FIG 6 (CROSS SECTIONS)(24X36)

Report 1 Downloads 50 Views
LEGEND TE PA E CL CIR

PA TE

BGMW-9

BACKGROUND MONITORING WELL (SURVEYED)

CMW-8

COMPLIANCE MONITORING WELL (SURVEYED)

E CL CIR N YL GG PE

WASTE BOUNDARY 100

BLE SS

PARCEL LINE (WAYNE CO)

ED

QU

LN

D

110

FLOW DIRECTION

IVE

DS

OL

100

R RD KE

GENERALIZED GROUNDWATER FLOW DIRECTION

A

QU

SUPPORTED BY GROUNDWATER ELEVATION DATA POINTS OR TOPOGRAPHIC DATA

90 E

RIV

D ER

AK

QU

2007 LiDAR CONTOUR MAJOR 2007 LiDAR CONTOUR MINOR

E

RIV

MIT

(SURVEYED)

500 ft COMPLIANCE BOUNDARY

D ER AK

DR IEL HF

MONITORING WELL OR PIEZOMETER DUKE ENERGY PROGRESS LEE PLANT

LN

I VE DR

RY MA

AL NE

PZ-2

80

AW-2D

ANTICIPATED MONITORING WELL LOCATION

AB-4

ANTICIPATED ASH/SOIL BORING LOCATION

APZ-3D

ANTICIPATED PIEZOMETER LOCATION ANTICIPATED GEOLOGIC CROSS SECTION

0

D DR

10

DS OL

IEL HF T I M

AD

RO

80

E AN

YL

DR

R MO ME

DLY IEN FR

90

IL RA

BGMW-10

90

DMW-2

110

SMW-2

D

OA

R SS

CE AC

100

0 10

90

80 SW-2D

90 80

SW-2S

AW-2D

90

BW-4S

80 PZ-3

ACTIVE ASH BASIN

BEVERDAM CREEK

SOURCES:

90 70

CMW-6R

80

70

AW-4D

CMW-6

90

AW-1D

1.

2012 AERIAL PHOTOGRAPH OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/

2.

2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014.

3.

PARCEL BOUNDARY WAS OBTAINED FROM WAYNE COUNTY GIS DATA AT http://www.waynegov.com/page/214

4.

DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83).

5.

2ft CONTOUR INTERVALS FROM NCDOT LiDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx

AW-1S

90

PZ-11 PZ-10

CMW-7 PZ-9

70

SW-3S

CMW-10

MW-4

NEUS

E RIV ER

70

70

70

80 PZ-2

70

MW-3

NEUS

E RIV ER

80

NOTE:

80

1.

CMW-8 DMW-1

70

80

SW-3D

70

AW-3D

80

BW-4D

BGMW-9

CMW-5 MW-2

CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES.

CTMW-1

GRAPHIC SCALE 400

0

150

400

800

(IN FEET)

COOLING POND

148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 www.synterracorp.com DRAWN BY: S. ARLEDGE DATE: CHECKED BY: H. FRANK DATE: PROJECT MANAGER: KATHY WEBB LAYOUT NAME: FIG 6 (CROSS SECTIONS)(24X36)

2014-09-25 2014-09-25

H.F. LEE ENERGY COMPLEX 1199 BLACK JACK CHURCH ROAD GOLDSBORO, NORTH CAROLINA

FIGURE 6 ANTICIPATED SAMPLE LOCATIONS ACTIVE ASH BASIN