"

#4 @ 12" O.C. EACH WAY

Not To Scale

6220 1060

ings w a r n D ction g i s e ru % D Const /2016 0 0 1 For ate: 9/11 D N ot Plo

BOAT RAMP SECTION

EMERY

RE263

COUNTY

APPL. NO.

BOAT RAMP & TRENCH DETAILS

M11