LEED 2009 for Neighborhood Development SLL PREREQUISITE 4: AGRICULTURAL LAND CONSERVATION Stage 2: LEED-ND Pre-Certified Plan
All fields and uploads are required unless otherwise noted.
ALL PROJECTS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Select one of the following: Connections Tool
Stage 2A. No change since Stage 1 Stage 2B. Change since Stage 1 Stage 2C. Did not submit at Stage 1
STAGE 2A No change has been made since submittals in previous stages that would affect credit compliance. Select one of the following: Option 1. Sites without affected soils Option 2. Infill sites Option 3. Sites served by transit Option 4. Development rights receiving area Option 5. Sites with impacted soils Up to 15% of the impacted soils area was permanently dedicated to community gardens and thus exempted from the density requirements and also counted toward mitigation requirement for the remainder of the site. (Optional) Upload SLLp4-6. The project team has uploaded a copy of draft or filed legally binding document permanently dedicating community gardens. Project team achieved SLL Prerequisite 4: Agricultural Land Conservation Stage 1 compliance.
STAGE 2B Provide updated versions of the items submitted at the previous stage.
STAGE 2C
LEED 2009 for Neighborhood Development SLL Prerequisite 4: Agricultural Land Conservation Form Version 2.0
Is the project located in a state or locally designated agricultural preservation district (does not equate to land-use zoning)? Yes No Upload SLLp4-1. The project team has uploaded a letter confirming that project conforms to applicable development regulations for an independent special service district autonomous from local government zoning. Select one of the following: Option 1. Sites without affected soils Option 2. Infill sites Option 3. Sites served by transit Option 4. Development rights receiving area Option 5. Sites with impacted soils
OPTION 1. SITES WITHOUT AFFECTED SOILS Upload SLLp4-2. The project team has uploaded a site base map with project boundary development footprint, and NRCS prime/unique/state-significant soils. The documentation provided for Upload SLL-22 demonstrates that the project development footprint does not contain NRCS prime/unique/state-significant soils.
OPTION 2. INFILL SITES The project team has completed PI Form 1, "Infill Site Determination" section, and the site is determined to be infill.
OPTION 3. SITES SERVED BY TRANSIT Select one of the following: The project team has documented compliance with SLL Prerequisite 1 Option 3 in Stage 2. The project team did not document compliance with Stage 2 SLL Prerequisite 1 Option 3. Select one of the following: Project has/will have access to commuter rail and/or ferry service only. Project has/will have access to combination of bus, streetcar, rail, and/ or ferry transit types.
LEED 2009 for Neighborhood Development SLL Prerequisite 4: Agricultural Land Conservation Form Version 2.0
From the transit tables uploaded for PI Form 3, Transit Service section: Percentage of dwelling units and nonresidential entrances within allowed walk distances:
%
Total number of transit trips each weekday: Total number of transit trips each weekend day:
OPTION 4. DEVELOPMENT RIGHTS RECEIVING AREA Upload SLLp4-3. The project team has uploaded a map with project boundary, development rights receiving area boundary (this can be a special non-base map) OR written descriptions of the receiving area and an explanation that demonstrates that the project meets receiving area criteria. Name of publicly administered TDR program:
OPTION 5. SITES WITH IMPACTED SOILS Upload SLLp4-7. The project team has uploaded a map with site base, project boundary, development footprint, NRCS prime/unique/state-significant soils, and any community gardens. From Upload SLLp4-7: Area of prime/unique soil encroached upon by development footprint:
acres
Total area of impact soil area permanently dedicated to community gardens (if none, enter "0"):
acres
Percent of impacted soil area dedicated to community gardens:
0
%
Note: Up to 15% of the impacted soils may be exempted from the density requirements and count toward the mitigation requirement if dedicated to community gardens.
Upload SLLp4-6. The project team has uploaded a copy of draft or filed legally binding document permanently dedicating community gardens. Residential buildable land will be adjusted for community gardens. (Optional) RESIDENTIAL LAND ADJUSTMENT Total dwelling units (from PI Form 1):
units
Total buildable residential land (from PI Form 1):
acres
Impacted soil area permanently dedicated for community gardens located on residential buildable land:
acres
Buildable residential land (adjusted for community gardens):
0
acres
Residential density (adjusted for community gardens):
0
DU/acre
LEED 2009 for Neighborhood Development SLL Prerequisite 4: Agricultural Land Conservation Form Version 2.0
% residential of total square footage (from PI Form 1):
%
Nonresidential buildable land will be adjusted for community gardens. (Optional) NONRESIDENTIAL LAND ADJUSTMENT Nonresidential square footage (from PI Form 1):
sf
Total buildable nonresidential land (from PI Form 1):
acres
Impacted soil area permanently dedicated for community gardens located on nonresidential buildable land:
acres
Buildable nonresidential land (adjusted for community gardens):
0
acres
Nonresidential density (adjusted for SLLp4 community gardens):
0
FAR
Nonresidential density (from PI Form 1):
FAR
% Nonresidential of total square footage:
%
Portion of impacted soil area designated for community gardens exempted from base densities:
0
%
Portion of impacted soil area designated for community gardens exempted from base densities cannot be greater than 15%.
Residential density (from PI Form 1):
DU/acre
% residential of total square footage (from PI Form 1):
%
Nonresidential density (from PI Form 1):
FAR
% Nonresidential of total square footage:
%
Metro/micro statistical area population (select one of the following): 250,000 or more Under 250,000 Table SLL-6. Mitigation Ratio - Population Over 250,000 Required Mitigation Ratio per Building Type
Required Mitigation Ratio per Unit of Buildable Land (to 1)
% of Total Building Land (%)
Residential
none
0
0
Nonresidential
none
0
0
Final required mitigation ratio (Acres of easement required for every acre of project on prime/unique/significant soil)
LEED 2009 for Neighborhood Development SLL Prerequisite 4: Agricultural Land Conservation Form Version 2.0
Table SLL-7. Mitigation Ratio - Population 250,000 Or Less Required Mitigation Ratio per Building Type
Required Mitigation Ratio per Unit of Buildable Land (to 1)
% of Total Building Land (%)
Residential
none
0
0
Nonresidential
none
0
0
Final Required Mitigation Ratio (Acres of easement required for every acre of project on prime/unique/significant soil)
0
Area of mitigation easement required (final mitigation ratio multiplied by impacted soil acreage, minus community garden acreage):
0
acres
Upload SLLp4-4. The project team has uploaded a map with off-site mitigation easements and locations in relation to project site. This can be a special non-base map. Area of mitigation easements (from Upload SLLp4-4):
acres
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.
SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload SLLp4-SC. The project team has provided additional documentation that supports the claim to special circumstances. (Optional)