MONITORING WELL (SURVEYED) EXISTING MONITORING WELLS / PIEZOMETERS / SOIL BORINGS (APPROXIMATE) DUKE ENERGY PROGRESS PRODUCTION WELL ( APPROXIMATE ) DUKE ENERGY PROGRESS PRODUCTION WELL ( SURVEYED )
MW-5B
PE-SW2 PE-SW2 NHC-SW4
NC
MW-5A MW-5B
W GH HI
MW-5C
AY
Mn
0H2
42
IL RA
1
A RO
CFPUA PRODUCTION WELL ( APPROXIMATE ) INVISTA REPORTED PRODUCTION WELL LOCATION DUKE ENERGY PROGRESS SUTTON PLANT 500 ft COMPLIANCE BOUNDARY
D
WASTE BOUNDARY PARCEL LINE (NEW HANOVER CO GIS) 2007 LiDAR CONTOUR MAJOR
120
2007 LiDAR CONTOUR MINOR MW-9
GENERALIZED GROUNDWATER FLOW DIRECTION SUPPORTED BY GROUNDWATER ELEVATION DATA OR TOPOGRAPHIC DATA
AW-3S
ANTICIPATED MONITORING WELL LOCATION ANTICIPATED ASH/SOIL BORING LOCATION
PZ-1 PZ-A
ANTICIPATED PIEZOMETER LOCATION
H2
ANTICIPATED GEOLOGIC CROSS SECTION PZ-B
PZ-7
SOURCES:
0H2 PZ-9
PZ-12
1.
2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014
2.
2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/
3.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83).
4.
PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY.
5.
2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx
6.
WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg
7.
NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29.
8.
THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29.
9.
THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA".
PZ-14 PZ-11 PZ-10D PZ-10S
MW-10
AW-1S
AW-1D
PZ-16
MW-13
NC AY W GH HI
PZ-18 PZ-15
Mn Fe PZ-17
MW-11
SW-4S
SW-4D
1
MW-27B
42
Mn Se
ILR
RA
AW-2S
AW-2D
PZ-20
PZ-4B PZ-2B
PZ-2A
(ug/l) where not otherwise indicated SO4 250 mg/l TDS 500 mg/l As 10 Ti 0.2 Sb 1 Se 20 Pb 15 B 700 Fe 300 Mn 50 Cd 2 Hg 1
G
PZ-5A
AW-3S
AW-3D PZ-23
PZ-1B
PZ-1 SPT-6
PZ-22
Mn Fe TDS B
MW-31C
PZ-6A
AW-7D
A -9
PZ
Mn Sb B MW-24B Ti PZ-24
CPT-7A
PZ-INT
CPT-5
SW-5S
SW-5D
MW-24C
Mn Fe B TDS MW-6B Ti
MW-6A
NEW ASH BASIN AREA
MW-6C
S. T. WOOTEN CORPORATION
SW-6S )
SW-6D PZ-26
Mn Fe B Pb
HA-1-1
GP-3
B-1
PT 8
Mn
HI 14 TE ST A
RO
G
P-
4
Mn Fe B Ti
MW-32C
Fe -3
Hg
ABSOLUTE PROPERTIES
Mn B
ROYMAC BUSINESS PARK
SOLAR FARM
MW-16
SW-3S
NHC-SW3 NHC-SW4
(NOT IN USE)
ILR
RD
EL
RD
D
OA
V BE
CFPUA
148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 www.synterracorp.com
RA
ON
NEW HANOVER COUNTY
Mn Fe B Cd
MW-15D
APPROXIMATE ROUTE OF THE NEW WILMINGTON BYPASS (I-140) KS
SB-2
MW-7C
NC HI AY W
GH
MW-20D
CAN CANAL
PE-SW4
ACCESS R
OAD
PE-SW5
1 42
PE-SW2
AL
CAPE FEAR RIVER
NHC-SW2
RIC
MW-20
DDRR
MAACC ROYYM
NHC-SW1
CONCRETE PAD MW-15
CT T MC
ED FR
AST
1200
OOM SSCC
(ABANDONED)
MW-7A MW-7B
600
MAOLA MILK & ICE CREAM CO.
MW-16D FORMER ASH DISPOSAL AREA
300
AANN TTRR
W
MW-28C
0
(IN FEET)
SW-3D
ANE RIC TIES HUROPER R P
MW-28B MW-14
T ME
IP AC SH YM ER RO RTN PA
FORMER ASH DISPOSAL AREA
600
CI
AW-5S
AW-5D
MW-19
3C
Mn Fe SO4 MW-21C B As MW-17
MW-13D
COOLING POND
GRAPHIC SCALE
LE RC
SAUNDERS & SAUNDERS, LLC
CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES.
1 42
MW-22B
SW-2S
SW-2D
Mn Fe B Ti
AY
MW-22C
MW-18 MW-13
HW
SPT-3
C
GP-1
HA-3-2
MW-3B MW-2C
1.
G HI
L
EZZELL TRUCKING
-1
PZ-1971
NC
B-3
PT
SPT-1
CA NA
SC
HA-2-2
MW-2A MW-2B
RD
AW-4D
MW-3A HA-3-1
ON
KS
GP-2
B-1
NOTE:
RIC
PZ-30
-3 PT C
CPT-2
AW-4S
ED
Mn B
4
10. MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AT PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE.
SW-1S
SW-1D
MW-23C
MW-23B T-
LCH HOLDINGS
FR
GP-6
SP
HA-2-1
T SU
Mn Fe B TDS
SPT-7
RD
IN
GP-5
OLD ASH BASIN AREA
KE LA
TE R
SPT-4
HA-1-2
N TO
US
MW-12
0(
SPT-2
GH
AW-6D
SPT-6
SCPT-5A
W AY
17
SPT-3A SPT-8
M
15A NCAC 02L .0202 Sulfate Total Dissolved Solids Arsenic Thallium Antimony Selenium Lead Boron Iron Manganese Cadmium Mercury
MW-34C
CPT-4 PZ-4A
PZ-21
PZ-3B
PZ-3A
D
PZ-19
MW-36C
COOLING POND WATER LEVEL = 9.60 ft PROVIDED BY DUKE ENERGY 06-02-2014
OA
D LAKE R SUTTON
NC WILDLIFE LAKE ACCESS
RAILROAD
PE-SW6A PE-SW6B
DRAWN BY: S. ARLEDGE DATE: 2014-09-25 CHECKED BY: H. FRANK DATE: 2014-09-25 PROJECT MANAGER: KATHY WEBB LAYOUT NAME: FIG 4 (CROSS SECTIONS) (24X36)
SUTTON ST EA
PE-SW6D
M PLANT R D
PE-SW3
D OA
ILR
RA
PE-SW6E
L.V. SUTTON ENERGY COMPLEX 801 SUTTON POWER PLANT RD WILMINGTON, NORTH CAROLINA MW-4A MW-4