lcor - 400 army navy drive project team - Arlingtonva

Report 1 Downloads 67 Views
LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION # 3 - April 24, 2014

PROJECT TEAM Developer: LCOR Architect:

SK+I Architectural Design Group

Counsel:

Walsh Colucci Lubeley & Walsh, P.C.

Civil Engineer:

Christopher Consultants, ltd.

Landscape Arch:

Oculus

Traffic Consultant:

Gorove/Slade

LEED Consultant:

Architectural Energy Corporation



1

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

2

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

3

DESIGN GOALS AT 400 ARMY NAVY

• World-class Architecture • Iconic residential building at landmark site • Create sense of place and an active, desirable place to live • Enhance the urban fabric with animated design • Hierarchy of elements; variation in placement of projections,height of roof elements, and steps in building • Diverse living opportunities with unique amenties

4

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

5

GREATER CONTEXT OF CRYSTAL CITY • The immediate neighborhood surrounding the project is undergoing a paradigm shift from an industrial / warehouse district to a vibrant, mixed-use community that will knit together Crystal City and Pentagon City • More than 2,000 new residential units are expected to be delivered in the neighborhood over the next five years, in addition to new retail, including Whole Foods, and infrastructure improvements along 12th and 15th Streets, including the Streetcar

6

CONTEXT DIAGRAM

Convenient walking distance to Pentagon City Metro Station Approx. 1600 FT / 3 blocks

Site

7

NEIGHBORHOOD DEVELOPMENT

Site

- Only 5.7% of existing Pentagon City / Crystal City inventory and 10.6% of the existing RB Corridor inventory was constructed within the last 5 years

Site

- There are 10,500 existing units in the Pentagon City and Crystal City area, and in this submarket there will be 2,000 new dwellings delivered in the next 5 years - The last new condominium was the Belle Vista in 1989 (202 dwelling units) - The most recent condominium conversion was the Waterford House in 1993 (65 dwelling units)

1

PENTAGON ROW

at Met Park 2 MILLENIUM 300 Dwelling Units

ACADIA at Met Park 3 THE 411 Dwelling Units

S. EADS ST. 8 1720 203 Dwelling Units

THE LENOX CLUB 9 385 Dwelling Units

at Met Park 4 GRAMERCY 378 Dwelling Units

Headquarters 10 BOEING 453,000 SF Office

CENTRE 5 PENTAGON 420 & 297 Dwelling Units (Kimco)

TRACT LOFTS 11 NORTH 184 Dwelling Units

6 PENPLACE Hotel and Office Towers

CRYSTAL DRIVE 12 1400 310,000 SF Office

MET PARK Phase 4-5 7 699 Dwelling Units

CRYSTAL DRIVE 13 1900 720,000 SF Office; 10,000 SF Retail

8

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

9

NEIGHBORHOOD AMENITIES

Site Site

1

WHOLE FOODS

2 PENTAGON CITY MALL

CITY DRIVE 3 CRYSTAL and Crystal City Underground

8 NATIONAL AIRPORT

9 12th St. Revitalization

TRACKS 4 CYCLE and Dedicated Bike Lanes

5 STREET CAR TRANSIT

6 LONG BRIDGE PARK

7 AQUATICS CENTER

10 15th St. Revitalization

10

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

11

EXISTING SITE CONDITIONS

• Site Area

71,861 SF

• Curb Cuts Pentagon Parking

Army Navy Drive

Marriott

400 Army Navy Drive

The Doubletree Hotel

10

th

• Proximity to Metro

Str e

et

S.

. 11th Street S . 12th Street S The Bennington

Pentagon City Metro

Crystal City Condominium



3 blocks (approx. 1600 feet)

38 feet at Army Navy Drive 35 feet at 11th Street S.

• Sidewalk Clear Widths

Army Navy Drive Old South Eads 11th Street S.

- - -

9.2’ and 10’ 17.4’ 8.3’

t

tree ds S

S. Ea

Pentagon Centre



• Grade Change (above sea level)

Verizon TSA Headquarters

4 existing (2 on Old South Eads)

• No significant landscaping with limited landscaped area

12

EXISTING BUILDING CONTEXT

A - Corner of S. Eads & Army Navy Drive

A

B - Army Navy Drive looking West

Building Information

B

• Built in 1963 • 235,445 SF Total Office Building • Floor to Floor Height: 10’-2” • Column Spacing: 20’ x 20’ • Vehicular drop-off at Old S. Eads • Building Orientation North to South Direction

13

EXISTING BUILDING CONTEXT

C - 11th Street S. Between Verizon & Site

C

D - 11th Street S. between Site and Hotel

D

14

EXISTING BUILDING CONTEXT

Northwest Corner of Site Looking West

On Interstate Looking South at adjacent site

F

E

15

EXISTING BUILDING CONTEXT

G - Corner of S. Eads & Army Navy Drive

H - Army Navy Drive looking West

G H

16

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

17

Crystal City Sector Plan

18

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION #3 - April 24, 2014

PRESENTATION GOALS April 24, 2014

• DESIGN GOALS • NEIGHBORHOOD CONTEXT • NEIGHBORHOOD AMENITIES • EXISTING CONDITIONS • SECTOR PLAN REVIEW • SITE PLAN EXISTING VS. PROPOSAL COMPARISON

19

AERIAL SITE PLAN COMPARISON

Existing Old S. Eads Street

Vacation of Old S. Eads

20

AERIAL SITE PLAN COMPARISON

Property Line with Vacation of Old S. Eads

21

AERIAL SITE PLAN COMPARISON

Property Line with Vacation of Old S. Eads

22

STREET SECTION

Key Plan

Street Section Looking North - Property Lines w/ Vacation of Old S. Eads

23

COMPARISON SUMMARY SLIDE

EXISTING CONDITIONS SHOWING RIGHT OF WAYS

PROPOSED CONDITIONS SHOWING VACATION

Key Plan

PROPOSED CONDITIONS AFTER VACATION

24

LCOR - 400 ARMY NAVY DRIVE SPRC PRESENTATION # 3 - April 24, 2014

THANK YOU

25